Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214U697 + (ML20214U697)
- ML20214U699 + (ML20214U699)
- ML20214U704 + (ML20214U704)
- ML20214U707 + (ML20214U707)
- ML20214U708 + (ML20214U708)
- ST-HL-AE-2194, Forwards Annotated Rev to FSAR Section 7A.II.K.3.17 Re NUREG-0737 Position on Repts of Outages of Eccs.Info Re ECCS Outages Will Be Submitted in Written Rept Following 5 Yrs of Commercial Operation.Rev to Be Incorporated in Future Amen + (ML20214U710)
- ML20214U711 + (ML20214U711)
- ML20214U713 + (ML20214U713)
- ML20214U715 + (ML20214U715)
- ML20214U720 + (ML20214U720)
- IR 05000317/1986010 + (ML20214U721)
- ML20214U722 + (ML20214U722)
- ML20214U723 + (ML20214U723)
- 05000293/LER-1987-006, :on 870506,structural Analysis of 870313 Insp of Hydraulic Control Unit Frames Concluded That Design Basis Operability of Units Could Not Be Established for Loading Conditions.Cause Undetermined.Frames Restored + (ML20214U725)
- ML20214U730 + (ML20214U730)
- ML20214U731 + (ML20214U731)
- ML20214U732 + (ML20214U732)
- ML20214U734 + (ML20214U734)
- ML20214U735 + (ML20214U735)
- ML20214U736 + (ML20214U736)
- ML20214U738 + (ML20214U738)
- ML20214U741 + (ML20214U741)
- ML20214U746 + (ML20214U746)
- ML20214U747 + (ML20214U747)
- PNO-III-87-078A, on 870529,NRC Insp Determined That Shifts Supervisor Observed Dozing on 870524.Licensee Appears to Have Violated NRC Shift & Overtime Policies.Addl Senior Reactor Operators Assigned on Shift to Eliminate Overtime + (ML20214U748)
- ML20214U749 + (ML20214U749)
- ML20214U750 + (ML20214U750)
- ML20214U751 + (ML20214U751)
- ML20214U754 + (ML20214U754)
- TXX-6381, Final Deficiency Rept CP-77-D Re Operation of Safeguard Actuation Reset Circuitry.Initially Reported on 770920. Operating Procedures ICI-4013A & ICI-4014A Revised & in Review Prior to Issuance.Procedures Expected by 870930 + (ML20214U756)
- ML20214U762 + (ML20214U762)
- 05000275/LER-1986-009-01, :on 860820,during Surveillance Test Procedure M-16N,inadvertent Actuation of Auxiliary Feedwater Pump 1-3 Occurred.Caused by Personnel Error.Individual Counseled. Procedure Will Be Revised + (ML20214U763)
- ML20214U764 + (ML20214U764)
- IR 05000423/1987008 + (ML20214U769)
- ML20214U771 + (ML20214U771)
- ML20214U773 + (ML20214U773)
- ML20214U774 + (ML20214U774)
- ML20214U779 + (ML20214U779)
- IR 05000285/1986026 + (ML20214U782)
- ML20214U784 + (ML20214U784)
- ML20214U785 + (ML20214U785)
- ML20214U788 + (ML20214U788)
- ML20214U794 + (ML20214U794)
- ML20214U798 + (ML20214U798)
- DCL-86-342, Forwards Proposed Changes to FSAR Chapter 17,to Be Incorporated Into Appropriate FSAR Update Rev,Pending Approval + (ML20214U800)
- U-600945, Forwards Changes to Chapter 14 of Fsar,Per License Condition 2.C.8 + (ML20214U807)
- ML20214U808 + (ML20214U808)
- ML20214U809 + (ML20214U809)
- IR 05000317/1987005 + (ML20214U811)
- ML20214U812 + (ML20214U812)
- ML20214U814 + (ML20214U814)