Text
.
+f
[C,,
UNITED STATES E
.g NUCLEAR REGULATORY COMMISSION 5
l W ASHINGTON, D. C. 20655
%,...../
LOUISIANA POWER AND LIGHT COMPANY DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 12 License No NPF-38 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The applications for amendment, dated October 1,1986, as supplemented by letters dated October 29 and November 19, 1986 by Louisiana Power and Light Company (licensee), comniv with standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the applications, the provisions of the Act, and the regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be. inimical to the comon defense and security or to the health and safety of the public; E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-38 is hereby amended to read as follows:
l i
pg2ogg g%gg2 1
P l
L
2 (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 12, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in this license.
LP&L shall operate the facility in accordance with the Technical i
Specifications and the Environmental Protection Plan.
3.
The license amendment is effective as of January 17, 1987.
FOR THE NUCLEAR REGULATORY COMMISSION h
JamesH. Wilson,ProjectManaaer PWR Project Directorate No. 7 Division of PWR Licensing-B
Attachment:
Changes to the Technical Specifications Date of Issuance: January 16, 1987 i
l l
l
.---~,e-----..
--,,,_._.,.,.n,---.,,.,--,,_,,,---,,.--._,,_,nn--.-.---.,,,--._.,-.------,.w-n,-
--~
January 16, 1987 ATTACHMENT TO LICENSE AMENDMENT NO. 12 TO FACILITY OPERATING LICENSE NO. NPF-38 DOCKET NO. 50-382 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change. Also to be replaced are the following overleaf pages to the amended pages.
Amendment Pages Overleaf Pages 2-1 2-2 2-3 2-4 B 2-1 B 2-2 B 2-5 B 2-6 3/4 1-27 3/4 1-28 3/4 2-1 3/4 2-2 3/4 2-2a 3/4 2-6 3/4 2-5 3/4 2-7 3/4 2-8 3/4 2-9 3/4 2-10 3/4 3-8 3/4 3-7 3/4 3-9 3/4 3-10 B 3/4 1-5 B 3/4 2-1 B 3/4 2-la B 3/4 2-3 B 3/4 2-4
2.0 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 2.1 SAFETY LIMITS 2.1.1 REACTOR CORE
)
DN8R 2.1.1.1 The DNBR of the reactor core shall be maintained greater than or i
equal to 1.26.
l i
APPLICABILITY: MODES 1 and 2.
ACTION:
l Whenever the ONBR of the reactor has decreased to less than 1.26, be in HOT l
l STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and comply with the requirements of Specification 6.7.1.
PEAK LINEAn HEAT RATE i
{
2.1.1.2 The peak linear heat rate (adjusted for fuel rod dynamics) of the j
fuel shall be maintained less than or equal to 21.0 kW/ft.
APPLICABILITY:
MODES 1 and 2.
ACTION:
I Whenever the peak linear heat rate (adjusted for fuel rod dynamics) of the fuel has exceeded 21.0 kW/ft, be in HOT STAN0BY w! thin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and comply with j
the requirements of Specification 6.7.1.
j REACTOR COOLANT SYSTEM PRESSURE i
2.1.2 The Reactor Coolant System pressure shall not exceed 2750 psia.
[
APPLICABILITY:
MODES 1, 2, 3, 4, and 5.
7 l
ACTION:
I MODES 1 and 2 j
Whenever the Reactor Coolant System pressure has exceeded 2750 psia, be 1
in HOT STAN0BY with the Reactor Coolant System pressure within its limit j
within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and comply with the requirements of Specification 6.7.1.
t l
MODES 3, 4, and 5 i
Whenever the Reactor Coolant System pressure has exceeded 2750 psia, reduce the Reactor Coolant System pressure to within its limit within 5 minutes, i
and comply with the requirements of Specification 6.7.1.
i i
i WATERFORD - UNIT 3 2-1 AMENDMENT NO.12
SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 4
0 2.2 LIMITING SAFETY SYSTEM SETTINGS REACTOR TRIP SETPOINTS 2.2.1 The reactor protective instrumentation setpoints shall be set consistent with the Trip Setpoint values shown in Table 2.2-1.
APPLICABILITY:
As shown for each channel in Table 3.3-1.
ACTION:
With a reactor protective instrumentation setpoint less conservative than the value shown in the Allowable Values column of Table 2.2-1, declare the channel inoperable and apply the applicable ACTION statement requirement of Specifica-tion 3.3.1 until the channel is restored to OPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value.
l i
I i
j i
l i
3 i
WATERFORD - UNIT 3
\\
2-2 AMEN 0 MENT NO.
5 l
i
TABLE 2.2-1 m
C REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS 9,
-o FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES b
1.
Manual Reactor Trip Not Applicable Not Applicable 5
2.
Linear Power Level - High w
Four Reactor Coolant Pumps 1 110.1% of RATED THERMAL POWER 5 110. A of RATED THERMAL POWER Operating 3.
Logarithmic Power Level - High (1) 1 0.25 R of RATED THERMAL POWER 1 0.275% of RATED THERMAL POWER 4.
Pressurizer Pressure - High 1 2365 psia i 2372 psia 5.
Pressurizer Pressure - Low
> 1684 psia (2)
> 1644 psia (2) 6.
Containment Pressure - High 1 17.1 psia i 17.3 psia mO I
7.
Steam Generator Pressure - Low
> 764 psia (3)
> 748 psia (3) i 8.
