Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212B817 + (ML20212B817)
- PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph + (ML20212B818)
- U-600662, Provides Justification for Deleting Berm Height Requirement to Divert Flood Water Runoff from Entering Excavation,Per FSAR Section 2.5.4.14.4 & Sser 2 (NUREG-0853).As-built Berm Satisfactory & Will Be Included in Next FSAR Rev + (ML20212B819)
- ML20212B820 + (ML20212B820)
- PNO-II-99-037H, on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph + (ML20212B821)
- IR 05000341/1986021 + (ML20212B822)
- SVP-97-237, Informs That New Due Date of 971202 Has Been Assigned to Completion of Revised App R Conformance Safe Shutdown Rept, Originally Committed to Complete by 970928.Extension Is Due to Significant Effort Required to Complete App R Project + (ML20212B823)
- ML20212B827 + (ML20212B827)
- ML20212B828 + (ML20212B828)
- ML20212B832 + (ML20212B832)
- ML20212B833 + (ML20212B833)
- ML20212B835 + (ML20212B835)
- NPL-97-0596, Informs That Reference Paragraph Submitted in 950127 Relief Request RR-2-20,is Incorrect.Correct Reference to Code of Federal Regulations for Relief Request RR-2-20 Is 10CFR50.55a(g)(6)(ii)(A)(5) + (ML20212B837)
- B12130, Forwards Listed Summaries to Isap Topics,Including Isap 1.04, Seismic Qualification of Safety-Related Piping, in Response to 850731 Request.Public Safety Impact Scores Preliminary Since Analysis of Isap Not Completed + (ML20212B838)
- ML20212B840 + (ML20212B840)
- ML20212B842 + (ML20212B842)
- RBG-24090, Ro:On 860624,Div III Diesel Generator Failed During Surveillance Testing.Caused by Timing Error.No Corrective Actions Noted + (ML20212B843)
- ML20212B845 + (ML20212B845)
- ML20212B846 + (ML20212B846)
- ML20212B848 + (ML20212B848)
- ML20212B849 + (ML20212B849)
- ML20212B852 + (ML20212B852)
- ML20212B854 + (ML20212B854)
- ML20212B855 + (ML20212B855)
- ML20212B856 + (ML20212B856)
- ML20212B857 + (ML20212B857)
- ML20212B858 + (ML20212B858)
- ST-HL-AE-1938, Forwards Annotated Revs to FSAR Pages 9.1-6,9.1-7,9.1-8 & 9.1-31,deleting Refs to Location of Skimmer Strainer Assembly in Fuel Transfer Canal.Changes Will Be Incorporated in FSAR Amend 58 + (ML20212B863)
- ML20212B864 + (ML20212B864)
- ML20212B865 + (ML20212B865)
- ML20212B866 + (ML20212B866)
- ML20212B867 + (ML20212B867)
- ML20212B869 + (ML20212B869)
- 05000413/LER-1999-009-01, Forwards LER 99-009-01,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits. Commitments Are Contained in Planned Corrective Actions Section of Attached Rept + (ML20212B870)
- PNO-III-86-075, on 860731,village of Seneca,Il Filed Suit Against NRC to Prevent Resumption of Facility Operation.Suit Cites Alleged Shortcomings in Emergency Planning Activities & Troubled Performance Record + (ML20212B871)
- ML20212B874 + (ML20212B874)
- ML20212B876 + (ML20212B876)
- ML20212B877 + (ML20212B877)
- ML20212B878 + (ML20212B878)
- ML20212B879 + (ML20212B879)
- NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With + (ML20212B880)
- ML20212B881 + (ML20212B881)
- IR 05000327/1986059 + (ML20212B883)
- ML20212B884 + (ML20212B884)
- ML20212B885 + (ML20212B885)
- ML20212B889 + (ML20212B889)
- ML20212B890 + (ML20212B890)
- ML20212B892 + (ML20212B892)
- IR 05000395/1997005 + (ML20212B893)
- ML20212B894 + (ML20212B894)
- ML20212B896 + (ML20212B896)