Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209J054 + (ML20209J054)
- ML20209J055 + (ML20209J055)
- ML20209J056 + (ML20209J056)
- ML20209J057 + (ML20209J057)
- ML20209J060 + (ML20209J060)
- ST-HL-AE-1506, Third Interim Deficiency Rept Re Magnetics QA Program. Initially Reported on 850320.Magnetics Completed Walkdown to Evaluate Accessible Welds of All Installed Panels.Next Rept Will Be Submitted by 851231 + (ML20209J062)
- AECM-86-0278, Monthly Operating Rept for Aug 1986 + (ML20209J064)
- ML20209J065 + (ML20209J065)
- ML20209J066 + (ML20209J066)
- ML20209J067 + (ML20209J067)
- ML20209J068 + (ML20209J068)
- ML20209J071 + (ML20209J071)
- ML20209J073 + (ML20209J073)
- ML20209J075 + (ML20209J075)
- PNO-III-86-092, JC Haynes Pleaded Guilty to Charges of Making False Statement & Illegal Possession of Byproduct Matl Re Illegal Possession of Am-241.Haynes Will Make Restitution & No Longer Deal W/Nuclear Matls + (ML20209J076)
- ML20209J077 + (ML20209J077)
- ML20209J078 + (ML20209J078)
- ST-HL-AE-1479, Final Deficiency & Part 21 Rept Re Westinghouse Circuit Breakers in 125-volt Dc Distribution Switchboards Supplied by Hatch,Inc.Initially Reported on 851002.Insert Will Be Secured to Termination Plate + (ML20209J079)
- ML20209J080 + (ML20209J080)
- ML20209J081 + (ML20209J081)
- ML20209J082 + (ML20209J082)
- 05000237/LER-1986-019-04, :on 860811,while Reactor Operating at 91%,main Turbine Tripped on +55 Inches Reactor Water Level Which Resulted in Full Reactor Scram.Caused by Failure of Feedwater Regulating Valve a to Close + (ML20209J083)
- ML20209J087 + (ML20209J087)
- ML20209J089 + (ML20209J089)
- ML20209J090 + (ML20209J090)
- ML20209J094 + (ML20209J094)
- ML20209J096 + (ML20209J096)
- ML20209J097 + (ML20209J097)
- ML20209J098 + (ML20209J098)
- ML20209J102 + (ML20209J102)
- ML20209J104 + (ML20209J104)
- 3F0986-12, Forwards Monthly Operating Rept for Aug 1986.Corrected Monthly Operating Repts for Sept-Dec 1985 Due to Error in Values Also Encl + (ML20209J105)
- ML20209J108 + (ML20209J108)
- ML20209J109 + (ML20209J109)
- PNO-III-86-093, on 860904-06,patient Undergoing Brachytherapy Treatment w/Cs-137 Gynecological Implant Received Therapeutic Radiation Exposure of 8,015 Rads Rather than 6,255 Rads.Caused by Error in Loading Cs-137 Sources + (ML20209J110)
- ML20209J112 + (ML20209J112)
- ML20209J113 + (ML20209J113)
- ML20209J114 + (ML20209J114)
- ML20209J115 + (ML20209J115)
- ML20209J116 + (ML20209J116)
- ML20209J118 + (ML20209J118)
- 05000295/LER-1986-026, :on 860519,during Mod Overview Insp,Raychem Heat Shrink Style Environmentally Qualified Splices Found Incorrectly Installed.Caused by Inadequate Instructions from Mfg.Training Initiated + (ML20209J119)
- ML20209J122 + (ML20209J122)
- ML20209J123 + (ML20209J123)
- ML20209J125 + (ML20209J125)
- ML20209J128 + (ML20209J128)
- TXX-6408, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms.Initially Reported on 851220.Engineering,const & Quality Personnel Discussed Corrective Action.Comprehensive Plan Will Be Submitted.Next Rept by 870619 + (ML20209J130)
- IR 05000483/1986002 + (ML20209J131)
- ML20209J135 + (ML20209J135)
- ML20209J136 + (ML20209J136)
- ML20209J137 + (ML20209J137)