Steam Generator Level - Low
> 27.4% (4)
> 26. R (4) 9.
Local Power Density - High 1 21.0 kW/ft (5) 1 21.0 kW/ft (5) l
- 10. DISE - Low
> 1.26 (5)
> 1.26 (5) l 11.
Steam Generator Level - High 3 87.7% (4) 1 8.4% (4) 8 12.
Reactor Protection System Logic bot Applicable Not Applicable h
- 13. Reactor Trip Breakers Not Applicable Not Applicable R$
- 14. Core Protection Calculators Not Applicable Not Applicable
- 15. CEA Calculators Not Applicable Not Applicable U
- 16. Reactor Coolant Flow - Low
> 23.8 psid (7)
> 23.6 psid (7)
_,_-_,___,m__,..__.,,4-_
- ~ _.. - _ _ -. _ _ _ _
,, _. - _.. _ ~
- _ _ _ - ~ _.
.. _ _ -,.. _ _ ~. _ _ _.., _
m
TABLE 2.2-1 (Continued)
REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS TABLE NOTATIONS (1) Trip may be manually bypassed above 10 *% of RATED THERMAL POWER; bypass shall be automatically removed when THERMAL POWER is less than or equal i
to 10 4% of RATED THERMAL POWER.
(2) Value may be decreased manually, to a minimum of 100 psia, as pressurizer pressure is reduced, provided the margin between the pressurizer pressure i
and this value is maintained at less than or equal to 400 psi; the setpoint shall be increased automatically as pressurizer pressure is increased until the trip setpoint is reached.
Trip may be manually bypassed below 400 psia; bypass shall be automatically removed whenever pressurizer pressure is greater than or equal to 500 psia.
(3) Value may be decreased manually as steam generator pressure is reduced, provided the margin between the steam generator pressure and this value is maintained at less than or equal to 200 psi; the setpoint shall be increased automatically as steam generator pressure is increased until the trip setpoint is reached.
1 (4) % of the distance between., steam generator upper and low level instrument nozzles.
(5) As stored within the Core Protection Calculator (CPC).
Calculation of the trip setpoint includes measurement, calculational and processor uncertainties, and dynamic allowances.
Trip may be manually bypassed below 10 *% of RATED THERMAL POWER; bypass shall be automatically removed when THERMAL POWER is greater than or equal to 10 4% of RATED THERMAL t
POWER.
(6) Note 6 has been deleted.
(7) The setpoint may be altered to disable trip function during testing pursuant to Specification 3.10.3.
i 1
1 WATERf0R0 - UNIT 3 24 AMEN 0 MENT NO. 12 1
J
'.1 and 2.2 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 2
i BASES t
l l
2.1.1 REACTOR CORE The restrictions of these safety limits prevent overheating of the fuel cladding and possible cladding perforation which would result in the release l
of fission products to the reactor coolant.
Overheating of the fuel cladding j
t is prevented by (1) restricting fuel operation to within the nucleate boiling j
regime where the heat transfer coefficient is large and the cladding surface
~
temperature is slightly above the coolant saturation temperature, and (2) main-taining the dynamically adjusted peak linear heat rate of the fuel at or less than 21.0 kW/f t which will not cause fuel centerline melting in any fuel rod.
First, by operating within the nucleate boiling regime of heat transfer, the heat transfer coefficient is large enough so that the maximum clad surface temperature is only slightly greater than the coolant saturation temperature.
The upper boundary (of the nucleate boiling regime is termed " departure from nucleate boiling" DNB).
At this point, there is a sharp reduction of the t
heat transfer coefficient, which would result in higher cladding temperatures i
and the possibility of cladding failure.
l 1
l t
Correlations predict DNS and the location of DN8 for axially uniform and a
non-uniform heat flux distributions.
The local DNB ratio (DN8R), defined as l
l the ratio of the predicted DNB heat flux at a particular core location to the actual heat flux at that location, is indicative of the margin to DNB.
The j
minimum value of DNBR during normal operational occurrences is limited to 1.26 i
for the CE-1 correlation and is established as a Safety Limit.
This value is j
based on a statistical combination of uncertainties.
It includes uncertainties in the CHF correlation, allowances for rod bow and hot channel factors (related l
to fuel manufacturing variations) and allowances for other hot channel calcula-tive uncertainties.
l Second operation with a peak linear heat rate below that which would cause fuelcenterlinemeltingmaintainsfuelrodandcladdingintegrity.
Above this peak linear heat rate level (i.e., with some melting in the center), fuel rod l
integrity would be maintained only if the design and operating conditions are l
appropriate throughout the life of the fuel rods.
Volume changes which accom-pany the solid to liquid phase change are significant and require accommodation.
1 Another consideration involves the redistribution of the fuel which depends on the extent of the melting and the physical state of the fuel rod at the time of l
i l
melting.
Because of the above factors, the steady state value of the peak I
linear heat rate which would not cause fuel centerline melting is established l
l as a Safety Limit.
To account for fuel rod dynamics (lags), the directly indi-i cated linear heat rate is dynamically adjusted.
Limiting safety system settings for the Low DNBR, High Local Power Density, High Logarithmic Power Level Low >ressurizer Pressure and High Linear Power Level trips, and limiting conditions for operation on DNBR and kW/ft margin are specified such that there is a high degree of confidence that the specified i
acceptable fuel design limits are not exceeded during normal operation and design basis anticipated operational occurrences, j
WATERFORD - UNIT 3 8 2-1 Amendment No. 12 i
L
BASES 2.1.2 REACTOR COOLANT SYSTEM PRESSURE The restriction of this Safety Limit protects the integrity of the Reactor Coolant System from overpressurization and thereby prevents the release of radionuclides contained in the reactor coolant from reaching the containment atmosphere.
