Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-87-0079, Forwards Current Certificate of Coverage by Nuclear Mutual Ltd & Corrected Ani/Maelu & Nuclear Electric Insurance Ltd Certificate + (ML20214J574)
- ML20214J576 + (ML20214J576)
- ML20214J577 + (ML20214J577)
- ML20214J580 + (ML20214J580)
- TXX-6465, Advises of Delays in Field Verification Activities for Identification of Raceway Sleeves,Per Util 870506 Response to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Verification Will Be Completed by 870626 + (ML20214J584)
- IR 015000015/1986001 + (ML20214J586)
- ML20214J587 + (ML20214J587)
- ML20214J588 + (ML20214J588)
- ST-HL-AE-1812, Informs of Util Actions in Response to Complaint by Former QC Inspector for Ebasco Re Employee Termination Following Positive Test for Illegal Drugs.Util Investigation Will Be Conducted Shortly.Related Correspondence + (ML20214J589)
- ML20214J593 + (ML20214J593)
- ML20214J595 + (ML20214J595)
- ML20214J596 + (ML20214J596)
- ML20214J597 + (ML20214J597)
- ML20214J598 + (ML20214J598)
- ST-HL-AE-1819, Forwards Revs to Emergency Planning Procedures.W/O Encl. Related Correspondence + (ML20214J599)
- ML20214J600 + (ML20214J600)
- ML20214J603 + (ML20214J603)
- ML20214J605 + (ML20214J605)
- ML20214J606 + (ML20214J606)
- ML20214J607 + (ML20214J607)
- ML20214J609 + (ML20214J609)
- ML20214J611 + (ML20214J611)
- ML20214J614 + (ML20214J614)
- ML20214J620 + (ML20214J620)
- ML20214J622 + (ML20214J622)
- ML20214J624 + (ML20214J624)
- ML20214J626 + (ML20214J626)
- ML20214J628 + (ML20214J628)
- IR 05000285/1986008 + (ML20214J630)
- ML20214J632 + (ML20214J632)
- ML20214J637 + (ML20214J637)
- ML20214J638 + (ML20214J638)
- ML20214J639 + (ML20214J639)
- IR 05000313/1986013 + (ML20214J640)
- B12293, Forwards Reviews for Isap Topics 1.06, Wind & Tornado Loadings/Tornado Missiles & 1.31, Pipe Break Outside Containment, Per 850517 Commitment + (ML20214J644)
- 05000316/LER-1986-021, :on 860707,during Troubleshooting of source- Range Nuclear Instrument N-32,spike on ESF Signal Occurred. Procedures Revised to Permit Bypassing Reactor Trip Function During Troubleshooting + (ML20214J646)
- ST-HL-AE-2188, Interim Deficiency Rept Re Leaking Main Steam Power Operated Relief Valve Switches.Initially Reported on 870323.Affected Unit 1 Switches Replaced W/Corresponding Unit 2 PORV Components.Next Rept Will Be Submitted by 870603 + (ML20214J648)
- GO2-86-697, Informs That Commitment to Upgrade 1 H Cable Tray Fire Barrier Installation for Safe Shutdown Equipment Cables to 3 H Fire Barrier Capability by Jul 1986 Delayed Until 860825 + (ML20214J649)
- ML20214J649 + (ML20214J649)
- ML20214J650 + (ML20214J650)
- ML20214J651 + (ML20214J651)
- ML20214J652 + (ML20214J652)
- ML20214J653 + (ML20214J653)
- ML20214J654 + (ML20214J654)
- ML20214J655 + (ML20214J655)
- 0CAN068609, Responds to NRC Re Violations Noted in Insp Repts 50-313/86-13 & 50-368/86-13.Corrective Actions:Procedure 2402.35 Will Be Revised to Maximize Efficiency During Performance of Work on HPSI Pumps by Sept 1986 + (ML20214J656)
- ML20214J658 + (ML20214J658)
- ML20214J661 + (ML20214J661)
- ST-HL-AE-1805, Advises That Review of Westinghouse Stress 1 Repts Should Be Finalized by Early 1987.Meeting at Westinghouse Ofc in Pittsburgh,Pa Recommended for First Wk in Mar 1987.Related Correspondence + (ML20214J664)
- ML20214J665 + (ML20214J665)
- ML20214J666 + (ML20214J666)