Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210U658 + (ML20210U658)
- JAFP-86-0437, Forwards Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. No Valves Identified W/Design Differential Pressures Lower than Anticipated + (ML20210U659)
- 05000245/LER-1997-034-01, :on 970812,Unit 1 Switchgear Failed During Unit 2 High Energy Line Break.Caused by Incorrect Assumption by HELB Analysis Performed by A&E.No Immediate Corrective Actions Required + (ML20210U660)
- PNO-I-87-010, on 870211,reactor Scrammed from Full Power During Transient Initiated by Loss of Instrument Bus.Safety Injection Signal Received on High Steam Flow Coincident W/Low Steam Line Pressure.Plant Stabilized in Hot Shutdown + (ML20210U661)
- ML20210U663 + (ML20210U663)
- ML20210U665 + (ML20210U665)
- 05000312/LER-1987-002, :on 870108,determined That One Area in Existing Plant Electrical Distribution Sys in Noncompliance W/ 10CFR50,App R.Caused by Original Design Error.Instructions Written & Corrective Design Mods Initiated + (ML20210U666)
- ML20210U667 + (ML20210U667)
- ML20210U669 + (ML20210U669)
- ML20210U670 + (ML20210U670)
- ML20210U671 + (ML20210U671)
- ML20210U673 + (ML20210U673)
- ML20210U674 + (ML20210U674)
- ML20210U675 + (ML20210U675)
- ML20210U677 + (ML20210U677)
- ML20210U679 + (ML20210U679)
- ML20210U680 + (ML20210U680)
- B12417, Advises That All Correspondence to Utils Should Be Addressed to Ej Mroczka to Assure That All Appropriate Personnel Receive NRC Correspondence & That All Necessary Actions Properly & Promptly Taken + (ML20210U683)
- ML20210U684 + (ML20210U684)
- ML20210U686 + (ML20210U686)
- ML20210U687 + (ML20210U687)
- ML20210U690 + (ML20210U690)
- ML20210U691 + (ML20210U691)
- ML20210U692 + (ML20210U692)
- ML20210U693 + (ML20210U693)
- ML20210U695 + (ML20210U695)
- IR 05000250/1987005 + (ML20210U696)
- ML20210U697 + (ML20210U697)
- ML20210U698 + (ML20210U698)
- ML20210U699 + (ML20210U699)
- ML20210U700 + (ML20210U700)
- ML20210U702 + (ML20210U702)
- ML20210U703 + (ML20210U703)
- ML20210U704 + (ML20210U704)
- ML20210U705 + (ML20210U705)
- ML20210U706 + (ML20210U706)
- ML20210U707 + (ML20210U707)
- ML20210U708 + (ML20210U708)
- ML20210U709 + (ML20210U709)
- ML20210U710 + (ML20210U710)
- 05000312/LER-1987-009, :on 870116 Inoperable Radiation Monitors for Reactor Coolant Leakage Detection Sys,Since Initial Startup in 1974 Discovered.Caused by Procedural Deficiency.Present Radiation Monitors R-15001A - E Being Replaced + (ML20210U711)
- ML20210U712 + (ML20210U712)
- ML20210U713 + (ML20210U713)
- ML20210U714 + (ML20210U714)
- ML20210U716 + (ML20210U716)
- 05000293/LER-1999-007-02, :on 990716,discovered That Bus B6 Voltage Restoration Was Not Consistent with Safety Analysis Assumptions.Caused by Personnel Error During Development of Design Change.Will Evaluate Need for Mod.With + (ML20210U717)
- 05000412/LER-1999-006-01, :on 990716,loss of Plant 4kV Train B Emergency Bus Occurred.Caused by Detected Ground Overcurrent Condition.Three Associated Control Relays in EDG 2-2 Voltage Regulator Were Replaced.With + (ML20210U719)
- ML20210U720 + (ML20210U720)
- ML20210U724 + (ML20210U724)
- ML20210U725 + (ML20210U725)
- ML20210U726 + (ML20210U726)