The Reactor Coolant System components are designed to Section III, 1974 Edition, of the ASME Code for Nuclear Power Plant Components which permits a maximum transient pressure of 110% (2750 psia) of design pressure.
The Safety Limit of 2750 psia is therefore consistent with the design criteria and associated code requirements.
The entire Reactor Coolant System is hydrotested at 3125 psia to demonstrate integrity prior to initial operation.
2.2.1 REACTOR TRIP SETPOINTS The Reactor Trip Setpoints specified in Table 2.2-1 are the values at which the Reactor Trips are set for each functional unit.
The Trip Setpoints have been selected to ensure that the reactor core and reactor coolant system are prevented from exceeding their Safety Limits during normal operation and design basis anticipated operational occurrences and to assist the Engineered Safety features Actuation System in mitigating the consequences of accidents.
Operation with a trip set less conservative than its Trip Setpoint but within its specified Allowable Value is acceptable on the basis that the difference between each Trip Setpoint and the Allowable Value is equal to or less than the drift allowance assumed for each trip in the safety analyses.
l The DNBR - Low and Local Power Density - High are digitally generated trip setpoints based on Limiting Safety System Settings of 1.26 and 21.0 kW/ft, respectively.
Since these trips are digitally generated by the Core Protection Calculators, the trip values are not subject to drifts common to l
trips generated by analog type equipment.
The Allowable Values for these trips are therefore the same as the Trip Setpoints.
To maintain the margins of safety assumed in the safety analyses, the calculations of the trip variables for the DNBR - Low and Local Power Density -
f High trips include the measurement, calculational and processor uncertainties and dynamic allowances as defined in the latest applicable revision of CEN-305-P, " functional Design Requirements for a Core Protection Calculator" and CEN-304-P, " Functional Design Requirements for a Control Element Assembly Calculator."
WATERFORD UNIT 3 022 AMENDMENT NO 12
i 4AFETYIIMITSANDLIMITINGSAFETYSYSTEMSETTINGS BASES Local Power Density - High (Continued)
The local power density (LPD), the trip variable, calculated by the CPC incorporates uncertainties and dynamic compensation routines.
These uncertainties and dynamic compensation routines ensure that a reactor trip l
occurs when the actual core peak LPD is sufficiently less than the fuel design l
limit such that the increase in actual core peak LPD after the trip will not result in a violation of the peak LPD Safety Limit.
CPC uncertainties related to peak LPD are the same types used for DN8R calculation.
Dynamic compensation l
for peak LPD is provided for the effects of core fuel centerline temperature delays (relative to changes in power density), sensor time delays, and protection i
system equipment time delays.
DNBR - Low The DNBR - Low trip is provided to prevent the DNBR in the limiting l
coolant channel in the core from exceeding the fuel design limit in the event of anticipated operational occurrences.
The DNBR - Low trip incorporates a low pressurizer pressure floor of 1860 psia.
At this pressure a DN8R - Low trip will automatically occur.
This low pressure trip also provides protection against steam generator tube rupture events.
The DNBR is calculated in the CPC utilizing the following information:
a.
Nuclear flux power and axial power distribution from the excore neutron flux monitoring system; b.
Reactor Coolant System pressure from pressurizer pressure measurement; c.
Differential temperature (Delta T) power from reactor coolant temperature and coolant flow measurements; d.
Radial peaking factors from the position measurement for the CEAs; e.
Reactor coolant mass flow re te from reactor coolant pump speed; f.
Core inlet temperature from reactor coolant cold leg temperature measurements.
The DNBR, the trip variable, calculated by the CPC incorporates various uncertainties and dynamic compensation routines to assure a trip is initiated prior to violation of fuel design limits.
These uncertainties and dynamic compensation routines ensure that a reactor trip occurs when the actual core DNBR is sufficiently greater than the fuel design limit such that the decrease WATERFORD - UNIT 3 625 AMENDMENT NO. 12 l
(
\\
BASES ON8R - Low (Continued) in actual core DN8R after the trip will not result in a violation of the DNBR Safety Limit of 1.26.
CPC uncertainties related to DNBR cover CPC input measurement uncertainties, algorithm modelling uncertainties, and computer equipment processing uncertainties.
Dynamic compensation is provided in the CPC calculations for the effects of coolant transport delays, core heat flux delays (relative to changes in core power), sensor time delays, and protection system equipment time delays.
The DNBR algorithm used in the CPC is valid only within the limits indicated below and operation outside of these limits will result in a CPC initiated trip.
a.
RCS Cold Leg Temperature-Low
> 495'F b.
RCS Cold Leg Temperature-High i 580'F c.
Axial Shape Index-Positive Not more positive than +0.5 d.
Axial Shape Index-Negative Not more negative than -0.5 e.
Pressurizer Pressure-Low
> 1860 psia f.
Pressurizer Pressure-High i 2375 psia g.
Integrated Radial Peaking Factor-Low
> 1.28 h.
Integrated Radial Peaking Factor-High
< 4.28 1.
Quality Margin-Low IO Steam Generator Level - High The Steam Generator Level - High trip is provided to protect the turbine from excessive moisture carry over.
