Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IA-87-500, Forwards Results of Analysis of TLDs Exposed to Topaz Gemstones.Results Indicate Generally No Measurable Radiation Exposure from Gemstones within Uncertainty Limits of Measurement Sys + (ML20235L208)
- ML20235L208 + (ML20235L208)
- ML20235L215 + (ML20235L215)
- ML20235L218 + (ML20235L218)
- ML20235L227 + (ML20235L227)
- ML20235L235 + (ML20235L235)
- ML20235L236 + (ML20235L236)
- TXX-6780, Interim Deficiency Rept CP-87-82 Re Discrepancies Observed in Fire Control Panels.Listed Deviations,Including Specs & Design & Vendor Drawings Noted.Initially Reported on 870831. Corrective Action Not Given.Next Rept Anticipated by 871124 + (ML20235L238)
- ML20235L245 + (ML20235L245)
- 3F0289-12, Requests Discretionary Enforcement Associated W/Performance of Surveillance Required by Tech Spec 4.3.1.1.1.Licensee Proposes to Delay Performance of Next Monthly Test Until Plant Restarted Following Repair of Reactor Coolant Pump + (ML20235L246)
- ML20235L250 + (ML20235L250)
- ML20235L253 + (ML20235L253)
- IR 05000454/1987036 + (ML20235L255)
- ML20235L265 + (ML20235L265)
- ML20235L266 + (ML20235L266)
- ML20235L272 + (ML20235L272)
- ML20235L276 + (ML20235L276)
- ML20235L281 + (ML20235L281)
- ML20235L282 + (ML20235L282)
- IR 05000338/1988026 + (ML20235L286)
- W3P87-1782, Responds to Violations Noted in Insp Rept 50-382/87-17. Corrective Actions:Missing Locknuts Installed on Restraints MSSH-3084,SIRR-3006 & SIR-3008,other Disturbed Restraints Inspected & Training Session Will Be Held + (ML20235L288)
- ST-HL-AE-2977, Responds to NRC Re Violations Noted in Insp Rept 50-498/88-68.Corrective Actions:Phase B Isolation Requirements Incorporated in Emergency Operating Procedures & Team Formed to Conduct Enhancement Program + (ML20235L293)
- ML20235L296 + (ML20235L296)
- ML20235L299 + (ML20235L299)
- ML20235L303 + (ML20235L303)
- ML20235L307 + (ML20235L307)
- IR 05000275/1989003 + (ML20235L313)
- ML20235L315 + (ML20235L315)
- ML20235L322 + (ML20235L322)
- ML20235L326 + (ML20235L326)
- ML20235L327 + (ML20235L327)
- ML20235L331 + (ML20235L331)
- TXX-6775, Forwards Revised Response to Notice of Deviation Re Insp Repts 50-445/85-13 & 50-446/85-09.Corrective Actions:Out of Scope Observation Written by Inspector to Document Existence of Holes in Pipe Support Not Shown on Drawing + (ML20235L334)
- ML20235L335 + (ML20235L335)
- ML20235L343 + (ML20235L343)
- ML20235L345 + (ML20235L345)
- ML20235L346 + (ML20235L346)
- ML20235L353 + (ML20235L353)
- ML20235L355 + (ML20235L355)
- ML20235L357 + (ML20235L357)
- IR 05000324/1989003 + (ML20235L359)
- TXX-6731, Final Deficiency Rept CP-87-62 Re Use of Nomographs to Design Seismically Supported Class 5 Piping Sys.Initially Reported on 870824.Spec 2323-MS-46B Will Be Revised to Include Appropriate Criteria for Use of Nomagraphs + (ML20235L360)
- ML20235L362 + (ML20235L362)
- ML20235L368 + (ML20235L368)
- ML20235L369 + (ML20235L369)
- ML20235L371 + (ML20235L371)
- ML20235L376 + (ML20235L376)
- ML20235L377 + (ML20235L377)
- IR 05000321/1988042 + (ML20235L380)
- IR 05000293/1987036 + (ML20235L381)
- ML20235L382 + (ML20235L382)