Rev 1 to TVA Employee Concerns Special Program,Welder Training Program for Const & Nuclear Operations
ML20214U779
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/20/1986
From: Russell J, Stewart D
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20214G966 List:
References
WP-07, WP-07-R01, WP-7, WP-7-R1, NUDOCS 8612090393
Download: ML20214U779 (10)


Text

{{#Wiki_filter:* 1 I

  • REPORT NUMBER: WP-07
          .                     TVA EMPLOYEE CONCERNS SPECIAL PROGRAM REPORT TYPE: Welding Project                                        REVISION NUMBER: 1 TITLE: Welder Training Program for Construction and Nuclear Operations REASON FOR REVISION: N/A SWEC SUNRARY STATEMENT: N/A u

b - PREPARATION PREPARED BY: Original Sinned By R. D. Brimas _ 08-12-86 _ SIGNATURE DATE { REVIEWS PERR: Original Signed By J. F. Lewis 08-12-86 SIGNATURE DATE TAS: TECHNICAL VIEW ONLY

                  ~

h ~

                                        /

SIGNATURE N N $b DATE CONCURRENCES OriEinal SiEned By CEG-H: L. E. Martin O')-18-86 SRP:3e$bd ll*26-IL SIGNATURE DATE Q SIGNATURES DATE APPROVRD BY: ECSP'HANAGif

                                                   $" h DATE N/A MANAGER OF NUCLEAR POWER         DATE
                           ,                                  CONCURRENCE (FINAL REPORT ONLY)
         *SRP Secretary's siEnature denotes SRP concurrences are in files.

2242T 8612090393 861124 PDR P ADOCK 05000327 PDR j _ -. __ a

             'e 1.'
   . s 's WELDING PROJECT GENERIC EMPLOYEE CONCERN
 .       1 6_-
      '                                              EVALUATION REPORT REPORT NUMBER:     WP-07-SON, R1 DATE 08/12/86

SUBJECT:

WELDER TRAINING PROGRAM FOR CONSTRUCTION AND NUCLEAR OPERATIONS CONCERNS CONSIDERED: IN-85-706-001 11-85-045-001 EX-85-008-001 lR1 Original Signed by Robert D. Briggs 8/12/86 , OC, WP PREPARED BY Original Signed by James F. Lewis 8/12/86 , OC, WP REVIEWED BY Original Signed by R. P. Lynsker 8/13/86 , QA, WP

           ,g REVIEWED BY s

Original Signed by L. E. Martin 8/18/86 , CEG-H.._ WELDING REVIEWED BY-i APPROVED BY l i '. PROGRAM MANAGER l V" ' ( l l l l l l ' Revision 1 to this repcet is being issued to add an employee concern which has been evaluated and determined to involve issues previously evaluated, dispositioned, and closed by the WP. f i.') , 00410 I

          'o       '

s . . G_ENERIC EMPLOYEE CONCERN J';?

SUMMARY

SHEET Report Number: WP-07-SON. R1

SUBJECT:

WELDER TRAINING PROGRAM FOR CONSTRUCTION AND NUCLEAR OPERATIONS I. CONCERNS CONSIDERED: IN-85-706-001 XX-85-045-001 EX-85-008-001 lR1 II. ISSUES INVOLVED

1. The TVA Welder Training Program is inadequate for nuclear construction.
2. Welder performance qualification tests do net test a welder's overall ability.

III. STATEMENTOFCONCERN[ISSUEVALIDITY .. Validity: Y ,N X , Substantiated: Y ,N X .

       , $.,             IV. EFFECT ON HARDWARE AND/OR PROGRAM
      .h None
                         .V. JUSTIFICATION None VI. RECOMMENDATION AND/0R CORRECTIVE ACTION NEEDED None VII. REINSPECTION NEEDED: Y                  ,N    X   .

VIII. ISSUE CLOSURE Based on this report. II. ATTACHMENTS

1. Text of Employee Concerns l lR1 t
2. Excerpts From Bechtel Audit - Key Element 3.0, 4.0, and 5.0 I t i
       ' '                                                        Page 1 of 1 l

i 00410 l l i

s. GENERIC EMPLOYEE CONCERN Report Number: WP-07-SON, R1

   ~

Report

Title:

WELDER TRAINING PROGRAM FOR CONSTRUCTION AND OPERATION I. SCOPE OF EVALUATION This engineering analysis covers the following WBN and BLN concerns deemed to have possible generic implications to SQN: IN-85-706-001 XX-85-045-001 EX-85-008-001 lR1 II. ISSUES ADDRESSED BY CONCERNS Each concern was analyzed to determine the issues voiced by the concerned individuals. These issues are as follows:

1. The TVA Welder Training Program is inadequate for nuclear construction.
2. Welder performance qualification tests do not test a welder's overall ability.

