ML20207R249

From kanterella
Jump to navigation Jump to search
Comments on Duke Power Corp Findings & Recommendations. HVAC Contractor Referred to in Response Should Be Identified
ML20207R249
Person / Time
Site: Fermi 
Issue date: 11/07/1984
From: Byron P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Agosti F
DETROIT EDISON CO.
Shared Package
ML20207R242 List:
References
FOIA-87-13 NUDOCS 8703170021
Download: ML20207R249 (1)


Text

I

,7jpw <.vq[o,,_

UNITED STATES NUCLEAR REGULATORY COMMISSION 3

o REllON 111 o, * $

'[

799 ROOSCVELT ROAD b

o GLEN ELLYN,ILLINolS 60137 ese*

November 7,1984 MEMORANDUM FOR:

F. E. Agosti, Manager Nuclear Operations FROM:

P. M. Byron, SRI, Ferni 2

SUBJECT:

DUKE POWER FINDINGST.tECOMMENDATIOMS 3.2.2.a The liVAC contractor, Robert Irsay, demobilized during June 1981. Bechtel completed the HVAC work under the direction of the System Completion Organization (SCO).

Who is the contractor referred to in the response.

If it is Irsay, it would indicate there may be document control problems.

3.16.2.a - QA has had a housekeeping program in place in excess of a years in addition, SCO had their own program. The discussion did not address these programs. What assurance is there that the new programs will be any more effective than those which were in place?

P. M. Byron Senior Resident Inspector PMB:mak g/teha l c ~ -n m j, b'

  • M 5"P """ ' '

d%

O e// -

c.

s_

P/

fo2n /3 Bh 8703170021 870312 PDR FOIA LAMS 7-13 PDR