CD&L Carolina Power & Light Company MAR 11 387 SERIAL: NLS-87-040 Mr.' Don MuHer/ Directora #
BWR Project Directorate #2 Division of BWR Licensing United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 BRUNSWICK LICENSING ISSUES
Dear Mr. Muller:
During the past year, I have been submitting to the Project Directorate, on a monthly basis, a list of outstanding licensing issues relating to Carolina Power & Light Company's H. B. Robinson Plant. This list is a prioritized summary of issues which are at the NRC for review and approval. This method has proven to be a valuable tool in prioritizing our needs. In fact, the system has worked so well that the Project Directorate has requested that i extend this practice to include our newly licensed Harris Plant.
Because of the success of this method, I have decided to undertake a similar effort for the Brunswick Plant. Accordingly, attached is Table I which is a.prioritized list of Brunswick licensing issues currently at the NRC for review and approval. It is my intention to revise and submit this list on a periodic basis, i
I hope this will prove to be a valuable tool in assisting you in allocating your resources.
Yours very truly, i
I S. R. Zimm rman l
Manager Nuclear Licensing Section l
l SRZ/RWS/kts (5138RWS)
Enclosure r
i cc:
Dr. 3. Nelson Grace (NRC-RII)
Mr. W. H. Ruland (NRC-BNP)
Mr. E. Sylvester (NRC) of f
411 Fayettevsfle Street
- p. o. Box 1551
- Raleign. N C. 27602 c
- ~ r=w y C7A3170008 870311
,P,DR ADOCK 05000324 cm
i o.
g TABLE 1 BRUNSWICK LICENSING ACTION PRIORITY LIST APPROVAL CP&L DATE DATE
. PRIORITY.
LETTER TITLE SUBMITTED REQUESTED 1.
NLS-85-516 Diesel Generator TSC(b)(85TSB01) 06/28/85 3/31/87 2.
NLS-86-416(a)
Standby Liq. Control TSC (86TSB20) 12/02/86 4/13/87 3.
NLS-86-338 a)
Reload TSC (86TSB16) Unit 1 10/21/86 4/22/87 I
4.
NLS-86-337(a)-
D. C. Distribution TSC (86TSB14) 11/07/86 4/22/87 5.
NLS-86-440(a)
CAC-V172 Relocation TSC (86TSB21) 12/16/86 4/22/87 6.
NLS-86-081 Temp. Sensor Response Time TSC 11/13/86 4/22/87 (85TSB22) 7.
NLS-87-006 3.0.3/3.0.5 TSC (86TSB18) 3/2/87 ASAP 8.
NLS-85-374 Appendix 3 Exemption Request 10/25/85(c) 9.'
NLS-86-312 Containment Isolation Valve Stroke 10/08/86 7/3/87 Testing 10.
NLS-85-204 Reactor Material Surveillance TSC (85TSB18) 05/21/86 8/7/87 11.
NLS-35-193 Special Nuclear Material (84TSB17) 08/07/85 8/21/87 12.
NLS-85-189 Rod Block Monitor TSC (84TSB12) 09/25/85(c) 974jg7 l
13.
NLS-85-177 Mechanical Vac. Pump Testing---
TSC (85TSB15) -
11/25/85 9/18/87 14.
NLS-86-399 Second Interval ISI Program 11/10/86 15.
NLS-86-366 Second Interval IST Program 10/23/86 16.
NLS-86-388 Thermal Hydraulic Stability TSC 11/28/87 (85TSB28) i (a) Required for Unit Startup from Current Refueling Outage (b) TSC - Technical Specification Change Request (c) Awaiting additional information from CP&L (5138Rws/kts) k