ML20209J114

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1986
ML20209J114
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/1986
From: Graham D
FLORIDA POWER CORP.
To:
Shared Package
ML20209J107 List:
References
NUDOCS 8609160159
Download: ML20209J114 (5)


Text

r-

,--9

/ i .

O OPER AllNG DkT A REPOH1 DOC Al1 NO. 50-302 DATE 9/3/86 COMPLET LD 14Y TL Grnham 1 ELLi'llONE (904) 795-3802 OPERATING STATUS Crystal River Unit 3 h 0 '"

1. Unit Name:
2. Reporting Period: 8/1/86 - 8/31/86 2544 .
3. Licensed Thermal Power (MWI):
4. Nameplate Rating (Gross MWe): 890 S. Design Electrical Rating (Net MWe): 825 860 '
6. Maximum Dependable Capacity (Gross MWe):

821 i

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Iast Report. Give Reasons:

NA

9. Power level To Which Restricted,lf Any (Net MWe):

NA

10. Reasons For Restrictions,if Any: NA v

This Month Yr. to Date Cumulatise

11. Hours In Reporting Period 744 5831 83015
12. Number Of Hours Reactor Was Critical 744 1777.9 52078.9 1
13. Reactor Rescne Shutdown Hour, 0 0 1280.3
14. Hours Generator On-Line 744 1757.2 50848 0 0 0
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1767095 4191629 114660494 .
17. Gross Electrical Energy Generated (MWH) 611278 _ _, 1448549 39204851
18. Net Electrical Energy Generated (MWH) 581370 1377512 37237098
19. Unit Senice Factor 10006 30.196 61.3 %

_20. Unit Availability Factor 10006 30.196 61.396 l

21. Unit Capacity Factor (Using MDC Net) 95.296 28.896 56.296 l
22. Unit Capacity Factor (Using DER Net) 94.7?6 28.696 54.4 %

l 69.9 6 23.8 %

23. Unit Forced Outage Rate 0%

l

! 24. Shutdowns Scheduled Oser Next 6 Monthk (Type. Date.and Duration of Each):

NA l 25. If Shut Down At End Of Report Period. Estimated Date of Startup:

I 26. Units In Test Status (Prior to Commercial Operation). Forecast Achiesed

! t/ INITI A L CRil'lCA LITY I/I4/77

  • INITI AL ELECTRICITY I/30/77 COMMERCI AL OPER ATION 3/13/77 8609160159 860911 PDR ADOCK 05000302 PDR R (qf77;

AVI R AGL l> Alti l Nil Pow't.R Li \ 11 DOC KET NO. 50-302 UNil FLCRP-3 DATE 9/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (Mwe. Net)

I 707 7 822 2

OII 18 826 3 713 19 812 4 795 20 827 5 825 21 810 6

851 815 22 7 788 23 828 8

772 24 831 9 626 25 796 605 805 10 26 II 813 27 823 826 651 12 28 l3 823 814 29 823 818 34 30 790 826 15 31 l 754 '

l 16 INSTRUC110NS On this format list the average daily unit power leselin MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.

I e (9 /77 )

l l

l

W 50-302 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME F LCR P-3 DATE n!2/RR COMPLETED BY R. A . Rtowart-REPORT MONTH 8/86 TELEPif0NE (ona) v ns-3802-c

- EO 3 -"E9 Licensee E, Eg Cause & Corrective No. Date k H

j!

yE $

i 3$d 3gc Event Report #

h rn U o Attnin to Present Recurrence

<.  ! v c5 86-05 8G0801 F 0.0 A 5 NA IIC IITEXCII Reduced power to locate and repair a condenser salt leak in the "C" waterbox.

86-06 860801 S 0.0 B 5 NA IIF llTEXCil Operated at reduced power to remove loose barnacles from both secondary services heat exchangers.

86-07 860802 F 0.0 A 5 NA IE CRDRVE Received high control rod drive stator i

temperature alarm. An instrument problem was corrected.

86-08 860803 F 0.0 A 5 NA IIC IITEXCII Reduced power to locate and repair a condenser salt leak in the "A" waterbox.

86-09 860808 -F 0.0 F 5 NA IIF PUB 1PXX Circulating water pump IC had a shaft bearing replaced.

(Continued on next page.).

I 2 '.h 4 F: Forced Reason: Method Exhibit G . Instrutnons S: Scheduled A Equipment Failure (Explain) for Preparation of Data B Maintenance of Test N*[{Ser., Entry Sheets for Licensee C Refueling 3-Auto Scram Event Report (Li'RI File (Nt'RI r.

D Regulatory Restriction 4-Continued 0161)

^ E Operator Training & License Exarnination 5-Reduced Load 9-Other F Administrative $

G-Operational Error (Explain) Exhibit I - Same Source 03/77) 11-Other (Explain)

  • DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME F LC R P-3 DATE 9/3/86 COMPLETED BY S. A. Stownrt REPORT MONTH 8/86 TELEPHONE (904) 79r-3 Rn2 i

i

,$g 3 E Licensee {g Cause & Corrective Action to No. Date R Eg 4 .2 s 5 Event g'ir k'.8 uhO H E 3 ;yj e Report # in U Present Recurrence f -  !

6 86-10 860815 F 0.0 A 5 NA ZZ ZZZZZZ Excess sea grass caused the shear pin of Amertap filters to break. Reduced power to replace.

86-11 860828 F 0.0 F 5 NA IIC IITEXCII Reduced power to repair condenser salt

' leaks and clean secondary services heat exchangers.

i I 2 '$ 4 F: Forced Reason: Method Fxhibit G-Instructions S: Scheduled A Equipment Failure (Explain) ,_g,,,,3 for Preparation of Data B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Auto Scram Event Report (LI:R) File tnt'RI r.

D Regulatory Restriction 4-continued 0161)

E-Operator Training & License E camination 5-Reduced Load 9-Other F-Administrative $

G Operational Error (Explain) Exhibit I- Same Source (9/77) H Other (Explain)

MONTHLY OPERATIONAL SUIS *.ARY STATD DG DOCKET NO. 50-302 UNIT F LC RP-3 DATE 9/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH August

SUMMARY

STATEMENT:

Crystal River 3 was on-line the entire month. Power was reduced for condenser salt leaks, secondary services heat exchanger cleaning, a minor control rod drive instrument problem, and the replacement of a circulating water pump bearing.

9 i

i i

e l

l I

t 1

. - - . _ - , _-