ML20209J147
Jump to navigation
Jump to search
| ML20209J147 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/30/1985 |
| From: | Graham D FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20209J107 | List: |
| References | |
| NUDOCS 8609160167 | |
| Download: ML20209J147 (1) | |
Text
1..
ATTACHMENT 2
(?.,
OPERATING DATA REPORT DOCKET NO.
50-302 DATE 10-3-85 COMPLETED BY D Grahnrt)
TELEPHONE ons -oc_a486 OPERATING STATUS
- 1. Unit Name:
Crvstal River Unit 3 Notes (9/10/86) 9-1 9-30-85
- 2. Reporting Period:
- 3. Licensed Thennal Power (MWr):
2544 Note circled changes 890 due to an error in the
- 4. Nameplate Rating (Gross MWe):
825 September report.
- 5. Desagn Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
860 821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted. lf Any (Net MWe):
N/A
- 10. Reasons For Restrictions.lf Any:
=
This Month Yr..to.Dete Cumulative
- 11. Hours In Reporting Period 7'n RAM 1 74975
- 12. Number Of Hours Reactor Was Critical 648.3 24?0.7 4 R33 6.4
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Genentor On4.ine 592.5 2288.3 47206.1 U
U U
- 15. Unit Reserve Shutdown Hours i
- 16. Gross Thermal Energy Generated (MWH) 1344Ra' 4375511 1080373os
- 17. Gross Electrical Energy Generated (MWH)
(462386J (T496402 )
C36223619)
I8. Net Electrical Energy Generated (MWH) 438588 1408466 34404477
- 19. Unit Service Factor 82.3 %
34.9%
63.0 %
- 20. Unit Availability Factor 82 3 %
34.9%
63.0 %
- 21. Unit Capacity Factor (Using MDC' Net)
(74 3G C26. 2D (57. 6%)
- 22. Unit Capacity Factor (Using DER Net)
C73.8Q C26.l O 55.6%
d'*
WM 19 M
- 23. Unit Forced Outage Rate l
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each):
l
.N/A i
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
10-4-85
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY I-14-77, INITIAL ELECTRICITY l-30-77
,, COMMERCIAL OPERATION J-l J-! 7 8609160167 860911 PDR ADOCK 05000302 R
-