Forwards Safety Insp Repts 50-295/86-25 & 50-304/86-25 on 861117-870130 & Notice of Violation
ML20210U675
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/11/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20210U681 List:
References
NUDOCS 8702180545
Download: ML20210U675 (2)


See also: IR 05000295/1986025

Text

.-

g O

FE8111987

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety ins)ection conducted by Messrs. C. F. Gill,

W. B. Grant, and W. J. Slawinski of t1is office during the period November 17,

1986 through January 30, 1987, of activities at Zion Nuclear Power Station

authorized by NRC Operating Licenses No. DPR-39 and No. DPR-48 and to the

discussions of our findings with Mr. G. Pliml and others of your staff on

December 12, 1986, and on January 9 and 30,1987.

The enclosed copy of our inspection re) ort identifies areas examined during

the inspection. Within these areas, t1e inspection consisted of a selective

examination of procedures and representative records, observations, independent

measurements, and interviews with personnel.

During this inspection, certain cf your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice. The inspection

showed that action is currently being taken to correct the identified

violations and to prevent recurrence. Cur understanding of your corrective

actions are described in Sections 20 and 25 of the enclosed inspection report.

Consequently, no reply to the violation is required and we have no further

questiens regarding these matters at this time. If our description of your

, co.rective actio7s is incorrect please notify us in writing within 30 days

of the date of this letter.

In accordance with 10 CFR 2.790 of the Commission's regulations, a co)y of

this letter and the enclosed inspection report will be placed in the iRC

Public Document koom.

g2 $ $ [5 $ 5

e )

. _. .

.

Commonwealth Edison Company 2

FE8111987.

-We will gladly discuss any questions you have concerning this. inspection.

Since.~ely,

W. D. Sha er, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosures: .

1. Notice of Violation

2. Inspection Reports

No. 50-295/86025 DRSS ; and

No. 50-304/86025 DRSS

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

G. J. Plim1, Station Manager

JanNorris,ProjectManager,NRR

DCS/RSB(RIDS) .