Monthly Operating Rept for Aug 1986
ML20209J114
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/1986
From: Graham D
FLORIDA POWER CORP.
To:
Shared Package
ML20209J107 List:
References
NUDOCS 8609160159
Download: ML20209J114 (5)


Text

r-

,--9

/

i O

OPER AllNG DkT A REPOH1 DOC Al1 NO.

50-302 DATE 9/3/86 COMPLET LD 14Y TL Grnham 1 ELLi'llONE (904) 795-3802 OPERATING STATUS h 0 '"

1. Unit Name:

Crystal River Unit 3 8/1/86 - 8/31/86

2. Reporting Period:

2544

3. Licensed Thermal Power (MWI):

890

4. Nameplate Rating (Gross MWe):

825 S. Design Electrical Rating (Net MWe):

860

6. Maximum Dependable Capacity (Gross MWe):

821 i

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Iast Report. Give Reasons:

NA NA

9. Power level To Which Restricted,lf Any (Net MWe):

NA

10. Reasons For Restrictions,if Any:

v This Month Yr. to Date Cumulatise

11. Hours In Reporting Period 744 5831 83015
12. Number Of Hours Reactor Was Critical 744 1777.9 52078.9 1

0 0

1280.3

13. Reactor Rescne Shutdown Hour,
14. Hours Generator On-Line 744 1757.2 50848 0

0 0

15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1767095 4191629 114660494
17. Gross Electrical Energy Generated (MWH) 611278 _ _,

1448549 39204851

18. Net Electrical Energy Generated (MWH) 581370 1377512 37237098
19. Unit Senice Factor 10006 30.196 61.3 %

l

_20. Unit Availability Factor 10006 30.196 61.396 l

21. Unit Capacity Factor (Using MDC Net) 95.296 28.896 56.296 94.7?6 28.696 54.4 %

l

22. Unit Capacity Factor (Using DER Net) 0%

69.9 6 23.8 %

l

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Monthk (Type. Date.and Duration of Each):

NA l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

I

26. Units In Test Status (Prior to Commercial Operation).

Forecast Achiesed I/I4/77

! t/

INITI A L CRil'lCA LITY I/30/77 INITI AL ELECTRICITY 3/13/77 COMMERCI AL OPER ATION 8609160159 860911 PDR ADOCK 05000302 PDR R

(qf77;

AVI R AGL l> Alti l Nil Pow't.R Li \\ 11 DOC KET NO.

50-302 UNil FLCRP-3 DATE 9/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(Mwe. Net)

I 707 7

822 OII 826 2

18 3

713 19 812 795 4

20 827 5

825 21 810 851 815 6

22 7

788 23 828 772 831 8

24 9

626 25 796 605 805 10 26 II 813 27 823 826 651 12 28 823 814 l3 29 823 818 34 30 790 826 15 31 l

754 l

16 INSTRUC110NS On this format list the average daily unit power leselin MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.

I e

(9 /77 )

l l

l

50-302 W

DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME F LCR P-3 DATE n!2/RR COMPLETED BY R. A. Rtowart-REPORT MONTH 8/86 TELEPif0NE (ona) v ns-3802-c EO 3

-"E9 Licensee E,

Eg Cause & Corrective No.

Date k

j!

i 3$d Event h

Attnin to yE 3gc Report #

rn U Present Recurrence H

o v

c5 86-05 8G0801 F

0.0 A

5 NA IIC IITEXCII Reduced power to locate and repair a condenser salt leak in the "C" waterbox.

86-06 860801 S

0.0 B

5 NA IIF llTEXCil Operated at reduced power to remove loose barnacles from both secondary services heat exchangers.

86-07 860802 F

0.0 A

5 NA IE CRDRVE Received high control rod drive stator temperature alarm. An instrument i

problem was corrected.

86-08 860803 F

0.0 A

5 NA IIC IITEXCII Reduced power to locate and repair a condenser salt leak in the "A" waterbox.

86-09 860808

-F 0.0 F

5 NA IIF PUB 1PXX Circulating water pump IC had a shaft bearing replaced.

(Continued on next page.).

I 2

'.h 4

F: Forced Reason:

Method Exhibit G. Instrutnons S: Scheduled A Equipment Failure (Explain) for Preparation of Data B Maintenance of Test N*[{Ser.,

Entry Sheets for Licensee C Refueling 3-Auto Scram Event Report (Li'RI File (Nt'RI r.

D Regulatory Restriction 4-Continued 0161)

^ E Operator Training & License Exarnination 5-Reduced Load 9-Other F Administrative G-Operational Error (Explain)

Exhibit I - Same Source 03/77) 11-Other (Explain)

50-302 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME F LC R P-3 DATE 9/3/86 COMPLETED BY S. A. Stownrt REPORT MONTH 8/86 TELEPHONE (904) 79r-3 Rn2 i

i

,$g 3

E Licensee

{g k'.8 Action to Cause & Corrective No.

Date R

Eg 4

.2 s 5 Event g'ir f

E 3 ;yj e Report #

in U hO Present Recurrence H

u 6

86-10 860815 F

0.0 A

5 NA ZZ ZZZZZZ Excess sea grass caused the shear pin of Amertap filters to break. Reduced power to replace.

86-11 860828 F

0.0 F

5 NA IIC IITEXCII Reduced power to repair condenser salt leaks and clean secondary services heat exchangers.

i I

2 4

F: Forced Reason:

Method Fxhibit G-Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data

,_g,,,,3 B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Auto Scram Event Report (LI:R) File tnt'RI r.

D Regulatory Restriction 4-continued 0161)

E-Operator Training & License E camination 5-Reduced Load 9-Other F-Administrative G Operational Error (Explain)

Exhibit I-Same Source (9/77)

H Other (Explain)

MONTHLY OPERATIONAL SUIS *.ARY STATD DG DOCKET NO. 50-302 UNIT F LC RP-3 DATE 9/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH August

SUMMARY

STATEMENT:

Crystal River 3 was on-line the entire month. Power was reduced for condenser salt leaks, secondary services heat exchanger cleaning, a minor control rod drive instrument problem, and the replacement of a circulating water pump bearing.