Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IA-97-386, Final Response to FOIA Request for Documents.Records Subj to Request Encl & Identified in App a + (ML20202B058)
- ML20202B058 + (ML20202B058)
- NUREG/CR-5499, Informs That Final Rept, Rates of Initiating Events at Us Nuclear Power Plants: 1987-1995, NUREG/CR-5499 Completed. Objective of Study,To Update Initiating Event Frequency Estimates Based on Operating Experience from Event Repts + (ML20202B059)
- ML20202B060 + (ML20202B060)
- ML20202B061 + (ML20202B061)
- ML20202B062 + (ML20202B062)
- ML20202B066 + (ML20202B066)
- ML20202B067 + (ML20202B067)
- ML20202B070 + (ML20202B070)
- ML20202B071 + (ML20202B071)
- A99001, Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments + (ML20202B073)
- ML20202B075 + (ML20202B075)
- ML20202B076 + (ML20202B076)
- ML20202B078 + (ML20202B078)
- A98010, Requests That Initial Operator License Exams Scheduled for Wks of 980209 & 16 Be Cancelled.Util Formally Withdraws All Individual License Applications Associated W/Exams + (ML20202B079)
- IA-97-396, Forwards NRC Year 2000 Status Rept as of 970815.Total of Seven mission-critical Systems Identified,Four of Which Require Repair & Three Require Replacement + (ML20202B084)
- ML20202B084 + (ML20202B084)
- ML20202B085 + (ML20202B085)
- ML20202B087 + (ML20202B087)
- ML20202B088 + (ML20202B088)
- ML20202B089 + (ML20202B089)
- LD-86-022, Forwards Proprietary Suppl 1,Rev 3 to CEN-39(A)-P & Nonproprietary Suppl 1,Rev 3 to CEN-39(A)-NP, CPC Protection Algorithm Software Change Procedure. Affidavit Encl.Proprietary Rept Withheld (Ref 10CFR2.790).Fee Paid + (ML20202B090)
- ML20202B092 + (ML20202B092)
- ML20202B093 + (ML20202B093)
- ML20202B094 + (ML20202B094)
- ML20202B095 + (ML20202B095)
- IA-97-443, Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR + (ML20202B098)
- ML20202B098 + (ML20202B098)
- ML20202B099 + (ML20202B099)
- ML20202B100 + (ML20202B100)
- ML20202B105 + (ML20202B105)
- ML20202B106 + (ML20202B106)
- ML20202B107 + (ML20202B107)
- B16978, Forwards Rev 5 to Millstone Unit 3 Operational Readiness Plan. Plan Covers Readiness for Restart,Startup & Power Ascension & long-term Operational Objectives + (ML20202B108)
- ML20202B109 + (ML20202B109)
- ML20202B111 + (ML20202B111)
- ML20202B112 + (ML20202B112)
- ML20202B113 + (ML20202B113)
- 05000334/LER-1997-043, :on 971231,inadequate Surveillance Testing of Solid State Protection Sys Resulted in Entry Into TS 3.0.3. Caused by Misinterpretation of TSs During Procedure Development.Test Specified Will Be Deleted + (ML20202B114)
- ML20202B116 + (ML20202B116)
- ML20202B117 + (ML20202B117)
- ML20202B118 + (ML20202B118)
- ML20202B119 + (ML20202B119)
- PNO-IV-97-071, on 971122,Troxler Model 3430A Gauge Was Stolen from Bed of Licensee Truck in Lakewood,Co.Chain Securing Case Containing Gauge to Truck Had Been Cut.Gauge Contained 9 Mci of C-137 & 44 Mci of Am-241.NMSS Notified + (ML20202B120)
- IR 05000483/1986017 + (ML20202B122)
- ML20202B123 + (ML20202B123)
- ML20202B125 + (ML20202B125)
- ML20202B128 + (ML20202B128)
- ML20202B129 + (ML20202B129)
- ML20202B130 + (ML20202B130)
- ML20202B131 + (ML20202B131)