() III. CONCERN VALIDITY OR SUBSTANTIATION SQN and other TVA construction sites have historically had extensive welder training programs. SQN had a welder training facility in

                             . operation frc:a the beginning of construction at SQN until approximately
                             ~1981. This training program put heavy emphasis on individual Instruction end training to perform specific tasks such as open butt GIAW pipe welding. Instructors were craftsmen with considerable skill and experience in all aspects of welding.-

There is no regulatory requirement which mandates a welder training program. These programs were developed for the purpose of development of a qualified labor pool of welders from which expert craftsmen could be drawn who would be capable of performing quality work in an efficient manner. This is a prudent business practice. These programs also increased the probability that welders would pass the welder performance qualification test prior to making production welds. The requirements for wolder performance qualification testing outlined in AWS, ANSI, and ASME B&PV Codes address the issue of skill level. These codes state that the purpose and intent of individual welder performance qualification tests are to determine the welder's ability to produce sound welds. This qualification test is the requirement mandated by codes and standards to determine the minimum skill level of welders, not the content or existence of a welder training program. 3-e Page 1 of 2 00410 ,

4. ,

WP.-07-SQN, R1 1

                 -                            The requirements for welder performance qualification tests are                                                                     1
         --                                   incorporated into both the OC and NO Quality Assurance Programs, and                                                               j their details are well documented. They have been audited through the ASME Implementation Survey for Certificates of Authorization and by                                                                 ;

1 organizations such as INPO and NRC. The Bechtel SQN Implementation Audit performed in January 1986, .. directly addressed this issue in Key Element 3.0, " Initial Welder or Welding Operator Qualifications," Key Element 4.0, " Maintenance of Welder or Welding Operator Qualifications," and Key Element 5.0, > " Renewal of Welder and Welding Operator Qualifications." For both OC and NO, the audit indicates that the programs met upper-tier - commitments and were effectively implemented. The SQN Reinspection Program also provides objective evidence of welder skill. No substantial welding problems were discovered which were attributable to welder skill. . In summary, the issues considered in these concerns are not substantiated due to the following factors:

1. There is no requirement relative to welder training prograss.
2. The base requirement for welder skill is the Welder Performance
Qualification Test Program.
1) 3. The Welder Performance Qualification Test Program is outlined in both the OC and NO QA programs.
4. The Bechtel SQN Implementation Audit has established that these programs have been and are being effectively implemented by OC and

! NO. f 5. No indications of a generic welder skill problem was discovered by the SQN Reinspection Program. l Based on the forescing analysis, the issues considered in these concerns are closed. Na' Page 2 of 2 L 00410

Attachment 1 Page 1 of 1 07/25/86 (EMPLOYEE CONCERNS) 03:44:38 CAT ISSUE PLANT PRIORITY ORG QTC EGG INSP SD RD GD 10 ------CONCERN------ _ WE SFB W 1 EGG A5 512 Y SR B IN-85-706-001 KEYWORDS: QUALIFICATION CRAFTSMAN SPECIFIC PROB: WCPTT WELDERS WHO WENT THROUGli TVA'S WELDER TRAINING PROGRAM HAVE INSUFFICIENT TRAINING AND EXPERIENCE TO HANDLE ALL VARIABLES INVOLVED TO PERFORM ADEQUATE WELDS FOR A NUCLEAR INSTALLATION. THIS INADEQUACY HAS CREATED A LOG OF REWRI. CI HAS NO MORE DETAILS. IR: STAT: RC: WP-07-SQN TECHNICAL COMMENTARY: CAT ISSUE PLANT PRIORITY ORG QTC EGG INSP SD RD GD IO ------CONCERN------ MP B 1 ' EGG AS 512 N NS A XX-85-045-001 KEYWORDS: QUALIFICATION CRAFTSMAN SPECIFIC PROB: WCPQW BELLEFONTE-TVA POLICY ALLOWS FOR PERSONEL TO BE SENT TO THE TEST SHOP AND IN A