Since the turbine is automatically tripped when the reactor is tripped, this trip provides a reliable means for providing protection to the turbine from excessive moisture carry over.
This trip's setpoint does not correspond to a Safety Limit and no credit was taken in the safety analyses for operation of this trip.
Its functional capability at the specified trip setting is required to enhance the overall reliability of the Reactor Protection System.
Reactor Coolant I: low - Low The Reactor Coolant Flow - Low trip provides protection against a reactor coolant pump sheared shaf t event arti a steam line break event with a loss-of-offsite power.
A trip is initiated when the pressure differential across the primary side of either steam generator decreases below a nominal setpoint of 23.8 psid.
The specified setpoint ensures that a reactor trip occurs to prevent violation of local power density or DNBR safety limits under the stated conditions.
WATERFORD - Uti!T 3 0 2-6 AfiENDMEf4T fl0.12
e e
e 0
-o 8
a?
8 o-
,a w
N
=
$-o 2
5
-5 M
g-g m
-z 2
E
-E
=
.g-g E
E /
/
m
[
I o
j f
f
-a-s 1
I J
T /
g A
m f
?
8-g p
o-
/
/
.4, TIMIL NOITRESNl.
/
f ETATS YDAETS MRET TROHS /
,s - s f
a A
a q
>r
,8 o
(
-g-TIMIL NOITRESNl- - -
ETATS YDAETS MRET GNOL /
Q
-8 8
8 8
8 8
8 s
W 8
s a
=-
o o
o o
a o
o o
o REWOP LAMREHT DETAR FO NOITCARF J10083 C'I 2 33V !NS381!0N liW!1S AS 1H38WV1 d0M38 MV13830HO - AN11 f C/t I-2L VW3NOH3NI N0* t2
l REACTIVITY CONTROL SYSTEMS i
PART-LENGTH CEA INSERTION LIMITS LIMITING CONDITION FOR OPERATION 3.1.3.7 Part-length CEA groups positioned between 0" - 17" withdrawn shall be restricted to prevent the neutron absorber section of the part-length CEA group from covering the same axial segment of the fuel assemblies for a period in excess of 7 EFP0 out of any 30 EFPD period.
APPLICABILITY: MODES 1 and 2.
ACTION:
With the neutron absorber section of the part-length CEA group covering any same axial segment of the fuel assemblies for a period exceeding 7 EFPD out of any 30 EFPD period, either:
Reposition the part-length CEA group to ensure no neutron absorber a.
section of the part-length CEA group is covering the same axial segment of the fuel assemblies within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or b.
Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.1.3.7 The position of the part-length CEA group shall be determined at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
WATERFORD - UNIT 3 3/4 1-28
.3/4.2 POWER DISTRIBUTION LIMITS 3
3/42.iLINEARHEATRATE LIMITING CONDITION FOR OPERATION 3.2.1 The linear heat rate limit (of Figure 3.2-1) shall be maintained by one of the following methods as applicable:
a.
Maintaining COLSS calculated core power less than or equal to COLSS calculated core power operating limit based on linear heat rate (when COLSS is in service); or b.
Operating within the region of acceptable operation of Figure 3.2-la using any operable CPC channel (when COLSS is out of service).
APPLICABILITY:
MODE I above 20% of RATED THERMAL POWER.
ACTION:
With the linear heat rate limit not being maintained as indicated by:
1.
COLSS calculated core power exceeding COLSS calculated core power operating limit based on linear heat rate; or 2.
When COLSS is out of service, operation outside the region of accep-table operation in Figure 3.2-la; within 15 minutes initiate corrective action to reduce the linear heat rate to within the limits and either:
a.
Restore the linear heat rate to within its limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, or b.
Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.1.1 The provisions of Specification 4.0.4 are not applicable.
4.2.1.2 The linear heat rate shall be determined to be within its limits when THERMAL POWER is above 20% of RATED THERMAL POWER by continuously monitoring the core power distribution with the Core Operating Limit Supervisory System (COLSS) or, with the COLSS out of service, by verifying at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that the linear heat rate, as indicated on any OPERAD E Local Power i
Density channel, is within the limits shown on Figure 3.2-la.
l 4.2.1.3 At least once per 31 days, the COLSS Margin Alarm shall be verified to actuate at a THERMAL POWER level less than or equal to the core power operating limit based on kW/ft.
WATERFORD - UNIT 3 3/4 2-1 AMENDMENT NO. 12
l I
13.8 a 557.5'F
}
Kw/FT g'
13.8 0 3 UNACCEPTABLE 3W OPEHATION Ez
<o 13.7 h
/
Oo U
k 13.6 g
/
13.5 Kw/FT wz a 520*F ACCEPTABLE OPERATION 13.5 go Ea
- w:
13.4 510 520 530 540 550 560' Tc INITIAL CORE COOLANT INLET TEMPERATURE, 'F.
FIGURE 3.2-la ALLOWABLE PEAK LINEAR HEAT RATE VS Tc FOR COLSS OUT OF SERVICE WATERFORD - UNIT 3 3/4 2-2a AMENDMENT NO. 12
j k
}
13.4 a 557.5'F Kw/FT 13.4 i
i UNACCEPTABLE I
OPERATION
$4 13.3 2
9 Ee 13.1 e
H 13.1 Kw/FT a 520 F\\
ACCEPTABLE 13.2 OPERATION r
<w E
J x
bc.
