Corrected Page to Monthly Operating Rept for Sept 1985
ML20209J147
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/30/1985
From: Graham D
FLORIDA POWER CORP.
To:
Shared Package
ML20209J107 List:
References
NUDOCS 8609160167
Download: ML20209J147 (1)


Text

1..

ATTACHMENT 2

(?.,

OPERATING DATA REPORT DOCKET NO.

50-302 DATE 10-3-85 COMPLETED BY D Grahnrt)

TELEPHONE ons -oc_a486 OPERATING STATUS

1. Unit Name:

Crvstal River Unit 3 Notes (9/10/86) 9-1 9-30-85

2. Reporting Period:
3. Licensed Thennal Power (MWr):

2544 Note circled changes 890 due to an error in the

4. Nameplate Rating (Gross MWe):

825 September report.

5. Desagn Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

860 821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted. lf Any (Net MWe):

N/A

10. Reasons For Restrictions.lf Any:

=

This Month Yr..to.Dete Cumulative

11. Hours In Reporting Period 7'n RAM 1 74975
12. Number Of Hours Reactor Was Critical 648.3 24?0.7 4 R33 6.4
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Genentor On4.ine 592.5 2288.3 47206.1 U

U U

15. Unit Reserve Shutdown Hours i
16. Gross Thermal Energy Generated (MWH) 1344Ra' 4375511 1080373os
17. Gross Electrical Energy Generated (MWH)

(462386J (T496402 )

C36223619)

I8. Net Electrical Energy Generated (MWH) 438588 1408466 34404477

19. Unit Service Factor 82.3 %

34.9%

63.0 %

20. Unit Availability Factor 82 3 %

34.9%

63.0 %

21. Unit Capacity Factor (Using MDC' Net)

(74 3G C26. 2D (57. 6%)

22. Unit Capacity Factor (Using DER Net)

C73.8Q C26.l O 55.6%

d'*

WM 19 M

23. Unit Forced Outage Rate l
24. Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each):

l

.N/A i

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

10-4-85

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY I-14-77, INITIAL ELECTRICITY l-30-77

,, COMMERCIAL OPERATION J-l J-! 7 8609160167 860911 PDR ADOCK 05000302 R