         ..            SHORT-TIME BE CERTIFIED AS AN ELECTRICAL WELDER. THESE WELDERS DO PASS A STRICT
        +/             TEST DOES NOT TEST THEIR ABILIIY WHEN DEALING WITH ALL THE VARIABLES AN EXPERIENCED WELDER CAN HANDLE. INSUFFICIENT WELDER TRAINING (INSP RPT#

I-85-352-BLN) IR: I-85-352-BLN STAT: RC: WP-07-SQN TECHNICAL COMMENTARY: CAT ISSUE PLANT PRIORITY ORG QTC EGG INSP SD RD GD IO ------CONCERN------ l WE W 1 EGG 511, Y SR EX-85-008-001 1 l XEYWORDS: QUALIFICATION CRAFTSMAN SUBJOURNEYMEN PROB: WCPTT l 1 l SUBJOURNEYMEN USED TO DO WORK THAT THEY'RE NOT QUALIFIED TO DO: THEY NEEDN'T ' l l HAVE ANY SPECIFIC TRAINING, BUT DO WORK (EG PIPE FIT-UPS AND WELD ON 1/4" R1 l LINES) NORMALLY DONE BY A' CLOSER TECHNICAL SUPERVISION THAN TVA PROVIDES. WHEN l CRAFT COMPLAIN, THEY ARE " CHEWED OUI" BEYOND ALL REASONABLE LIMITS. NO l MORE DETAILS KNOWN. l l IR: IN-85-130-001 V STAT: RC: WP-07-SQN I l TECHNICAL COMMENTARY: l l l ) l IN PROCESS UNION POLITICS -

Attachment 2

              .                                                                                Page 1 of 4
   .g.3                                                        KEY ELD 1ENT NO. 1.0     -

T ..) .- ~- I k., OFFICE OF CCNSTRUCTICN PREPARATION FOR AUDIT OF WELDING ACTIVITIES Prior to the start of the audit, the audit team developed an audit pl identified applicable documents, specific manuals, specificationsanand and

          '             procedures which described and implemented the TVA welding activities            .
                                                                               ~      '

The audit team developed an audit checklist to address a'11 elements

                      . identified in the TVA work plan in addition to analysis of employee concerns for significance and integration into the checklist.

The from audit teamTVA applicable identified and selected a cross section of welded systems specifications. Welds were randomly selected from drawings applicable to each individual system for programmatic audit . KEY ELDIENT 2.0 OFFICE OF CONSTRUCTICN ADEOUACY OF DESIGN OUTPUT DOCUMCITS f For items selected for audit, drawings, welding procedures and supporting

          .           records were procedures.       reviewed and showed compliance with the TVA program and OBSERVATION                                                                                                    . . .
                    'One observation was noted during the audit of the welding output documents                .

organizational group.The TVA detailed welding procedures (DNP) did not show By showing the name.of the key unit that is 3 welding documents could have been readily resolved. responsible f KEY ELDIENT 3.0 OFFICE OF CONSTRUCTION INITIAL WELDER OR WELDING OPERATOR QUALIFICATICNS Based on audit of welder qualification records and supporting documentation ' TVA welders were qualified in accordance with TVA programs and procedures . 0031X l ,_) . i Page 3 of 11 l l [

               <*                                                                                                           i o*

Attachment 2 Page 2 of 4 KEY ELEMENT 4.0 . ( OFFICE OF CONSTRUCTICN MAINTENANCE OF WELDER OR WELDING OPERATOR CUALIFI . -. . Based on audit of welder maintenance records, TVA welders deconstrated welding and within certification expiration dates as required by TVA programs procedures. KEY ELD!ENT 5.0 OFFICE OF CONSTRUCTION REhTAAL OF WELDER OR WELDING OPERATOR OUALIFICATIONS Based on audit of welder qualification records'and maintenance records , TVA welders were requalified in accordance .with TVA programs and procedures. In many cases TVA welders were given the original qualificatica test for renewal, which exceeded ASME IX and AWS Dl.1 requirements for renewal. p i KEY ELD!ENT 6.0 L OFFICE OF CCNSTRUCTION (' . q INITIAL WELDING INSPECTION PERSONNEL OUALIFICATION Qualification / Certification records for nondestructive examination personnel (weld inspection) were reviewed for compliance with TVA NDE personnel qualification March, 1983. procedures covering a time span from January, 1971 through . TVA personnel qualification procedures used.for the qualification / ! certification of NDE personnel complied with and referenced the applicable edition of SNT-TC-1A (American Society of Nondestructive-Testing). Records evidencing qualifications and certifications contained sufficient detail to confirm compliance with applicable codes, standards and specifications in effect during construction activities. 0031X

         .s.
       \U
  • Page 4 of 11
                                                                                                                                }
           .      3, '.

