ML20209J148
| ML20209J148 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/29/1987 |
| From: | Jabbour K Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20209J149 | List: |
| References | |
| NUDOCS 8702060222 | |
| Download: ML20209J148 (7) | |
Text
.
[#
UNITED STATES
- t NUCLEAR REGULATORY COMMISSION j
WASHINGTON, D. C. 20555 DUKE POWER COMPANY NORTH CAROLINA ELECTRIC MEMBERSHTP CORPORATION SALUDA RIVER ELECTRTC COOPERATIVE, INC.
DOCKET NO. 50-413 CATAWPA NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 21 License No. NPF-35 1.
The Nuclear Regulatory Comission (the Comission1 has found that:
A.
The application for amendment to the Catawba Nuclear Station, Unit 1 (the facility) Facility Operating License No. NPF-35 filed by the Duke Power Company acting for itself, North Carolina Electric Membership Corporation and Saluda River Electric Cooperative, Inc.,
(the licensees) dated April 9, 1986, and supplemented June 5 and September 2,1986, complies with the.tandards.and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's l
regulations as set forth in 10 CFR Chapter I; l
B.
The facility will operate in confomity with the application, as I
amended, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in conpliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
8702060222 870129 PDR ADOCK 05000413 P
. 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-35 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.21, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the license. Duke Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE flVCLEAR REGULATORY COMMISSION Kahtan Jabbour, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A
Attachment:
Technical Specification Changes Date of Issuance: January 29, 1987
]) { '1
/
fth PW8#hPWR-A OGG/8ETH PWR.4NPWR-A PWRf4/DPWR-A 4
KJabbour/ rad NDuWean
- v/tMcN BJYbuniblood 01/g0/87 01//[./87 01/j,/87 01/py87 At'l
r
[/
UNITED STATES
' '?,
NUCLEAR REGULATORY COMMISSION
.g WASHINGTON, D. C. 20555 DUKE DOWER COMPANY NORTH CAROLINA MUNICIPAL POWER AGENCY NO. 1 PIEDMOMT MUNICTPAL POWER AGENCY DOCKET NO. 50-414 CATAWBA NUCLEAP STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.11 License No. NPF-52 1.
The Nuclear Regulatory Comission (the Commission) has found that:
A.
The application for amendment to the Catawba Nuclear Station, Unit 2 (the facility) Facility Operating License No. NPF-52 filed by the Duke Power Company acting for itself, North Carolina Municipal Power Agency No. I and Piedmont: Municipal Power Agency (the licensees) dated April 9, 1986, and supplemented June 5 and September 2, 1986, complies with the standards and reauirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations as set forth in 10 CFR Chapter I; j
B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of l
the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the bealth and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common I
defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
. 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-52 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.11, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the ifcense. Duke Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION N
Kahtan Jabbour, Project Manager PWR Project Directorate #4 Division of PWR Licensino-A
Attachment:
Technical Specification Changes Date of Issuance: January 29, 1987 flN 0
PWR#4/DPWR-A PWRQf?PWR-A OGC/BETH PW DPlfR-A i
KJabbour/ rad AD6'ncan S h+ '"
BJ qW ood 01/g;/87 01///c/87 0,1/n /87 01/g87 A"\\
r 4
_. - _ _ _, _. - - _ - _ - _ _ - _ _ _ -. =,..
ATTACHMENT TO LICENSE AMENDMENT NO. 21 FACILITY OPERATING LICENSE NO. NPF-35 DOCKET NO. 50-413 AND TO LICENSF AMENDMENT NO. 11 FACILITY OPERATING LICENSE NO. NPF-52 DOCKET NO. 50-414 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change. The corresponding over-leaf page is also provided to maintain document completeness.
Amended Overleaf Paae Page 3/4 3-53 3/4 3-54 9
TABLE 3.3-6 (Continued)
TABLE NOTATIONS With fuel in the fuel storage pool areas.
With irradiated fuel in the fuel storage pool areas.
When venting or purging from containment to the atmosphere, the trip set-point shall not exceed the equivalent limits of Specification 3.11.2.1 in accordance with the methodology and parameters in the ODCM. When not vent-ing or purging in Modes 5 or 6, the alarm setpoint concentration (pCi/ml) shall be such that the actual submersion dose rate would not exceed SmR/hr without alarm. When not venting or purging in Modes 1 through 4 the alarm setpoint shall be no more than 3 times the containment atmosphere activity as indicated by the radiation monitor.
ACTION STATEMENTS ACTION 30 - With less than the Minimum Channels OPERABLE requirement, operation may continue provided the containment purge and exhaust valves are maintained closed.
ACTION 31 - With the number of operable channels one less than the Minimum Channels OPERABLE requirement, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolate the affected Control Room Ventilation System intake from outside air with flow through the HEPA filters and carbon adsorbers.
ACTION 32 - With less thah the' Minimum Channels OPERABLE requirement, opera-tion may continue for up to 30 days provided an appropriate portable continuous monitor with the same-Alarm Setpoint is provided in the fuel storage pool area.
Restore the inoperable monitors to OPERABLE status within 30 days or suspend all operations involving fuel movement in the fuel building.
ACTION 33 - Must satisfy the ACTION requirement for Specification 3.4.6.1.
ACTION 34 - With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, operation may continue provided the Fuel Handling Ventilation Exhaust System is operating and discharging through the HEPA filters and carbon adsorbers.
Otherwise, suspend all operations involving fuel movement in the fuel building.
ACTION 35 - With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, operation may continue provided the Auxiliary l
Building Filtered Exhaust System is operating and discharging through the HEPA filter and carbon adsorbers.
ACTION 36 - With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, operation may continue for up to 30 days t
l provided that, at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, grab samples are collected and analyzed for radioactivity (gross gamma) at a lower limit of detection of no more than 10 7 pCi/ml.
CATAWBA - UNITS 1 & 2 3/4 3-53 Amendment No. 21 (Unit 1)
Amendment No.11 (Unit 2)
TABLE 4.3-3 '
h RADIATION MONITORING INSTRUMENTATION FOR PLANT 5
OPERATIONS SURVEILLANCE REQUIREMENTS 2-ANALOG E
CHANNEL MODES FOR WHICH Z
CHANNEL CHANNEL OPERATIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST IS REQUIRED w
e.
1.
Containment a.
Containment Atmosphere - High Gaseous Radioactivity (Low Range - EMF-39)
S R
M All b.
R H
1,2,3,4 Leakage Detection (Low Range - EMF-38 and Low Range - EMF-39) 2.
Fuel Storage Pool Areas J.
a.
High Gaseous Radioactivity S
R M
(Low Range - EMF-42) b.
Criticality-Radiation Level S R
H (Fuel Bridge - Low Range -
IEMF-15, 2 EMF-4) 3.
Control Room Air Intake Radiation Level -
S R
H All High Gaseous Radioactivity -
(Low Range - EMF-43 A & B) 4.
Auxiliary Building Ventilation High Gaseous Radioactivity S
R M
1,2,3,4 (Low Range - EMF-41, 5.
Component Cooling Water System S
R H
All (EMF-46 A&B)
TABLE NOTATIONS
- With fuel in the fuel storage pool area.
- With irradiated fuel in the fuel storage pool areas.
.r y