Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206M985 + (ML20206M985)
- ML20206M986 + (ML20206M986)
- ML20206M987 + (ML20206M987)
- IR 05000443/1986041 + (ML20206M988)
- ML20206M989 + (ML20206M989)
- 05000321/LER-1999-001-04, :on 990412,loss of Scram Valve Air Header Air Pressure & RPS Actuation Were Noted.Caused by Drawing Error. Revised Drawings to Show That Valve 1P52-F501 Provides Air to Scram Valve Air Header.With + (ML20206M990)
- ML20206M991 + (ML20206M991)
- ML20206M992 + (ML20206M992)
- 05000423/LER-1986-042, :on 860725,Train a Safety Injection Actuation Occurred.Caused by Intermittent Resetting of Pressurizer Low Pressure Safety Injection Block.Switch Panel Lugs Adjusted + (ML20206M994)
- ML20206M995 + (ML20206M995)
- IR 05000277/1999002 + (ML20206M997)
- ML20206M998 + (ML20206M998)
- ML20206M999 + (ML20206M999)
- ML20206N000 + (ML20206N000)
- IR 05000289/1986011 + (ML20206N003)
- ML20206N006 + (ML20206N006)
- 05000424/LER-1998-006-03, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements + (ML20206N007)
- 05000315/LER-1986-012-01, :on 860528,during Mode 1,turbine Trip/Reactor Trip Occurred Due to Apparent Overspeed of Main Turbine. Cause Unknown.Trip Deemed Spurious Event.Frequency to Voltage Converter & Comparator Replaced + (ML20206N008)
- ML20206N010 + (ML20206N010)
- ML20206N011 + (ML20206N011)
- ML20206N017 + (ML20206N017)
- ML20206N018 + (ML20206N018)
- ML20206N019 + (ML20206N019)
- ML20206N022 + (ML20206N022)
- ML20206N023 + (ML20206N023)
- ML20206N024 + (ML20206N024)
- ML20206N025 + (ML20206N025)
- ML20206N026 + (ML20206N026)
- ML20206N028 + (ML20206N028)
- ML20206N029 + (ML20206N029)
- ML20206N031 + (ML20206N031)
- 0CAN088601, Responds to 860707 Transmittal Re Deficiencies Identified During Emergency Response Facility Appraisal on 850520-24. Changes to Util Emergency Plan Implemented to Achieve NUREG- 0737 Staffing Time Goals for Emergency Operations Facility + (ML20206N033)
- ML20206N034 + (ML20206N034)
- 05000423/LER-1986-041, :on 860724,reactor Trip Occurred Due to lo-lo Level in Steam Generator D.Caused by Feedwater Isolation. Limit Switches Adjusted and Positioners Recalibr.Plant Mod Planned to Replace Existing Positioners + (ML20206N035)
- ML20206N036 + (ML20206N036)
- ML20206N037 + (ML20206N037)
- ML20206N038 + (ML20206N038)
- ML20206N039 + (ML20206N039)
- ML20206N042 + (ML20206N042)
- ML20206N044 + (ML20206N044)
- ML20206N046 + (ML20206N046)
- ML20206N047 + (ML20206N047)
- ML20206N048 + (ML20206N048)
- ML20206N052 + (ML20206N052)
- 05000316/LER-1986-024, :on 860718,ESF Actuation Occurred Due to hi-hi Steam Generator Level.Caused by Failed Amplifier in Feedwater Flow Transmitter.Plant Procedures Implemented. Investigation Continuing + (ML20206N053)
- ML20206N056 + (ML20206N056)
- ML20206N059 + (ML20206N059)
- ML20206N060 + (ML20206N060)
- ML20206N063 + (ML20206N063)
- IR 05000250/1988015 + (ML20206N065)
- ML20206N069 + (ML20206N069)