Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000528/LER-1987-010, :on 870325,while in Mode 1,discovered That Daily Chemistry Samples Not Taken on 870323 for Turbine Bldg & Condenser Area Sumps.Caused by Personnel Error.Briefing Sessions Held W/Workers.Sample Form Developed + (ML20209C573)
- ML20209C576 + (ML20209C576)
- ML20209C578 + (ML20209C578)
- ML20209C579 + (ML20209C579)
- ML20209C581 + (ML20209C581)
- ML20209C584 + (ML20209C584)
- ML20209C587 + (ML20209C587)
- IR 05000425/1987015 + (ML20209C590)
- ML20209C591 + (ML20209C591)
- ML20209C593 + (ML20209C593)
- ML20209C594 + (ML20209C594)
- ML20209C598 + (ML20209C598)
- ML20209C599 + (ML20209C599)
- ML20209C601 + (ML20209C601)
- ML20209C602 + (ML20209C602)
- ML20209C603 + (ML20209C603)
- ML20209C609 + (ML20209C609)
- ML20209C610 + (ML20209C610)
- ML20209C613 + (ML20209C613)
- ML20209C614 + (ML20209C614)
- ML20209C616 + (ML20209C616)
- ML20209C617 + (ML20209C617)
- ML20209C621 + (ML20209C621)
- ML20209C625 + (ML20209C625)
- ML20209C629 + (ML20209C629)
- ML20209C634 + (ML20209C634)
- ML20209C635 + (ML20209C635)
- 05000289/LER-1999-008, :on 990604,discovered That Air Flow Through Each of RB Fan Cooler Units Was Below Design Basis Requirement.Caused by Accumulation of Boric Acid from Rc Leakage.Normal Cooling Coils Have Been Cleaned + (ML20209C636)
- ML20209C637 + (ML20209C637)
- ML20209C638 + (ML20209C638)
- ML20209C640 + (ML20209C640)
- ML20209C643 + (ML20209C643)
- 05000395/LER-1999-009, :on 990604,plant Experienced Reactor Trip Due to Spurious High Flux Trip Signal in Power Range Nuclear Instrument Drawer N43.Defective Meter Was Replaced & Plant Was Returned to Svc on 990606.With + (ML20209C644)
- ML20209C647 + (ML20209C647)
- VPN-053-99, Forwards Rev 8 to Defueled Sar,Including Changes Since Last Submittal.Attachment Includes Brief Description of Each Change Included in Rev + (ML20209C648)
- ML20209C650 + (ML20209C650)
- ML20209C652 + (ML20209C652)
- ML20209C653 + (ML20209C653)
- ML20209C655 + (ML20209C655)
- ML20209C657 + (ML20209C657)
- ML20209C660 + (ML20209C660)
- ML20209C662 + (ML20209C662)
- TXX-6405, Interim Deficiency Rept CP-86-51 Re Hilti Anchor Bolts Which Do Not Meet Average Ultimate Tensile Loads in Certain Sizes as Published by Supplier.Initially Reported on 860717. Evaluation Continuing.Next Rept Expected by 870708 + (ML20209C663)
- ML20209C668 + (ML20209C668)
- ML20209C669 + (ML20209C669)
- NOC-AE-000557, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of App III,III-3410 for Second ISI Interval.Proposed Alternatives for Ultrasonic Exam of Piping Sys Welds,Attached + (ML20209C671)
- ML20209C672 + (ML20209C672)
- ML20209C674 + (ML20209C674)
- ML20209C675 + (ML20209C675)
- ML20209C676 + (ML20209C676)
- ML20209C678 + (ML20209C678)