ML20214U750
| ML20214U750 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/05/1987 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20214U753 | List: |
| References | |
| NUDOCS 8706110322 | |
| Download: ML20214U750 (2) | |
See also: IR 05000423/1987008
Text
r
,
.*
JLN1 0 5 W
- o
!
t
Docket / License:
50-423/NPF-49
l
Northeast Nuclear Energy Company
ATTN:
Mr. Edward J. Mroczka
Senior Vice President, Nuclear
Engineering and Operations
P.O. Box 270
Hartford, Connecticut
06101-0270
Gentlemen:
Subject:
Millstone 3 Routine Inspection 50-423/87-08 (3/17/87-5/11/87)
This transmits the report of the above subject inspection by Messrs. J. T. Shediosky
and F. A. Casella of this office.
The inspection findings have been discussed with
Messrs. S. E. Scace and C. H. Clement of your staff.
No violations were identified during this inspection and no reply to this letter
is required. We note, however, that there were three reactor trips on steam gen-
erator low level and a safety injection actuation due to a faulty procedure revi-
sion.
These indicate a need for continued management attention to recurrent feed-
water problems and to procedure adequacy.
Thank you for your cooperation.
Sincerely,
4
oristui Slap 4 8V 8
Edward C. Wenzinger, Chief
Projects Branch No. 3
DivisionofReactorProjects
!
1
Enclosure:
NRC Region ! Inspection Report 50-423/87-08
l
cc w/ enc 1:
W. D. Romberg, Vice President, Nuclear Operations
S. E. Scace, Station Superintendent
j
E. R. Foster, Director, Generation Construction
R. M. Kacich, Manager, Generation Facilities Licensing
D. O. Nordquist, Manager, Quality Assurance
V. Papadopoli, Supervisor, Engineering Assurance
Pubile Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
'
B706110322 970605
PDH
ADOCK 05000423
0
PDH
I I
_ - _ _ - - _ _ _ - _ _ - - _ _ _ _ _ _
__ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _
__
_.
- -
,
,
Northeast Nuclear Energy Company
2
,
bec w/ enc 1:
-Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
DRP Section Chief
L. Prividy, RI, BV-2
T. Rebelowski, SRI. Millstone 1&2
B. Doolittle, LPM, NRR
R. Bores, DRSS
C. Anderson, DRS
RI:DRP
R *DRPW
Shedlosky/meo
e
'n inger
6/3/87
6 t/ TF7
(p $ Q
OFFICIAL RECORD COPY