SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-277/99-02,50-278/99-02 AND 72-1027/99-02
'
Dear Mr. Rainey:
On April 5,1999, the NRC completed an inspection at the Peach Bottom Atomic Power Station.
~
The enclosed report presents the results of that inspection. We concluded that your staff
.
continued to operate both units safely and that your radiological controls program including the access controls, extemal and intemal exposure controls, radioactive matarial and contamination.
controls was effective.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room (PDR).
We appreciate your cooperation.
Sincerely, Original Signed By:
Curtis J. Cowgill, Chief Project Branch 4 1700IFO Division of Reactor Projects
.,
Docket Nos.: 50-277, 50 278,72-1027 License Nos.: DPR-44, DPR-56 Enclosure: NRC Inspection Report No. 50-277/99-02,50-278/99-02 and 72-1027/99-02 cc w/encls:
J. Hagan, Senior Vice Fiesident, Nuclear Operations -
,
J. Doering, Vice President, Peach Bottom Atomic Power Station M. Warner, Plant Manager, Peach Bottom Atomic Power Station l
G. D. Edwards, Chairma;,, Nuclear Review Board s R. Boyce, Director, Nuclear Quality Assurance -
l(
A. F. Kirby, lil, External Operations - Delmarva Power & Light Co.
A. A; Winter, Manager, Experience Assessment J. W; Durham, Sr., Senior Vice President and General Counsel-9905170100 990506-F i'
' $' j #
PDR ADOCK 05000277
.' p'
O PDR ~
s