Forwards Safety Insp Rept 50-483/86-17 on 860604-11. Violation Noted.Decision on Enforcement Action Re Violation Will Be Sent by Separate Correspondence
ML20202B099
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/02/1986
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20202B103 List:
References
NUDOCS 8607100200
Download: ML20202B099 (2)


See also: IR 05000483/1986017

Text

_ . . -. .

. OwO

.

JUL 0 21986

Docket No. 50-483

Union Electric Company

ATTN: Mr. Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, M0 63166

Gentlemen:

This refers to the special safety inspection conducted by Mr. B. H. Little

of this office on June 4 through 11, 1986, of activities at Callaway Plant,

Unit 1, authorized by NRC Operating License No. NPF-30 and to the discussion

of our findings with Mr. S. E. Miltenberger and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

'

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements.

We are releasing this report at this time for your information. An

Enforcement Conference will not be held per discussion between William L. Forney

of the NRC Region III staff and you; however, the NRC will evaluate the

information provided to Messrs. A. Bert Davis and Robert F. Warnick, during

their site visit June 10, 1986, to determine the appropriate enforcement action

to be taken. You will be notified by separate correspondence of our decision

regarding enforcement action based on the findings of this inspection. No

written response is required until you are notified of the proposed enforcement

action.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

k

gp%$3RDS$0h e

T #

'

O

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _

.. ..

.

.

Union Electric Company 2 JUL 0 2 886

We will gladly discuss any questions you have concerning this inspection.

Sincerely, 'l

ro;igital Signi .; " : :: ==M'

Charles E. Norelius, Director

Division of Reactor Projects

Enclosure: Inspection Report l

'

No. 50-483/86017(DRP)

cc w/ enclosure:

A. P. Neuhalfen, Manager Quality

Assurance

S. E. Miltenberger, General Manager,

Nuclear Operations

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Region IV

Resident Inspector, Wolf Creek

K. Drey

Chris R. Rogers, P.E.

Utility Division, Missouri

Public Service Commission

SNUPPS

I

l

l

1

RIII RIII RIII RII RIII RIW

d

pte'rch/jp

MM WM

Forney ,'yLittle

R

Warnick W4h

Tambling

M LJ

Nore iUs

>

C/3C/?b

._ _ - - - - - - - - - - - -