- ML20210R289 + (ML20210R289)
- 05000336/LER-1997-026, Forwards LER 97-026-00,documenting Event That Occurred at Facility on 970729.Commitments Made within Ltr,Listed + (ML20210R292)
- ML20210R294 + (ML20210R294)
- ML20210R295 + (ML20210R295)
- 05000336/LER-1997-026-02, :on 970729,invalid ESAS Actuation Occurred While Shifting from Normal to Reserve Station Transformers. Caused by Inadequate Review of Components.Briefed Operations Personnel Re Need to Analyze Equipment + (ML20210R302)
- ML20210R304 + (ML20210R304)
- ML20210R305 + (ML20210R305)
- W3P87-0535, Monthly Operating Rept for Jan 1987 + (ML20210R306)
- ML20210R308 + (ML20210R308)
- ML20210R311 + (ML20210R311)
- ML20210R312 + (ML20210R312)
- ML20210R313 + (ML20210R313)
- W3P86-3328, Boric Acid Concentration Reduction Effort,Technical Bases & Operational Analysis,Waterford Nuclear Power Plant Unit 3 + (ML20210R320)
- ML20210R321 + (ML20210R321)
- IR 05000298/1997014 + (ML20210R324)
- ML20210R326 + (ML20210R326)
- ML20210R328 + (ML20210R328)
- 05000324/LER-1999-007, :on 990714,noted That Overlapping of Safety Systems Outages Resulted in TS Prohibited Operation.Caused by Inadequate Training/Communications Re Implementation of Its.Training Will Be Provided to Operators.With + (ML20210R331)
- U-600819, Responds to NRC Re Violations Noted in Insp Rept 50-461/86-74.Corrective Actions:Administrative Procedure CPS 1014.03 Revised to Clarify Requirements for Periodic Reviews of Temporary Mods + (ML20210R333)
- ML20210R335 + (ML20210R335)
- IR 05000254/1987002 + (ML20210R337)
- ML20210R338 + (ML20210R338)
- ML20210R339 + (ML20210R339)
- ML20210R340 + (ML20210R340)
- ML20210R343 + (ML20210R343)
- ML20210R346 + (ML20210R346)
- ML20210R348 + (ML20210R348)
- ML20210R350 + (ML20210R350)
- PY-CEI-NRR-0581, Forwards marked-up Tech Spec Page 3/4 6-41,placing Upper Bound on Opening Setpoint of Containment Vacuum Breaker Isolation Valve Per NRC Request + (ML20210R352)
- ML20210R357 + (ML20210R357)
- ML20210R358 + (ML20210R358)
- ML20210R360 + (ML20210R360)
- ML20210R362 + (ML20210R362)
- ML20210R363 + (ML20210R363)
- ML20210R366 + (ML20210R366)
- ML20210R367 + (ML20210R367)
- IR 05000482/1999015 + (ML20210R369)
- ML20210R370 + (ML20210R370)
- ML20210R371 + (ML20210R371)
- ML20210R372 + (ML20210R372)
- ML20210R373 + (ML20210R373)
- ML20210R374 + (ML20210R374)
- JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with + (ML20210R376)
- ML20210R377 + (ML20210R377)
- ML20210R378 + (ML20210R378)
- ML20210R379 + (ML20210R379)
- ML20210R382 + (ML20210R382)
- ML20210R385 + (ML20210R385)
- ML20210R388 + (ML20210R388)
- ML20210R391 + (ML20210R391)
- ML20210R393 + (ML20210R393)