Confirmatory Action Ltr 86-12,confirming 860923 Telcon Re Dispatch of Insp Team to Assess Anomalies Concerning Recent Loss of Offsite Power Tests.Actions to Be Taken Listed
ML20210R362
Person / Time
Site: Hope Creek 
Issue date: 09/24/1986
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
Public Service Enterprise Group
References
CAL-86-12, NUDOCS 8610070281
Download: ML20210R362 (2)


Text

'

(

4 9

2 4 SEP 886 CAL No. 86-12 Docket No. 50-354 Public Service Electric & Gas Company ATTN:

Mr. C. A. McNeill, Jr.

Vice Presid?nt - Nuclear Post Office Box 236 Hancocks Bridge, New Jersey 08038 Gentlemen:

Subject:

Confirmation of Actions to be Taken with Regard to the Hope Creek Loss of Offsite Power Testing Pursuant to your telephone conversation on September 23, 1986 with members of my staff, this is to confirm that we are dispatching an Augmented Inspection Team (AIT) to assess the anomalies related to the recent loss of offsite power (LOP) tests at Hope Creek.

It is our understanding that you will take the following actions:

1.

Defer any additional LOP integrated testing until the NRC AIT team leader determines that such testing can continue.

2.

Provide any LOP test procedures to the NRC AIT for their review prior to implementation.

3.

Make available to the NRC AIT relevant written material related to deficiencies identified during the LOP tests conducted September 11 and 19, 1986, including:

a. preopera+1onal test results
b. surveillance test results
c. component installation and functional test records 4.

Provide a written report to the Regional Administrator prior to restart that includes your analysis of the LOP testing conducted on September 11 and 19, 1986.

The analysis should include (a) a discus-sion of why the preoperational test program and subsequent testing did not identify the deficiencies that resulted during the LOP testing, i

(b) consideration of contributing factors such as design control, l

quality assurance and training, (c) the broader implications of your findings on other plant systems and (d) corrective actions which you plan to take including any additional preoperational testing.

l l

OFFICIAL RECORD COPY 2 SUMMERS 9/23/86 - 0001.0.0 1

09/24/86 (0i 8610070281 860924 PDR ADOCK 05000354 O

P PDR 1

Public Service Electric 2

and Gas Company 2 4 SEF 1986 Further we understand that restart will not occur until you receive my authorization.

If your understanding of the actions to be taken are different than those described above, please contact this office within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the receipt of this letter.

Thank you for your cooperation.

Sincerely, origTnal signed by NoSasN.Yu"rTey Regional Administrator cc w/ encl:

P. R. H. Landrieu, Vice President - Engineering (Newark)

R. S. Salvesen, General Manager, Hope Creek Operations A. E. Giardino, Manager, Station Quality Assurance R. L. Mitti, General Manager, Nuclear Assurance and Regulation W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic Electric Company L. A. Reiter, General Manager - Licensing and Reliability Rebecca A. Green, Bureau cc' Radiation Protection Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New Jersey bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief Robert J. Bores, DRSS E. Adensam, NRR R. Bernero, NRR H. Denton, NRR J. Taylor, IE J. Partlow, IE E. Jordan, IE

/V Ga%

RI RI:DRS Fi RA Ri;:RA P

RP ers/rbl N

holm llo P

A an Murley e serc4 e

9/h/86 9/t 86 9/N86 9/ /86 9/1t/86 9/d86 9/

86 0FFICIAL RECORD COPY 2 SUMMERS 9/23/86 - 0001.0.1 09/24/86