Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207R231 + (ML20207R231)
- ML20207R232 + (ML20207R232)
- IA-87-131, Final Response to FOIA Request.No Agency Records Subj to Request Located + (ML20207R233)
- ML20207R233 + (ML20207R233)
- ML20207R234 + (ML20207R234)
- ML20207R236 + (ML20207R236)
- ML20207R240 + (ML20207R240)
- ML20207R241 + (ML20207R241)
- ML20207R244 + (ML20207R244)
- ML20207R249 + (ML20207R249)
- ML20207R250 + (ML20207R250)
- RBG-25452, Forwards Preliminary Rev 2 to Inservice Insp Plan, as Suppl to 870227 Initial Response to NRC 870121 Request for Addl Info.Complete Rev 2 Will Be Submitted by End of May 1987,following Update of Plan Apps + (ML20207R251)
- ML20207R253 + (ML20207R253)
- ML20207R256 + (ML20207R256)
- ML20207R262 + (ML20207R262)
- ML20207R263 + (ML20207R263)
- ML20207R265 + (ML20207R265)
- ML20207R266 + (ML20207R266)
- ML20207R267 + (ML20207R267)
- ML20207R268 + (ML20207R268)
- ML20207R270 + (ML20207R270)
- B12434, Opposes State of Me Petition for Rulemaking Re Emergency Planning.Proposals to Expand EPZs & to Require Emergency Planning Be Resolved Prior to Fuel Load Not Supported by Technical Analysis.Supports Ongoing Source Term Research + (ML20207R271)
- ML20207R277 + (ML20207R277)
- ML20207R278 + (ML20207R278)
- TXX-6321, Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary Bldg & Units 1 & 2 Containment Bldgs.Initially Reported on 860814.Validation Program Scheduled for Completion by 870601.Next Rept by 870708 + (ML20207R279)
- ML20207R280 + (ML20207R280)
- ML20207R282 + (ML20207R282)
- IA-87-102, Final Response to FOIA Request.App a Documents Encl & Available in PDR + (ML20207R283)
- ML20207R283 + (ML20207R283)
- ML20207R287 + (ML20207R287)
- ML20207R288 + (ML20207R288)
- ML20207R290 + (ML20207R290)
- ML20207R291 + (ML20207R291)
- ML20207R292 + (ML20207R292)
- IR 05000312/1986041 + (ML20207R295)
- IR 05000263/1986008 + (ML20207R296)
- ML20207R297 + (ML20207R297)
- ML20207R307 + (ML20207R307)
- TXX-6330, Final Deficiency Rept CP-86-65 Re Unconsolidated Concrete in Exterior Wall of Reactor Containment Bldg.Initially Reported on 861015.Unconsolidated Concrete Repaired Per Established Site Procedures.Condition Not Reportable Per 10CFR50.55(e) + (ML20207R308)
- ML20207R311 + (ML20207R311)
- ML20207R313 + (ML20207R313)
- ML20207R317 + (ML20207R317)
- ML20207R320 + (ML20207R320)
- TXX-6318, Interim Deficiency Rept CP-86-08 Re Stamps Used to Identify Super Hilti Kwik Bolts (Hkbs).Initially Reported on 860206. Three Cable Tray Supports Had Std HKBs When Design Drawing Required Super Hkbs.Next Rept Anticipated by 870722 + (ML20207R321)
- ML20207R325 + (ML20207R325)
- ML20207R328 + (ML20207R328)
- TXX-6337, Suppls Response to Deviation Noted in Insp Repts 50-445/86-03 & 50-446/86-02,per 870312 Commitment Re Item E.2 446/8602-D-11.Full Compliance Achieved on 870311 W/ Resolution of Dr I-S-HVDS-075-DR5 + (ML20207R330)
- ML20207R334 + (ML20207R334)
- ML20207R337 + (ML20207R337)
- 05000247/LER-1987-004, :on 870210,reactor Turbine Trip Occurred Due to Trip of Reactor Protection Train B.Caused by Personnel Error.Malfunctioning Breaker Cell Switch Subsequently Repaired + (ML20207R338)
- ML20207R342 + (ML20207R342)