Dnv6-M 2 51986 MEMORANDUM FOR:
Region III Files (Braidwood 1 and 2)
FROM:
P. R. Pelke, Project Inspector, Braidwood
SUBJECT:
SARGENT & LUNDY CALCULATIONS FOR BYRON AND BRAIDWOOD (50-456; 50-457) (AMS NO. RIII-86-A-0002)
On February 21, 1986, the Allegation Review Board met to discuss the subject allegation.
The outline of the meeting is enclosed.
P. R. Pelke Project Inspector
Enclosure:
Outline for Allegation Review Board cc w/ enclosure:
A. Davis C. Norelius C. Paperiello E. Greenman W. Little J. Harrison D. Danielson R. Gardner J. Muffett J. Gavula C. Weil W. Kropp J. Stevens, NRR H. Farber f) 0603070234 060225 b
PDR ADOCK 05000454 PeIke/jp P
PDR d2k i.t
(
IE ol
\\
4 a*
4 OUTLINE FOR ALLEGATION REVIEW BOARD (AMS NO. RIII-86-A-0002)
References:
(1) Memorandum from Charles H. Weil to Carl J. Paperiello dated January 8, 1986 (2) Two letters from the alleger received on January 6, 1986 Note: This allegation was previously reviewed during a Byron Allegation Review Board on February 10, 1986.
Recommended Inspector: Muffett (Gavula)
Background:
Region III received two unsigned letters (one envelope was marked "From:
Bergen Patterson") containing the following allegations:
1.
S&L applied the wrong concept in evaluating the Piping Clearance Report (PCR) for the Byron and Braidwood Stations.
2.
S&L did lots of wrong concept hand calculations for anchor load (as built) to evaluate the pipe stress.
RECOMMENDED ACTIONS Item 1:
Review the PCR evaluation conducted by S&L.
Item 2:
Review pipe stress evaluations conducted by S&L for Braidwood/ Byron.
Inspection to be conducted at S&L on February 25 and 26, 1986 l