Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215G064 + (ML20215G064)
- IR 05000266/1986015 + (ML20215G065)
- ML20215G066 + (ML20215G066)
- ML20215G069 + (ML20215G069)
- ML20215G070 + (ML20215G070)
- ML20215G072 + (ML20215G072)
- ML20215G073 + (ML20215G073)
- ML20215G075 + (ML20215G075)
- ST-HL-AE-1775, Forwards Response to 861001 Request for Addl Technical Justification for Use of Coupled Analysis for 12-inch & Larger Piping Connected to Reactor Coolant Loop,Per Util 860915 FSAR Changes.Related Correspondence + (ML20215G076)
- ST-HL-AE-1752, Forwards Amend 55 to Fsar,Incorporating Revised Criteria Re Jet Length,Increased Cumulative Usage Factor,Inservice Surveillance of post-irradiated Fuel Assemblies & General Updates & Revs + (ML20215G079)
- NLS8600254, Informs That SPDS Declared Operable on 860731,meeting 850829 Confirmatory Order Requirement.Sys Reliability Demonstrated by Results of 1,000 H Run Test + (ML20215G081)
- ML20215G083 + (ML20215G083)
- ML20215G084 + (ML20215G084)
- ML20215G086 + (ML20215G086)
- ML20215G087 + (ML20215G087)
- ML20215G089 + (ML20215G089)
- ML20215G090 + (ML20215G090)
- ML20215G091 + (ML20215G091)
- ML20215G093 + (ML20215G093)
- ML20215G094 + (ML20215G094)
- ML20215G095 + (ML20215G095)
- ML20215G096 + (ML20215G096)
- 05000312/LER-1986-023, :on 861111,inadequate Voltage Supplies Sent to Control Room/Technical Support Center HVAC Under Certain Worst Case Conditions.Caused by Inadequate Engineering Review.Ecn R-0911 Written + (ML20215G097)
- ML20215G098 + (ML20215G098)
- PNO-III-86-113, on 861009,three Licensee Employees Received Minor Facial Burns from Small Release of UF6 from Process Equipment Inside Plant.Workers Treated Onsite & Returned to Work.No Offsite Release of UF6 Occurred + (ML20215G099)
- ML20215G100 + (ML20215G100)
- ML20215G101 + (ML20215G101)
- ML20215G102 + (ML20215G102)
- ML20215G103 + (ML20215G103)
- ML20215G105 + (ML20215G105)
- ML20215G108 + (ML20215G108)
- ML20215G109 + (ML20215G109)
- ML20215G110 + (ML20215G110)
- IA-86-797, Final Response to FOIA Request for Documents Re 1981-86 Insps of Ga Technologies,Correspondence Re Nuclear Fuel Fabrication Facility & Eia (NUREG-0994).App a Documents Available in PDR + (ML20215G111)
- ML20215G111 + (ML20215G111)
- ML20215G113 + (ML20215G113)
- ML20215G114 + (ML20215G114)
- ML20215G116 + (ML20215G116)
- ML20215G117 + (ML20215G117)
- ML20215G118 + (ML20215G118)
- ML20215G119 + (ML20215G119)
- ML20215G122 + (ML20215G122)
- ML20215G123 + (ML20215G123)
- ML20215G125 + (ML20215G125)
- ML20215G126 + (ML20215G126)
- ML20215G127 + (ML20215G127)
- ML20215G128 + (ML20215G128)
- ST-HL-AE-1842, Submits Addl Info,Per SER Open Item 18 Re Reduction of Bmi Thimble Vibration.Sleeve & Flow Limiting Devices Will Be Installed Prior to Fuel Loadings + (ML20215G130)
- ML20215G131 + (ML20215G131)
- ML20215G133 + (ML20215G133)
- ML20215G134 + (ML20215G134)