ML20214E271

From kanterella
Jump to navigation Jump to search
Forwards SALP Board Repts 50-456/86-01 & 50-457/86-01 for Jul 1984 - Nov 1985.Ratings Improved to Category 2 in Areas of Quality Program & Administrative Controls,Piping Sys & Supports & safety-related Components
ML20214E271
Person / Time
Site: Braidwood  
Issue date: 02/28/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20214E272 List:
References
NUDOCS 8603070237
Download: ML20214E271 (3)


See also: IR 05000456/1986001

Text

N

Dm e>

-

,

,.

FEB 2 81986

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767.

Chicago, IL 60690

Gentlemen:

Enclosed for your review, prior to our scheduled meeting on March 14, 1966,

is the SALP 5 Board Report for the Braidwood Station, Units 1 and 2, covering

the period July 1, 1984 through November 30, 1985.

In accordance with NRC policy, I have reviewed the SALP Board assessment and

concur with their ratings.

Your overall regulatory performance at Braidwood was

considered to be acceptable during this assessment period.

Sixteen functional

areas were evaluated.

You were rated Category 1 in one area, Category 2 in

eleven areas, Category 3 in one area, and three areas were not rated.

Your

performance showed an improved trend in six areas and your rating improved from

Category 3 to Category 2 in three of these areas:

Quality Programs and

Administrative Controls Affecting Quality, Piping Systems and Supports, and

Safety-Related Components.

No declining performance trends were identified.

Housekeeping and Equipment Protection was rated Category 3, based upon Unit 1

being in the preoperational test phase where an improved level of cleanliness is

expected.

This area was not rated in the previous assessment period.

In meetings and in correspondence with you following our inspections in 1982 and

1983 we had stated that we had serious questions about the quality of work at

Braidwood and had expressed concern about the need for more aggressive CECO

management involvement in and support of the CECO QA program.

In the letter

accompanying the SALP 4 Board Report we had noted that during the last part of

that SALP period your overall regulatory performance was showing an improved

trend.

The current SALP 5 report indicates that this trend continued resulting

in improved performance particularly in the three important areas in which you

had been rated Category 3.

The results of your efforts to date and the

continuation of this level of effort will provide adequate assurance that

construction deficiencies of the past have been corrected and that ongoing work

is being properly carried out.

kk

6

K

G

$\\

k

t

L

.

- -

.

-

.

.

g

-

.

...

-

'.

..

FEB 2 A toss

Commonwealth Edison Company

2

While you will have sufficient opportunity to present your comments at the

meeting on March 14, 1986, we also solicit written comments within 30 days

after the meeting to enable us to thoroughly evaluate your comments and

provide you with,our conclusions relative to them.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the SALP

Report will be placed in the NRC's Public Document Room.

No reply to this letter is required at this time; however, should you have any

questions concerning the SALP Report, we would be pleased to discuss them with

you.

Sincerely,

Orfofnot sfsnod by

A. Bert Davis

James G. Keppler

Region.sl Administrator

Enclosure:

SALP 5 Board Reports

No. 50-456/86001;

No. 50-457/86001

See Attached Distribution

'

/

RIIIyph'

(

RIII

II

R II

hlo

Pge/ bis EarAer

Gar ner

Lit,tJe

Schw91tinz

s\\

ff

9/11 f>b

gugs

jpp

'

i

R I

RIU g

nd

is h eifpl(r

yb1N } O

' I

j

n

.

. . .

-

a

Commonwea'lth Edison Company

3:

FEB 2 81986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

'

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

1

Superintendent

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

'

Resident Inspector, RIII

Braidwood

.

Resident Inspector, RIII Byron

!

Phyllis Dunton, Attorney

}

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

1

Division (S&L)

'

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

'

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Henorable Richard F. Cole, ASLB

J. M. Taylor, Director, IE

H. R. Denton, Director, NRR

Regional Administrators

RI, RII, RIV, RV

N. J. Palladino, Chairman

.

J. K. Asselstine, Commissioner

"

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner

L. W. Zech, Commissioner

NRR Project Manager

H. L. Thompson, NRR

J. Axelrad, IE

RIII PRR

]

RIII SGA

State Liaison Officer, State of

Illinois

INPO

!

. , . _ _ . , , _ _

, -

. . _ . .

. ..,_._

. _ _

. - _ _ - .

_ , . _ . , - - , - , . . _

. . . _ ,