ML20209J153

From kanterella
Jump to navigation Jump to search
Corrected Page to Monthly Operating Rept for Oct 1985
ML20209J153
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/31/1985
From: Stewart S
FLORIDA POWER CORP.
To:
Shared Package
ML20209J107 List:
References
NUDOCS 8609160172
Download: ML20209J153 (1)


Text

.

e OPERATING DATA REPORT DOCKETNO.

50-302 DATE 11-5-85 COMPLETED BY S.A. Stewart TELEPHONE (9041795-3802 OPERATING STATUS

1. Unit Namw:

Crystal River Unit 3 Notes (9/10/86) 10-1 10-31-85

2. Reportsg rened 3 ' W h P'**'(uws):

2544 Note circled changes due to

4. Namepiste Rating (Gross MWe):

890 an error in the September 825 report.

5. Dengn Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

860

7. Maximum Dependable Capacity (Net MWe):

821

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

none

9. Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restnctsons. If Any:

N/A l

l i

This Month Yr to.Dete Cumulative 745

11. Hours in Reportas Period 7296 75720
12. Number Of Hours Reactor Was Critical 687.4 3108.1 49023.8
13. Reactor Resme Shutdown Hours 0

0 1280.3

14. Hours Gomerator On-l.hu 613.5 7901.8 47819.6
15. Unit Rosesw hdawn Hom:

0 0

0

16. Gros Thersaal Energy Generated (MWH) 1487965 5863470 107525361 l
17. Gros Elecencel Energy Generated (MWH) 507467 C2003865)

M73108to i

18. Net Electrical Energy Generated (MWH) 481825 1890291 34886302 l
19. Uni Se,, ice yeetoe 82.3 %

3g,gg 63.2%

20. Unit Avanlebility Factor 82.3 %

39.8%

ti3 M 78.8%

C31.6%)

(57.9 9

21. Unit Capocay Facter (Usung MDC Net)
22. Unit Capeaty Factor (Using DER Net) 78.4%

C31. 4% )

(55.9 9 4.4 %

8.6%

19.6%

23. Unit Forced Ontage Rate
24. Sheadowns Scheduled Over Next 6 Months (Type.Dete.and Duration of Each):

l N/A

25. If Shut Down At End Of Report Pened. Estimated Date of Startup:

N/A

26. Units la Test Status (Prior to Cosimarcial Operation):

Forecast Achieved '

i l

INITIAL CRITICALITY I-I4-77

=

INITIAL ELECTRICITY 1-30*77 COMMERCIAL OPERATION 3-13-77 s

8609160172 860911 PDR ADOCK 05000302 R

PDR I'l77) l i

I-

.____-.-_.__.,_..--..,__._.m

_-..,__.-..--,___.-.__,,_,,,___-._..-.m

---..--7.------.<

-