Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-V-87-086, on 870510,reactor Shutdown Due to Inoperable Channel C 120-volt Ac Vital Inverter.Outage Tasks Will Include Surveillance Tests,Insp & Repair of Leaking Low Pressure Feedwater Heater & Equipment Problem Repairs + (ML20214E225)
- ML20214E228 + (ML20214E228)
- ML20214E230 + (ML20214E230)
- ML20214E231 + (ML20214E231)
- ML20214E235 + (ML20214E235)
- ML20214E236 + (ML20214E236)
- ML20214E237 + (ML20214E237)
- ML20214E238 + (ML20214E238)
- ML20214E241 + (ML20214E241)
- ML20214E242 + (ML20214E242)
- ML20214E243 + (ML20214E243)
- ML20214E245 + (ML20214E245)
- ML20214E246 + (ML20214E246)
- ML20214E250 + (ML20214E250)
- ML20214E251 + (ML20214E251)
- ML20214E254 + (ML20214E254)
- IR 05000373/1986003 + (ML20214E256)
- 05000414/LER-1987-016-01, :on 870413,facility Shutdown Due to Unidentified Reactor Coolant Leakage Greater than 1.0 Gallon Per Minute.Caused by Nozzle & Disc of Valve 2NM434 Badly Pitted.Valve Repaired + (ML20214E258)
- ML20214E259 + (ML20214E259)
- ML20214E260 + (ML20214E260)
- ML20214E261 + (ML20214E261)
- 05000254/LER-1986-022-02, :on 860501,containment Atmosphere Monitoring Lines Exceeded Code Stress Requirements of NUREG-0661 for Mark I Containment Design.Caused by Inadequate Drawing Design Control for Listed Mods.Lines Modified + (ML20214E262)
- ML20214E263 + (ML20214E263)
- ML20214E264 + (ML20214E264)
- ML20214E265 + (ML20214E265)
- ML20214E266 + (ML20214E266)
- ML20214E267 + (ML20214E267)
- L-87-026, Rev 0 to Calculation Package ERS-ATL-87-026, Beaver Valley Power Station Units 1 & 2 Offsite Dose Calculation Manual T Factor Justification + (ML20214E268)
- ML20214E270 + (ML20214E270)
- ML20214E271 + (ML20214E271)
- BECO-85-024, Application for Amend to License DPR-35,consisting of Proposed Change 86-06,revising Tech Specs Re Reactor Pressure Vessel Neutron Fluence Projection.Fee Paid + (ML20214E274)
- ML20214E277 + (ML20214E277)
- IA-86-774, Partially Withheld Record of 860516 Telcon Re FBI Investigation of Facility Power Lines.Partially Withheld Record of 860519 Telcon Also Encl + (ML20214E278)
- ML20214E278 + (ML20214E278)
- ML20214E281 + (ML20214E281)
- ML20214E283 + (ML20214E283)
- IA-87-221, Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR + (ML20214E284)
- ML20214E284 + (ML20214E284)
- ML20214E285 + (ML20214E285)
- IR 05000456/1986001 + (ML20214E286)
- ML20214E287 + (ML20214E287)
- IR 05000254/1986004 + (ML20214E291)
- BECO-86-179, Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Required Actions Will Be Implemented Per IE Bulletin 86-001 + (ML20214E293)
- ML20214E299 + (ML20214E299)
- ML20214E302 + (ML20214E302)
- ML20214E303 + (ML20214E303)
- ML20214E305 + (ML20214E305)
- ML20214E308 + (ML20214E308)
- ML20214E310 + (ML20214E310)
- ML20214E311 + (ML20214E311)
- ML20214E312 + (ML20214E312)