Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210R209 + (ML20210R209)
- ML20210R211 + (ML20210R211)
- ML20210R213 + (ML20210R213)
- ML20210R214 + (ML20210R214)
- ML20210R217 + (ML20210R217)
- ML20210R221 + (ML20210R221)
- ML20210R222 + (ML20210R222)
- ML20210R225 + (ML20210R225)
- IR 05000312/1986030 + (ML20210R227)
- ML20210R229 + (ML20210R229)
- ML20210R230 + (ML20210R230)
- ML20210R231 + (ML20210R231)
- JAFP-97-0303, Forwards Ja FitzPatrick Nuclear Power Plant Effluent & Waste Disposal Semi-Annual Rept,Jan-June 1997. Rept Submitted in Accordance W/Requirements of Amend 93,App B, Section 7.3.C of Ja FitzPatrick Nuclear Power Plant TS + (ML20210R233)
- ML20210R234 + (ML20210R234)
- B12199, Forwards Reviews of Isap Topics 2.09,2.11 & 2.12 Re Reactor Coolant Pump Vibration Monitoring Sys Upgrade, Main Steam Sys Evaluation & Turbine Generator Trip Logic, Respectively,Per 850731 Request + (ML20210R236)
- ML20210R241 + (ML20210R241)
- ML20210R242 + (ML20210R242)
- IR 05000445/1999010 + (ML20210R247)
- ML20210R250 + (ML20210R250)
- ML20210R256 + (ML20210R256)
- ML20210R257 + (ML20210R257)
- ML20210R258 + (ML20210R258)
- ML20210R259 + (ML20210R259)
- PY-CEI-NRR-2204, Forwards fitness-for-duty Program Performance Rept for Period Jan-June 1997 + (ML20210R263)
- ML20210R264 + (ML20210R264)
- ML20210R266 + (ML20210R266)
- ML20210R267 + (ML20210R267)
- ML20210R268 + (ML20210R268)
- ML20210R269 + (ML20210R269)
- ML20210R270 + (ML20210R270)
- ML20210R272 + (ML20210R272)
- JAFP-87-0131, Monthly Operating Rept for Jan 1987 + (ML20210R273)
- 05000483/LER-1997-007, :on 970725,main Steam Safety Valve Setpoint Drift Was Outside Design Basis Requirements.Caused by Setpoint Drift or Variance.Valves Were Either Tested Satisfactorily,Reset or Reworked + (ML20210R274)
- ML20210R275 + (ML20210R275)
- ML20210R276 + (ML20210R276)
- ML20210R277 + (ML20210R277)
- ML20210R278 + (ML20210R278)
- IR 05000275/1987003 + (ML20210R280)
- ML20210R281 + (ML20210R281)
- ML20210R284 + (ML20210R284)
- ML20210R285 + (ML20210R285)
- ML20210R286 + (ML20210R286)
- ML20210R289 + (ML20210R289)
- 05000336/LER-1997-026, Forwards LER 97-026-00,documenting Event That Occurred at Facility on 970729.Commitments Made within Ltr,Listed + (ML20210R292)
- ML20210R294 + (ML20210R294)
- ML20210R295 + (ML20210R295)
- 05000336/LER-1997-026-02, :on 970729,invalid ESAS Actuation Occurred While Shifting from Normal to Reserve Station Transformers. Caused by Inadequate Review of Components.Briefed Operations Personnel Re Need to Analyze Equipment + (ML20210R302)
- ML20210R304 + (ML20210R304)
- ML20210R305 + (ML20210R305)
- W3P87-0535, Monthly Operating Rept for Jan 1987 + (ML20210R306)
- ML20210R308 + (ML20210R308)