Corrected Page to Monthly Operating Rept for Nov 1985
ML20209J171
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/30/1985
From: Graham D
FLORIDA POWER CORP.
To:
Shared Package
ML20209J107 List:
References
NUDOCS 8609160176
Download: ML20209J171 (1)


Text

.

t OPERATING DATA REPORT

~

DOCKETNO. 50-302 DATE 17 /'t / A9 COMPLETED BY D. Graham TELEPHONE 904 795-3802 OPERATING STATUS Notes (9/10/86)

1. Unit Name:

Crv'"21 it i ve r un1e 3

2. Reporting Period:

11/1/85 - 11/30/85 2544 Note circled changes due

3. Licensed Thermal Power (MWt):

to an error in the

4. Nameplate Rating (Gross MWe):

Ron September report.

5. Design Electrical Rating (Net MWe):

825

6. Maximum Dependable Capacity (Gross MWe):

860 821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

NA

9. Power hvel To Which Restricted. If Any (Net MWe):

NA

10. Reasons For Restrictions. If Any:

i This Month Yr..to.Dete Cumulative

11. Hours In Reporting Period 79n AntA 7 6 tit n
12. Number Of Hours Reactor Was Critical 671.3 3779.4 49695.1
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On-Line 668.2 3570 48487.8 l
15. Unit Resem Shutdown Hours 0

0 0

16. Gemas Thennal Energy Generated (MWH) 15504R0 7413925 109075811
17. Gross Electrical Energy Generated (MWH) 538751

_, C254262 D C 726983/ J

18. Net Electrical Energy Generated (MWH) 511645

_2401396 2539/94/

19. Unit Service Factor 42 At 44.51 63.47.
20. Unit Availabihty Factor 92.8%

44.5%

63.4%

86.6%

d6. SV 58.1%

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Uses DER Net) 86.11 66.3O 56.17
23. Unit Forced Outage Rate 7.2%

8.3%

19.4%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

NA-l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

NA

26. Units leTest Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77-COMMERCIAL OPERATION 3/13/77 l