13.0, 7
510 520 530 540 550 560 Tc INITIAL CORE COOLANT INLET TEMPERATURE, 'F.
FIGURE 3.2-1 ALLOWABLE PEAK LINEAR HEAT RATE VS Tc WATERFORD - UNIT 3 3/4 2-2 AMENDMENT NO. 12
4 POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS 4.2.3.1 The provisions of Specificatior. 4.0.4 are not applicable.
4.2.3.2 The AZIMUTHAL POWER TILT shall be determined to be within the limit above 20% of RATED THERMAL POWER by:
a.
Continuously monitoring the tilt with COLSS when the COLSS is OPERABLE.
b.
Calculating the tilt at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the COLSS is inoperable.
c.
Verifying at least once per 31 days, that the COLSS Azimuthal Tilt Alarm is actuated at an AZIMUTHAL POWER TILT greater than the AZIMUTHAL POWER TILT Allowance used in the CPCs.
d.
Using the incore detectors at least once per 31 days to independently confirm the validity of the COLSS calculated AZIMUTHAL POWER TILT.
WATERFORD - UNIT 3 3/4 2-5 I
POWER DISTRIBUTION LIMITS 3/4.2.4 DNBR MARGIN LIMITING CONDITION FOR OPERATION
~
3.2.4 The DNBR margin shall be maintained by one of the following methods:
Maintaining COLSS calculated core power less than or equal to COLSS a.
calculated core power operating limit based on DNBR (when COLSS is in service, and either one or both CEACs are operable); or b.
Maintaining COLSS calculated core power less than or equal to COLSS calculated core power operating limit based on DNBR decreased by 13% RATED THERMAL POWER (when COLSS is in service and neither CEAC l
is operable); or c.
Operating within the region of acceptable operation of Figure 3.2-E using any operable CPC channel (when COLSS is out of service and either one or both CEACs are operable); or d.
Operating within the region of acceptable operation of Figure 3.2-3 using any operable CPC channel (when COLSS is out of service and neither CEAC is operable).
APPLICABILITY:
MODE 1 above 20% of RATED THERMAL POWER.
ACTION:
With the DNBR not being maintained:
1.
As indicated by COLSS calculated core power exceeding the appropriate COLSS calculated power operating limit; or 2.
With COLSS out of service, operation outside the region of acceptable operation of Figure 3.2-2 cr 3.2-3, as applicable; within 15 minutes inititate corrective action to increase the DNBR to within the limits and either:
a.
Restore the DNBR to within its limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, or l
b.
Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.4.1 The provisions of Specification 4.0.4 are not applicable.
4.2.4.2 The DNBR shall be determined to be within its limits when THERMAL POWER is above 20% of RATED THERMAL POWER by continuously monitoring the core power distribution with the Core Operating Limit Supervisory System (COLSS) or, with the COLSS out of service, by verifying at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that the DNBR, as indicated on any OPERABLE DNBR channel, is within the limit shown on Figure 3.2-2 or Figure 3.2-3.
I 4.2.4.3 At least once per 31 days, the COLSS Margin Alarm shall be verified to actuate at a THERMAL POWER level less than or equal to the core power operating limit based on DNBR.
WATERFORD - UNIT 3 3/4 2-6 AMENDMENT NO. 12
POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS (Continued)
This page intentionally left blank i
i i
WATERFORD - UNIT 3 3/4 2-7 AMEN 0 MENT NO. 12
COLSS OUT OF SERVICE DNBR LIMIT LINE 2.5 2.4 ACCEPTABLE OPERATION 2.3 2
O y
MINIMUM 1 CEAC OPERABLE o
E 5
2.2 (0.0, 2.20)
E
(.22, 2.20)
O n.O l
2.1 -
UNACCEPTABLE
(.17, 2.07)
OPERATION 2.0 -
l l
l 1.9 I
I I
i
-0.3
-0.2
-0.1 0.0 0.1 0.2 0.3 i
CORE AVERAGE ASI FIGURE 3.2-2 l
DNBR MARGIN OPERATING LIMIT BASED ON CORE PROTECTION CALCULATORS (COLSS OUT OF SERVICE, CEACs OPERABLE)
WATERFORD - UNIT 3 3/4 2-8 AMENDMENT NO. 12
I COLSS OUT OF SERVICE DNBR LIMIT LINE 2.8 i
ACCEPTABLE OPERATION g
CEACs INOPERABLE g
ca 5
2.s (0.0, 2.s)
E (0.22, 2.6) 3 E
E 2
2.5 g
c.O UNACCEPTABLE OPERATION 2.4
(-0.17, 2.4) 2.3
-0.3
-0.2
-0.1 0.0 0.1 0.2 0.3 CORE AVERAGE ASI FIGURE 3.2-3 DNBR MARGIN OPERATING LIMIT BASED ON CORE PROTECTION CALCULATORS (COLSS OUT OF SERVICE, CEACs IN0PERABLE)
WATERFORD - UNIT 3 3/4 2-9 AMENDMENT NO. 12
POWER DISTRIBUTION LIMITS 3/4.2.5 RCS FLOW RATE LIMITING CONDITION FOR OPERATION 3.2.5 The actual Reactor Coolant System total flow rate shall be greater than or equal to 148.0 x 106 lbm/h.
APPLICABILITY:
MODE 1.
ACTION:
With the actual Reactor Coolant System total flow rate determined to be less than the above limit, reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.5 The actual Reactor Coolant System total flow rate shall be determined to be greater than or equal to the above limit at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
WATERFORD - UNIT 3 3/4 2-10
TABLE 3.3-1 (Continued)
ACTION STATEMENTS 2.
