Confirmatory Action Ltr CAL-RIII-86-05,confirming 860818 Telcon Re Senior Reactor Operators Removed from Duties Due to Irregularities in Assessment of Requalification Exams Administered During Wk of 860727
ML20206N022
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/19/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
References
CAL-RIII-86-05, CAL-RIII-86-5, NUDOCS 8608260062
Download: ML20206N022 (3)


Text

CONFIRMATORY ACTION LETTER RIII-CAL NO.86-005 AUG 101986 Docket No. 50-341 The Detroit Edison Company ATTN: Mr. B. R. Sylvia Group Vice President Nuclear Operations 6400 North Dixie Highway Newport, MI 48166 Gentlemen:

This Confirmatory Action Letter refers to our telephone conversation on August 18, 1986, concerning the results of the licensed reactor operator and senior reactor operator requalification examinations administered by the NRC at the Fermi 2 plant during the week of July 27, 1986.

The requalification examinations concluded that all twelve operators passed the written examination, five of eight SR0 candidates failed the simulator portion of the examination, and cne of eight SR0 candidates failed the oral portion of the examination. Notwithstanding, a number of irregularities existed with the assessment of the examinations, e.g., inconsistencies between written and simulator examination results; lack of agreement between NRC personnel on grading simulator examination results; and a two-week delay by the examiners in reaching a conclusion regarding failure of the simulator examination after informing superiors and the licensee that there were no significant problems identified. Based on these irregularities I have concluded that another set of requalificaion examinations should be administered by this office.

It is our intention to conduct these examinations during the week of August 25, 1986.

Until this matter is resolved, this letter confirms our understanding that the fiveseniorreactoroperatorswhoseperformanceissuspect(identifiedby their license nun.bers in the attachment) have been removed from licensed duties until the reexaminations have been administered by this office.

8608260062 860819 PDR ADOCK 05000341 V

PDR CONFIRMATORY ACTION LETTER RI!!-CAL N0.86-005 I

g N d[

CONFIRMATORY ACTION LETTER RIII-CAL NO.86-005 The Detroit Edison Company 2

AUG 101986 If your understanding of our discussion is different from that stated above, please inform this office promptly.

Sincerely, Origfaal s,lga,d by dans s. hepter James G. Keppler Regional Administrator

Attachment:

As stated cc w/ attachment:

F. E. Agosti, Vice President, Nuclear Operations l

J. E. Conen, Licensing Engineer 4

P. A. Marquardt, Corporate Legal Department DCS/RSB(RIDS)

Licensing Fee Managerrent Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Harry 11. Voight, Esq.

4 Nuclear Facilities and Environmental Monitoring Section Monroe County Office of Civil Preparedness l

L$

RIII RIII RIII RIII RIII RIII RIII 0

'sy cj&uhW f

Noref)s P[periello Davis Ke ler Trdick/mab

[fphl t

${q G go s /d 08/19/86 h

Tv J

CONFIRMATORY ACTION LETTER RIII-CAL N0.86-005

0>

e ATTACHMENT 50P-30189 SOP-30259 50P-30264 50P-30524 SOP-30269 s.

3 4

--