ML20209J114
| ML20209J114 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/31/1986 |
| From: | Graham D FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20209J107 | List: |
| References | |
| NUDOCS 8609160159 | |
| Download: ML20209J114 (5) | |
Text
r-
,--9
/
i O
OPER AllNG DkT A REPOH1 DOC Al1 NO.
50-302 DATE 9/3/86 COMPLET LD 14Y TL Grnham 1 ELLi'llONE (904) 795-3802 OPERATING STATUS h 0 '"
- 1. Unit Name:
Crystal River Unit 3 8/1/86 - 8/31/86
- 2. Reporting Period:
2544
- 3. Licensed Thermal Power (MWI):
890
- 4. Nameplate Rating (Gross MWe):
825 S. Design Electrical Rating (Net MWe):
860
- 6. Maximum Dependable Capacity (Gross MWe):
821 i
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Iast Report. Give Reasons:
NA NA
- 9. Power level To Which Restricted,lf Any (Net MWe):
NA
- 10. Reasons For Restrictions,if Any:
v This Month Yr. to Date Cumulatise
- 11. Hours In Reporting Period 744 5831 83015
- 12. Number Of Hours Reactor Was Critical 744 1777.9 52078.9 1
0 0
1280.3
- 13. Reactor Rescne Shutdown Hour,
- 14. Hours Generator On-Line 744 1757.2 50848 0
0 0
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1767095 4191629 114660494
- 17. Gross Electrical Energy Generated (MWH) 611278 _ _,
1448549 39204851
- 18. Net Electrical Energy Generated (MWH) 581370 1377512 37237098
- 19. Unit Senice Factor 10006 30.196 61.3 %
l
_20. Unit Availability Factor 10006 30.196 61.396 l
- 21. Unit Capacity Factor (Using MDC Net) 95.296 28.896 56.296 94.7?6 28.696 54.4 %
l
- 22. Unit Capacity Factor (Using DER Net) 0%
69.9 6 23.8 %
l
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Monthk (Type. Date.and Duration of Each):
NA l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
I
- 26. Units In Test Status (Prior to Commercial Operation).
Forecast Achiesed I/I4/77
! t/
INITI A L CRil'lCA LITY I/30/77 INITI AL ELECTRICITY 3/13/77 COMMERCI AL OPER ATION 8609160159 860911 PDR ADOCK 05000302 PDR R
(qf77;
AVI R AGL l> Alti l Nil Pow't.R Li \\ 11 DOC KET NO.
50-302 UNil FLCRP-3 DATE 9/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(Mwe. Net)
I 707 7
822 OII 826 2
18 3
713 19 812 795 4
20 827 5
825 21 810 851 815 6
22 7
788 23 828 772 831 8
24 9
626 25 796 605 805 10 26 II 813 27 823 826 651 12 28 823 814 l3 29 823 818 34 30 790 826 15 31 l
754 l
16 INSTRUC110NS On this format list the average daily unit power leselin MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.
I e
(9 /77 )
l l
l
50-302 W
DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME F LCR P-3 DATE n!2/RR COMPLETED BY R. A. Rtowart-REPORT MONTH 8/86 TELEPif0NE (ona) v ns-3802-c EO 3
-"E9 Licensee E,
Eg Cause & Corrective No.
Date k
j!
i 3$d Event h
Attnin to yE 3gc Report #
rn U Present Recurrence H
o v
c5 86-05 8G0801 F
0.0 A
5 NA IIC IITEXCII Reduced power to locate and repair a condenser salt leak in the "C" waterbox.
86-06 860801 S
0.0 B
5 NA IIF llTEXCil Operated at reduced power to remove loose barnacles from both secondary services heat exchangers.
86-07 860802 F
0.0 A
5 NA IE CRDRVE Received high control rod drive stator temperature alarm. An instrument i
problem was corrected.
86-08 860803 F
0.0 A
5 NA IIC IITEXCII Reduced power to locate and repair a condenser salt leak in the "A" waterbox.
86-09 860808
-F 0.0 F
5 NA IIF PUB 1PXX Circulating water pump IC had a shaft bearing replaced.
(Continued on next page.).
I 2
'.h 4
F: Forced Reason:
Method Exhibit G. Instrutnons S: Scheduled A Equipment Failure (Explain) for Preparation of Data B Maintenance of Test N*[{Ser.,
Entry Sheets for Licensee C Refueling 3-Auto Scram Event Report (Li'RI File (Nt'RI r.
D Regulatory Restriction 4-Continued 0161)
^ E Operator Training & License Exarnination 5-Reduced Load 9-Other F Administrative G-Operational Error (Explain)
Exhibit I - Same Source 03/77) 11-Other (Explain)
50-302 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME F LC R P-3 DATE 9/3/86 COMPLETED BY S. A. Stownrt REPORT MONTH 8/86 TELEPHONE (904) 79r-3 Rn2 i
i
,$g 3
E Licensee
{g k'.8 Action to Cause & Corrective No.
Date R
Eg 4
.2 s 5 Event g'ir f
E 3 ;yj e Report #
in U hO Present Recurrence H
u 6
86-10 860815 F
0.0 A
5 NA ZZ ZZZZZZ Excess sea grass caused the shear pin of Amertap filters to break. Reduced power to replace.
86-11 860828 F
0.0 F
5 NA IIC IITEXCII Reduced power to repair condenser salt leaks and clean secondary services heat exchangers.
i I
2 4
F: Forced Reason:
Method Fxhibit G-Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data
,_g,,,,3 B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Auto Scram Event Report (LI:R) File tnt'RI r.
D Regulatory Restriction 4-continued 0161)
E-Operator Training & License E camination 5-Reduced Load 9-Other F-Administrative G Operational Error (Explain)
Exhibit I-Same Source (9/77)
H Other (Explain)
MONTHLY OPERATIONAL SUIS *.ARY STATD DG DOCKET NO. 50-302 UNIT F LC RP-3 DATE 9/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH August
SUMMARY
STATEMENT:
Crystal River 3 was on-line the entire month. Power was reduced for condenser salt leaks, secondary services heat exchanger cleaning, a minor control rod drive instrument problem, and the replacement of a circulating water pump bearing.
9 i
i i
e l
l I
t 1
-