Within 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s:
a)
All full-length and part-length CEA groups are withdrawn to and subsequently maintained at the
" Full Out" position, except during surveillance testing pursuant to the requirements of Specification 4.1.3.1.2 or for control when CEA group 6 may be inserted no further than 127.5 inches withdrawn.
b)
The "RSPT/CEAC Inoperable" addressable constant in the CPCs is set to the inoperable status.
c)
The Control Element Drive Mechanism Control System (CEDMCS) is placed in and subsequently maintained in the "Off" mode except during CEA group 6 motion permitted by a) above, when the CEDMCS may be operated in either the Manual Group" or " Manual Individual" mode.
3.
At least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, all full-length and part-length CEAs are verified fully withdrawn except during surveillance testing pursuant to Specifica-tion 4.1.3.1.2 or during insertion of CEA group 6 as permitted by 2.a) above, then verify at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> that the inserted CEAs are aligned within 7 inches (indicated position) of all other CEAs in its group.
ACTION 7 With three or more auto restarts of one non-bypassed calculator during a 12-hour interval, demonstrate calculator OPERABILITY by performing a CHANNEL FUNCTIONAL TEST within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
ACTION 8 With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or open the reactor trip breakers within the r. ext hour.
WATERFORD - UNIT 3 3/4 3-7
TABLE 3.3-2 r
23 REACTOR PROTECTIVE INSTRUMENTATION RESPONSE TIMES 98 Eg FUNCTIONAL UNIT RESPONSE TIME h
1.
Manual Reactor Trip Not Applicable
-d 2.
Linear Power Level - High u,
-< 0.40 second*
3.
Logarithmic Power Level - High
< 0.40 second*
4.
Pressurizer Pressure - High 5 0.90 second 5.
Pressurizer Pressure - Low
< 0.90 second 6.
Containment Pressure - High
< 1.70 seconds 7.
Steam Generator Pressure - Low
$ 0.90 second u,
1 8.
Steam Generator Level - Low i 0.90 second u,
do 9.
Local Power Density - High a.
Neutron Flux Power from Excore Neutron Detectors
< 0.429 second*
b.
CEA Positions
< 0.424 second**
c.
CEA Positions:
CEAC Penalty Factor 7 0.379 second 10.
DNBR - Low a.
Neutron Flux Power from Excore Neutron Detecto--
< 0.429 second*
b.
CEA Positions 7 0.424 second**
3, Ri c.
Cold Leg Temperature 50.258second#
as d.
Hot Leg Temperature 1 0.429 second#
pq e.
Primary Coolant Pump Shaft Speed 1 0.237 second**
25 f.
Reactor Coolant Pressure from Pressurizer
< 0.429 second##
2 9
CEA Positions:
CEAC Penalty Factor 50.379second
.O w
N
TABLE 3.3-2 (Continued) t 2$
REACTOR PROTECTIVE INSTRUMENTATION RESPONSE TIMES 98 8
FUNCTIONAL UNIT RESPONSE TIME 11.
Steam Generator Level - High Not Applicable c:
i'i
]
12.
Reactor Protection System Logic Not Applicable 13.
Reactor Trip Breakers Not Applicable 14.
Core Protection Calculators Not Applicable 15.
CEA Calculators Not Applicable 16.
Reactor Coolant Flow - Low 0.70 second R.
.c S'
- Neutron detectors are exempt from response time testing.
Response time of the neutron flux signal portion of the channel shall be measured from detector output or input of first electronic component in channel.
- Response time shall be measured from the time the CPC/CEAC receives an input signal until the electrical power is interrupted to the CEA drive mechanism.
- Response time shall be measured from the output of the sensor.
RTD response time for all the RTDs shall be measured at least once per 18 months.
The measured P of the slowest RTD shall be less than 7
or equal to 8 seconds (P assumed in the safety analysis).
- Response time shall be measured from the output of the pressure transmitter.
The transmitter response E
time shall be less than or equal to 0.70 second.
9 E9 5
TABLE 4.3-1 REACTOR PROTECTIVE INSTRUMENTATION SURVEILLANCE REQUIREMENTS o:=
CHANNEL MODES FOR WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE E
FUNCTIONAL UNIT CHECK CALIBRATION TEST IS REQUIRED-w 1.
Manual Reactor Trip N.A.
N.A.
R and S/U(1) 1, 2, 3*, 4*, 5*
2.
Linear Power Level - High S
0(2,4),M(3,4), M 1, 2 Q(4) 3.
Logarithmic Power Level - High 5
R(4)
M and S/U(1) 1,2,3,4,5 4.
Pressurizer Pressure - High 5
R M
1, 2 5.
Pressurizer Pressure - Low S
R M
1, 2 6.
Containment Pressure - High S
R M
1, 2 w
7.
Steam Generator Pressure - Low S
R M
1, 2 8.
Steam Generator Level - Low S
R M
1, 2 9.
Local Power Density - High S
D(2,4), R(4,5) M,R(6) 1, 2 10.
DNBR - Low S
S(7),D(2,4),
M, R(6) 1, 2 M(8), R(4,5) 11.
Steam Generator Level - High S
R M
1, 2 12.
Reactor Protection System Logic N.A.
N.A.
