Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209J108 + (ML20209J108)
- ML20209J109 + (ML20209J109)
- PNO-III-86-093, on 860904-06,patient Undergoing Brachytherapy Treatment w/Cs-137 Gynecological Implant Received Therapeutic Radiation Exposure of 8,015 Rads Rather than 6,255 Rads.Caused by Error in Loading Cs-137 Sources + (ML20209J110)
- ML20209J112 + (ML20209J112)
- ML20209J113 + (ML20209J113)
- ML20209J114 + (ML20209J114)
- ML20209J115 + (ML20209J115)
- ML20209J116 + (ML20209J116)
- ML20209J118 + (ML20209J118)
- 05000295/LER-1986-026, :on 860519,during Mod Overview Insp,Raychem Heat Shrink Style Environmentally Qualified Splices Found Incorrectly Installed.Caused by Inadequate Instructions from Mfg.Training Initiated + (ML20209J119)
- ML20209J122 + (ML20209J122)
- ML20209J123 + (ML20209J123)
- ML20209J125 + (ML20209J125)
- ML20209J128 + (ML20209J128)
- TXX-6408, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms.Initially Reported on 851220.Engineering,const & Quality Personnel Discussed Corrective Action.Comprehensive Plan Will Be Submitted.Next Rept by 870619 + (ML20209J130)
- IR 05000483/1986002 + (ML20209J131)
- ML20209J135 + (ML20209J135)
- ML20209J136 + (ML20209J136)
- ML20209J137 + (ML20209J137)
- ML20209J138 + (ML20209J138)
- ML20209J140 + (ML20209J140)
- ML20209J142 + (ML20209J142)
- ML20209J143 + (ML20209J143)
- ML20209J144 + (ML20209J144)
- ML20209J146 + (ML20209J146)
- ML20209J147 + (ML20209J147)
- ML20209J148 + (ML20209J148)
- ML20209J150 + (ML20209J150)
- ML20209J152 + (ML20209J152)
- ML20209J153 + (ML20209J153)
- ML20209J154 + (ML20209J154)
- IR 05000166/1987001 + (ML20209J155)
- ML20209J156 + (ML20209J156)
- 0CAN079903, Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with + (ML20209J158)
- ML20209J159 + (ML20209J159)
- ML20209J160 + (ML20209J160)
- DCL-85-126, Forwards Public Version of Revised Emergency Response Plan Sops,Including III.10, SOP Dept of General Svcs & III.24, Disaster Preparedness Plan for Peacetime Emergencies. Related Correspondence + (ML20209J161)
- ML20209J162 + (ML20209J162)
- ML20209J163 + (ML20209J163)
- ML20209J164 + (ML20209J164)
- 05000313/LER-1985-009-01, :on 841127,mechanical Shock Suppressor Failed During Inservice Insp Surveillance Functional Testing.Caused by Prolonged Exposure to Vibration & Heat.Failed or Degraded Snubbers Repaired or Replaced + (ML20209J166)
- ML20209J168 + (ML20209J168)
- ML20209J169 + (ML20209J169)
- IR 05000266/1987008 + (ML20209J170)
- ML20209J171 + (ML20209J171)
- ML20209J173 + (ML20209J173)
- ML20209J175 + (ML20209J175)
- ML20209J176 + (ML20209J176)
- ML20209J177 + (ML20209J177)
- 05000321/LER-1986-033, :on 860806,reactor Protection Sys Bus a Lost Because Motor Generator a Set Output Breaker Tripped.Caused by Failure of Motor Generator Set Overvoltage Relay 1C71-K751A.Relay Replaced + (ML20209J178)
- 05000282/LER-1987-004-01, :on 870330,during Safeguards Logic Test,Reactor Tripped Due to Inadvertent Safety Injection.Caused by Personnel Error.Safeguards Logic Tests Rewritten & Personnel Counseled + (ML20209J181)