Attachment 2

(*._ . Page 3 cf 4 KEY ELEMENT 110. 1.0 ~ -

A - NUCLEAR OPERATIONS PREPARATION FOR AUDIT OF WELDIFIC ACTIVITIES . Prior to the start of the audit, the audit team developed an audit plan and identified applicable documents, specific manuals, specifications and

             .                procedure which described and implemented the TVA welding activities.

The audit team developed an audit checklist to' address akl elements - identified ~in the TVA work plan in addition to analysis of employee concerns for significance and integration into the checklist. The audit team identified and selected a cross section of welded. systems based on availability, eg: only systems which had been modified, repaired or replaced fell under Nuclear Operations program for audit. Welds were ~ randomly selected from drawings applicable to each individual system for programmatic audit.

                                                                        ~

KEY EIDIE!!T 2.0 NUCLEAR OPERATIONS ADEOUACY OF DESIGN OUTPUT DOCUMENTS _"'j For items selected for audit, drawings, welding procedures and supporting

  . s.                       records were reviewed and showed compliance with the TVA program and                          -

procedures. OBSERVATION

  • One observation was noted during the audit of the welding output documents.

The TVA detailed welding procedures (DHP) did not show the name of the key organizational group. By showing the narae of the key unit that is responsible for the welding control documents, any questions concerning the welding documents could have been readily resolved. .- KEY ELEMDIT NO. 3.0 NUCLEAR GPERATIONS INITIAL WELDER OR WELDING CPERATOR OUALIFICATICMS

                                                                                                                    -M Based on audit of welder qualification records and supporting documentation, , . .                .

TVA welders are qualified in accordance with TVA programs and procedures. 0031X , ( , . . \,, ~_ / 4

                                                                              ,                   Page 3 of 11 4

n -e- -

[ f- . , Attachment 2 k g Page 4 of 4 4. KEY ELD 4ENT FIO. 4.0 . f : .7 j _ p (. NUCLEAR OPERATIONS . I '. MAINTEMANCE OF WELDER OR WELDING OPERATOR OUALIFICATICUS [5

                                                                                                                                                                          .3 Based on audit of welder maintenance records, TVA welders der:onstrated welding
                      .and procedures. within certification expiration dates as required by TVA programs                                                                        -{

Itj ~w E KEY ELEMENT NO. 5. 0_ *

                                                                                                                                                                              ,A NUCLEAR OPERATIONS                                                                                U .)

RENEWAL OF WELDER OR WELDING OPERATOR OUALIFICATIONS

                                                                                                                                                                                    }

p j ,- Based on audit of welder qualif1 cation records and maintenance records. TVA welders are requalified in acco,rdance with TVA programs and procedures. ffj

                                                                                                                                                                                 <}

S.i KEY ELEMENT 6.0 lt;V C NUCLEAR OPERATIONS. kh INITIAL WELDING INSPECTION PERSONNEL OUALIFICATICMS M'- M f

'd.;;; -             All inspector qualification records (NDE. to include visual examination)--'                                                                                I audited indicated compliance with TVA programs and procedures and the referenced codes and standards.
                                                                                 ~                                                                                           l OBSERVATION' TVA Form 6780 (as referenced in procedure 0202.14) usedtodocumentNDb qualification and certification does not clearly identify the                                                                                             a recertification status of the individual. Additionally, certification                                                                                   D authority is referenced as being in compliance with TVA program requirements                                                                            T%

when individuals are actually certified in accordance with the specific 4 requirements of Procedure 0202.14 (formerly N75C01), Qualification Certification Program for NDE Personnel,  % f*#h y Program clarity and definition could be improved by adding either the Nj y certification expiration date or recertification status 'as an entry on For:n 6780. Specific reference to Procedure 0202.14 [$

    .              would provide for direct reference and complianceon                                             certification with            forms (6780)

TVA NDE personnel .

                                                                                                                                                                            'd[;

qualification, employed. certification requirements and practices for each NDE method " J"

                                                                                                                                                        ,..         .       j i.;_ '

0031X (. . . - (1_p^ ~

                                                                                                                                                                            %   ;d

[ . mt

                                                                                                                                                                                  ~W
                                                                                                                                                                                  'A
                             '                                                                             ,                           Page 4 of 11                               d