M and S/U(1) 1, 2, 3*, 4*, 5*
REACTIVITY CONTROL SYSTEMS BASES MOVABLE CONTROL ASSEMBLIES (Continued)
CEA positions and OPERABILITY of the CEA position indicators are required to be verified on a nominal basis of once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with more frequent veri-fications required if an automatic monitoring channel is inoperable.
These verification frequencies are adequate for assuring that the applicable LC0's are satisfied.
The maximum CEA drop time restriction is consistent with the assumed CEA drop time used in the safety analyses.
Measurement with T,yg greater than or equal to 520 F and with all reactor coolant pumps operating ensures that the measured drop times will be representative of insertion times experienced during a reactor trip at operating conditions.
The establishment of LSSS and LCOs requires that the expected long and short-term behavior of the radial peaking factors be determined.
The long term behavior relates to the variation of the steady-state radial peaking factors with core burnup and is affected by the amount of CEA insertion assumed, the portion of a burnup cycle over which such insertion is assumed, and the expected power level variation throughout the cycle.
The short term behavior relates to transient perturbations to the steady-state radial peaks due to radial xenon redistribution. The magnitudes of such perturbations depend upon the expected use of the CEAs during anticipated power reductions and load maneuvering.
Analyses are performed based on the expectea mode of operation of the NSSS (base loaded, or load maneuvering) and from these analyses CEA insertions are determined and a consistent set of radial peaking factors defined.
The Long Term Steady State and Short Term Insertion Limits are determined based upon the assumed mode of operation used in the analyses and provide a means of preserving the assumptions on CEA insertions used.
The limits specified serve to limit the behavior of the radial peaking factors within the bounds determined from analy-sis. The actions specified serve to limit the extent of radial xenon redistri-bution effects to those accommodated in the analyses.
The Long and Short Term Insertion Limits of Specification 3.1.3.6 are specified for the plant which has been designed for primarily base loaded operation but which has the ability to accommodate a limited amount of load maneuvering.
The Transient Insertion Limits of Specification 3.1.3.6 and the Shutdown CEA Insertion Limits of Specification 3.1.3.5 ensure that (1) the minimum SHUT-DOWN MARGIN is maintained, and (2) the potential effects of a CEA ejection acci-dent are limited to acceptable levels.
Long-term operation at the Transient 1
Insertion Limits is not permitted since such operation could have effects on the core power distribution which could invalidate assumptions used to determine the behavior of the radial peaking factors.
Insertion of Reg. Groups 5 and 6 is permitted to be essentially tip-to-tip within the limits imposed by the Tran-sient Insertion Limit Line.
This method of insertion is protected from sequence errors by the Core Protection Calculators.
The Part Length CEA Insertion Limits of Specification 3.1.3.7 ensure that adverse power shapes and rapid local power changes which affect radial peaking factors and DNB considerations do not occur as a result of a part-length CEA group covering the same axial segment of the fuel assemblies for an extended period of time during operation.
WATERFORD - UNIT 3 B 3/4 1-5 AMENDMENT NO. 12
- - - -.. -. -.. - - - - ~.... _...-
... - -. -. ~ _. -... _.
1
.s t
1 e
.Y S
)
F 4,
i B
I f
k 1
(I' I.
[
[
i e
[
e i
s
~
t t
I I
t t
t I
i.
t e
6 F
I I
{
h 6
I I
l l
I 6
t t
t t
I r
Wm..
3/4.2 POWER DISTRIBUTION LIMITS BASES 3/4.2.1 LINEAR HEAT RATE The limitation on linear heat rate ensures that in the event of a LOCA, the peak temperature of the fuel cladding will not exceed 2200*F.
Either of the two core power distribution monitoring systems, the Core Operating Limit Supervisory System (COLSS) and the Local Power Density channels in the Core Protection Calculators (CPCs), provides adequate monitoring of the core power distribution and is capable of verifying that the linear heat rate does not exceed its limits.
The COLSS performs this function by continuously monitoring the core power distribution and calculating a core power operating limit corresponding to the allowable peak linear heat rate.
Reactor operation at or below this calculated power level assures that the limit of l
Figure 3.2-1 is not exceeded.
The COLSS calculated core power and the COLSS calculated core power operating limits based on linear heat rate are continuously monitored and displayed to the operator.
A COLSS alarm is annunciated in the event that the core power exceeds the core power operating limit.
This provides adequate margin to the linear heat rate operating limit for normal steady-state operation.
Normal reactor power transients or equipment failures which da not require a reactor trip may result in this core power operating limit being exceeded.
In the event this occurs, COLSS alarms will be annunciated.
If the event which causes the COLSS limit to be exceeded results in conditions which approach the core safety limits, a reactor trip will be initiated by the Reactor Protective Instrumentation.
The COLSS calculation of the linear heat rate limit includes appropriate uncertainty and penalty factors necessary to provide a 95/95 confidence level that the maximum linear heat rate calculated by COLSS is greater than or equal to that existing in the core.
To ensure that the design margin to safety is maintained, the COLSS computer program includes an Fxy measurement uncertainty factor of 1.053, an engineering uncertainty factor of 1.03, a THERMAL POWER measurement uncertainty factor of 1.02 and appropriate penalty factors for rod bow.
Parameters required to maintain the operating limit power level based on linear heat rate, margin to DNB and total core power are also monitored by the CPCs (assuming minimum core power of 20% of RATED THERMAL POWER).
The 20%
RATED THERMAL POWER threshold is due to the neutron flux detector system being less accurate below 20% core power.
