Informs That 860414 & 23 Commitments to Provide Addl Info Re Fire Protection Measures,Including Emergency Lighting by 860601 Will Be Delayed Until 860701 Per 860508 Discussions W/Nrc
ML20210U725
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/30/1986
From: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8606030061
Download: ML20210U725 (2)


Text

n.- -

b._

.e.

l l

@ Consumers N ka Kenneth W Berrry N o lic: ruing maaraanmaars pusesPHC General G6mes-1945 W,si PernsK Roed, JacLecn, l#. G201 = (317) '/48-t 636 May 30, 1986

Director, Nuclear Reactor Regulation US Nuclear Regulatory Cc:cmission Washington, DC 20555 EOCKET 50-155 - LICENSE DFR-6

' BIG ROCK POINT PLANT -

FIRE PROTECTION - DELAY IN SUBMITTAL OF. ADDITIONAL IN' FORMATION Consuuers Fower Company letters dated April 23, 1986 and April 14, 1986, ccanitted Consumers Power Coupany to submit to the NRC additional information concernin.g certain fire protection steasures at our Big Rock Foint Plant by June 1, 1986. Speci.fically, these commitusnts are the following:

1.

Submit an exemption request for emergency lighting in the Flant yard area.

2.

Submit an exemption request for the lack of fixed suppression in the Scre<enhouse, 3.

Submit additional clarifying information regarding spurious actuation due to a fire in the Control Room.

4:

Submit.a description of the appropriate corrective action which results from a recalculation of the Recirculation Pump Room oil fire or, if no corrective action is necessary, submit the recalculation.

As a result of discussions with NRC representatives during the May 8,1986 meeting at the Big Rock Point Plant site, the submittals identified above are being supplemented to ensure that all concerns are addressed. Accordingly, 8606030061 860530 PDR ADOCK 05000155 p

PDR P l3D DC0586-0093-NLO4 i

^o Director, Nuclear Reactor Regualtion 2

Big Rock Point Plant Fire Protection - Additional Information Delay-May 30,.1986 submittal of this additional information is delayed until July 1, 1986. This

' delay was discussed and agreed with by members-of your staff during telephone conversations subsequent to the May 8, 1986 meeting.-

Kennet W Berry Director, Nuclear Licensing lCC Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point OC0586-0093-NLO4

- -