ML20209J116

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re Seismic Qualification. Three Items Noted Requiring Further Action
ML20209J116
Person / Time
Site: River Bend 
Issue date: 11/01/1985
From: Butler W
Office of Nuclear Reactor Regulation
To: William Cahill
GULF STATES UTILITIES CO.
References
NUDOCS 8511110356
Download: ML20209J116 (5)


Text

--

NOV i 1985 Docket No. 50-458 Mr. William J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group Gulf States Utilities Company

. Post Office Box 2951 Beaumont, Texas 77704 ATTN: Mr. J. E. Booker

Dear Mr. Cahill:

Subject:

Request for Additional Infonnation - Seismic Qualification As a part of the NRC staff's review of your application for an operating license for River Bend Station, the staff has determined the need for additional information in the area of seismic qualification. As a result of the staff review of the River Bend Station audit on seismic qualifica-tion, three items were noted requiring further action on your part. These iter.s are contained in the enclosure.

Pleese inform NRC Project Manager, Stephen Stern, of your schedule for response and for clarification or further discussion on this topic.

Sincerely.

Originst Signed by Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing

Enclosure:

As stated cc w/erclosure:

See next page DISTRI R

WTEC NRC PDR Local PDR PRC System NSIC L

cading Olylton SStern ACRS (16)

OELD, Attorney JPartlow BGrimes EJordan RLaGrange OBagchi f

i l

LB#

LB#2/DL' pl SSt m

WButler W 11/ ) /85 11/j/85

  • !A"A88it 884481se P

PDR

k hDV 1 1985 Docket No. 50-458 Nr. Willian,u. Cthill, Jr.

Senior Vice Frcsident River Bend Nuclear Group Gulf States utilities Company Post Office Box 2951 Beaumont, Texas 77704 ATTN: hr. o E.Eccker

Dear Mr. Cahill:

Subject:

Recuest for Additional Information - Seismic Qualification As a port of the hRC statt's revio; cf your application for an creretirt licrrse fer River Bend Station, tFe stcff has aetermined the need for scditional information in the artc of seisnic qualification. As e rcshlt cf tre staff review of the River Bend Station aucit on seismic qualifict-ticri, three itens were noted requiring further action on your part. TFctc iters are contained in the enciesure.

Pieese inform NRC Project Manacer, Etcphen Stern, of your schedule tcr response and for clarification or further discussion on this tcpic.

Sincerely, Origin.11 Siene I by Walter R. Butler, Chief Licensing BrancF f!c. 2 Division of Licensirg

Enclosure:

As stateo cc w/erclosure:

See next page DISTRIBUTIGN Docket File NRC PDR Local PDR PRC System NSIC LB2 Pcadir.g EHylton SStern ACRS (16)

OLLD, Attorney JPartlow BGrines EJorder.

RLaGronge GBeschi A

l l.f i

LB#2 y3L LBs2/DL j

S5tM r1 WButler 11/ ) /85 11/j/85

~ _ _ _ -. _

-,~ -

an etc

+

UNITED STATES E

NUCLEAR REGULATORY COMMISSION 2

s.(

p, t

5

E WASHINGTON, D. C. 20555 t

i

%..... /

I N

IE Docket fic. 50-458 f

I Mr. William J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group i

Gulf States Utilities Con:pany Post Office Box 2951

}

Beaur.cnt, Texas 77704 l

ATTN: Mr. J. E. Booker i

Dear Mr. Cahill:

I'

Subject:

Fequest frr /dditicnal Information - Seismic Gualit tcation i

i As a part of the Akt staff's review of your applicatien for an operating i

license for Riscr Ferd Station, the staff has determined the need for accitional information in the area of seismic qualification.

l As a result of the staff resim cf the River Bend Station audit on scismic l

qualification, three items were noted requiring further action on your part.

t These items are contained in the enclosure.

1 Pleate inform NRC Project Manager, Stephen Stern, of your schedule for

{

response and for clarification or further discussien on this topic.

Sincerely, I

Lv

{

Valter R. Butler, Chief j

Liter. sing Branch No. 2 Division of Licensing i

1 i

j

Enclosure:

As stated j

cc w/ enclosure-i See rext page i

l i-

_ _,.. ~. _ _ - _. _, _ _..

_.__.__m._,..__._____._,_,.

Mr. William J. Cahill, Jr.

Gulf States Utilities Company River Bend Nuclear Plant cc:

Troy B. Conner, Jr., Esq.

Ms. Linda B. Watkins/Mr. Steven Irving Conner and Wetterhahn Attorney at Law 1747 Pennsylvania Avenue, NW 355 Napoleon Street Washingten. D.C.

20006 Baton Rouge, Louisiana 70802 Mr. William J. Reed, Jr.

kr. David Zaloudek Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Compary Louisiana Department of P. O. Box 2951 Environmental Quality Beaument, Texas 77704 P. O. Box 14690 Baton Rouge, Louisiana 70898 Richard M. Troy, Jr., Esq.

Assistant Attorney General in Charge Mr. J. David McNeill, III State of Louisiana Department of Justice William G. Davis, Esq.

234 Loyola Avenue Department of Justice New Orleans, Louisiana 70112 Attorney General's Office 7434 Perkins Road Resident Inspector Baton Rouge, Louisiana 70806 P. O. Box 1051 St. Francisville, Louisiana 70775 H. Anne Plettinger 3456 Villa Rose Drive Gretchen R. Rothschild Baton Rouge, Louisiana 70606 Louisianians for Safe Energy Inc.

1659 Glenmore Avenue Baton Rouge, Louisiana 70775 James W. Pierce, Jr., Esq.

P. O. Box 23571 Baton Rouge, Louisiana 70893 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 6

s o

Enclosure REQUEST FOR ADDITIONAL INFORMATION Please provide you cor,nitrent to arend your general naintance practices on the following items:

(a) Check for missing or loose screws before returning any equipnent iters to service f ollowing any repair or maintenance.

(b) Loose materials such as tanper proof bars over the set point adjustments on instrumentation ar.d control panels should not be placed cr. tcp of the CdDiMets, but sbculd be stored in a manner that prevents any harmful interaction with safety systems.

(c) A record of the inplementation of the instructicr.s to perform the checks on nissing screws erd prcper storage of loose roaterials shculd be kept in an auditcble n.cnr.er.

_ _