Core noise level at low power is too large to obtain usable detector readings. Therefore, in the event that the COLSS is not being used, operation within the limits of Figure 3.2-D. can be maintained by l
utilizing a predetermined local pov a M ;ti marg:r, a,d a total core p uer limit in the CPC trip channe;s.
TN sum ' : cod uncertai
> o d penalty factors a e a' a included in the CiCx These m I:ty factors are uttermine.d from uncertaw t m a :iated with planar radiC 1 aking measurements, engineering heat flux m.ca t tinty, axial densification, software algorithm modelling, computer processir., rod bow, and core power.neasurement.
WATERFORD - UNIT 3 B 3/4 2-1 AMENDMENT NO. 12
4 BASES
-The additional uncertainty terms included in the CPC's for transient protection are credited in Figure 3.2-la since this curve is intended to monitor the LCO only during steady state operation.
i i
}
i i
i i
i 2
N 5i l
l i
i 1
l l
l i
I i
(
WATERFORD - 3 B 3/4 2-la AMENDMENT NO. 12 i
I f
~ _.. _ _
POWER DISTRIBUTION LIMITS BASES AZIMUTHAL POWER TILT - Tq (Continued)
P
/P is the ratio of the power at a core location in the presence tilt untilt of a tilt to the power at that location with no tilt.
3/4.2.4 DNBR MARGIN The limitation on DNBR as a function of AXIAL SHAPE INDEX represents a conservative envelope of operating conditions consistent with the safety analy-sis assumptions and which have been analytically demonstrated adequate to main-tain an acceptable minimum DNBR throughout all anticipated operational occur-Operation of the core with a DNBR at or above this limit provides as-rences.
surance that an acceptable minimum DNBR will be maintained.
Either of the two core power distribution monitoring systems, the Core Operating Limit Supervisory System (COLSS) and the DNBR channels in the Core Protection Calculators (CPCs), provides adequate monitoring of the core power distribution and is capable of verifying that the DNBR does not violate its limits.
The COLSS performs this function by continuously monitoring the core power distribution and calculating a core operating limit corresponding to the allowable minimum DNBR.
The COLSS calculation of core power operating limit based on the minimum DNBR limit includes appropriate penalty factors which provide a 95/95 probability / confidence level that the core power calculated by COLSS, based on the minimum DNBR limit, is conservative with respect to the actual core power limit.
These penalty factors are determined from the uncer-tainties associated with planar radial peaking measurements, state parameter
{
measurement, software algorithm modelling, computer processing, rod bow, and core power measurement.
Parameters required to maintain the margin to DNB and total core power are also monitored by the CPCs.
Therefore, in the event that the COLSS is not being used, operation within the limits of Figure 3.2.2 or Figure 3.2-3 can be maintained by utilizing a predetermined DNBR as a function of AXIAL SHAPE INDEX j
and by monitoring the CPC trip channels.
The above listed uncertainty and penalty factors plus those associated with startup test acceptance criteria are also included in the CPCs which assume a minimum core power of 20% of RATED THERMAL POWER.
The 20% RATED THERMAL POWER threshold is due to the neutron flux detector system being less accurate below 20% core power.
Core noise level at low power is too large to obtain usable detector readings.
WATERFORD - UNIT 3 83/42-3 AMENDMENT NO. 12
POWER DISTRIBUTION LIMITS BASES DNBR MARGIN (Continued)
A DNBR penalty factor has been included in the COLSS and CPC DNBR calcula-tions to accommodate the effects of rod bow.
The amount of rod bow in each assembly is dependent upon the average burnup experienced by that assembly.
Fuel assemblies that incur higher average burnup will experience a greater magnitude of rod bow.
Conversely, lower burnup assemblies will experience less rod bow.
In design calculations, the penalty for each batch required to l
compensate for rod bow is determined from a batch's maximum average assembly burnup applied to the batch's maximum integrated planar-radial power peak.
A single net penalty for COLSS and CPC is then determined from the penalties associated with each batch, accounting for the offsetting margins due to the lower radial power peaks in the higher burnup batches.
3/4.2.5 RCS FLOW RATE This specification is provided to ensure that the actual RCS total flow rate is maintained at or above the minimum value used in the LOCA safety analyses, and that the ONBR is maintained within the safety limit for Anti-cipated Operational Occurrences (A00).
3/4.2.6 REACTOR COOLANT COLD LEG TEMPERATURE This specification is provided to ensure that the actual value of reactor coolant cold leg temperature is maintained within the range of values used in the safety analyses, with adjustment for instrument accuracy of 12 F, and that the peak linear heat generation rate and the moderator temperature coefficient effects are validated.
3/4.2.7 AXIAL SHAPE INDEX This specification is provided to ensure that the actual value of AXIAL SHAPE INDEX is maintained within the range of values used in the safety analyses, to ensure that the peak linear heat rate and DNBR remain within the safety limits for Anticipated Operational Occurrences (A00).
j 3/4.2.8 PRESSURIZER PRESSURE This specification is provided to ensure that the actual value of pressurizer pressure is maintained within the range of values used in the safety analyses.
The inputs to CPCs and COLSS are the most limiting.
The values are adjusted for an instrument accuracy of i 25 psi.
The sensitive l
events are SGTR, LOCA, FWLB and loss of condenser vacuum to initial high pressure, and MSLB to initial low pressure.
i l
l WATERFORD - UNIT 3 83/42-4 AMENDMENT NO. 12