Text
'
,y
.a
=*
~~
^#-
Pubhc Service Electric and Gas '
company.
.Crrbin A. McNeill,Jr.
Pubhc Service Electric and Gas Company P.O. Bdx 236, HancockeBridge, NJ 08038 609 339-4800 Vice President Nuclea r,,,
o-J'u ne. 19, 1986.
=
U. S. Nucle'a'r Regulatory Commission
' :" Region I-631 Park Avenue
. King of' Prussia, PK 19406 e
Attention:*
Dr. Thomas E. Murley, Administrator c
Office of Inspection'and Enforcement
. Gentlemen:
'NRC INSPECTION REPORT #86-20
~
DOCKET'NO. 50-354
~
- HOPE CREEK GENERATING STATION
'. ~
-Public Service Electric'and Gas Company (PSE&G) is in receipt, of your letter' dated May 20, 1986, which transmitted a Notice of Violation concernin,g two.(2) failures to comply with Technical Specification requirements.
Pursuant *to the provisions 6f 10CFR2.201,'our. response to the Notice of Violation is pro.vided in Attachment 1.
e e
Sincerely, 3
sk' e
Attachment
. ~..
C Office of Inspection and Enforcement
. Division of Reactor Construction Inspection Washingtod, D.
C.
20555' NRC Resident Inspector P.
O.
Box 241 l
Hancocks Bridge, NJ 08038 l
1 l=
B607100198 860619 PDR ADOCK 05000354' i
l; G
g PDR' gs i
re e l ll' L
o
t Page 1 of 2'.
0 ATTACHMENT 1
.s
.g 10 CFR 2.201 INFORMATION.
N o.:
PUBLIC SERVICE ELECTRIC AND GAS' HOPE CREEK GENERATING STATION RESPONSE TO NOTICE-OF VIOLATION s,.
A.
Your 1.etter dated May 20, 1986 identified one violation-of T'echnical' Spec,ification 3.6 5 3 which rbquires that fivg3 o
Filt, ration, Recirculation and Ventilation System (FRVS) recirculation units and two ventilation units shall.be 6pera-
, ble during core;al'terations.
The FRVS' controls were'found in the locked out position, thereby disabling;all automatic
' start functions.
~
1.
PUBLIC SERVIC'E ELECTRIC AND GAS DOES NOT DISPUTE THE.'
o
, VIOLATION.
2.
THE ROOT CAUSE OF.THE VIOLATION WAS PERSONNEL ERRORON THE PART OF THE* CONTROL ROOM OPERATOR IN FAILING TO t
REALIZE THAT THE'TRVS'WAS TECHNICALLY INOPERABLE *WITH*
- ', THE CONTROLS LOCKED'OUT AND IN FAILING TO RE' STORE THE
. FRVS (*0NTROLS TO THE. AUTOMATIC MODE TO SUPPORT CORE ALTERATION A.CTIVITIES.
S 3.
IMMED ATE CORRECTIVE, ACTIONS:
g C
a)
The FRVS recirculation anci ventilation corntrols wei e
- immediately placed'in the automat,ic mode.
.y.
b) dn April 16',
1986, all shift supervisors w.ere advised of this v.iolation and instructed to keep the.FRVS contro1s on automatic.
4.
LONG' TERM' CORRECTIVE AC' CIONS:
-a)
Prior *.to fuel loading, the FRVS controls"had been locked out as an acceptable m,bthod of protecting the FRVS charcoal beds from vapors, generated by
~
- painting activities in the Reactor Building.
In the' future, this will be accomplished by maintaining.
the Reactor Building Ventilatioh System (REVS) in the.hormal or refuel modes.
b).
To raise the Control hoom Operator's awareness of FRVS operability, the statiuq of *each FRVS recircu
~ 1ation and ventilatiory unit has. been added to the Control' Room console check'llst 'used at shift turnover
( OP-AP. Z E-l&7Q )'.
- s
'c-)
On Jurie 16, 1986, a copy of this response and the applicable pages from Inspection Report #86-20 wer,e put in the Eope Creek Operations Required, Reading Book to be read by all licensed operators.
1986.
5.
FULL COMPLIANCE WAS ACH.IEVED ON JUNE 16, s
g e
W Q
f
e.
'.t Page 2 of 2.
y e
tA e
B.
' Failure to veri ~fy'that the Standby Liquid Contr'ol (SBLC).
System is operable in mode 5. when.any' coritrol rod is moved.
1.
PUBLIC SERVICE ELECTRIC AND GAS' DdES NOT DISPUTE THE VIOLATION.
.s 2s THE ROOT.CAUSE,OF THE VIOLATION WAS A. PROCEDURAI9 IMADEQUACY IN.THAT.OP-DL.ZZ-026(Q)'DID NOT, PROVIDE SUFFICIENT INSTRUCTIONS.-
3.
-I'MMEDIATE CORREC.TIVE ACTIONS:
On April 24, 1986, all shift supervisors wefe instructed th'at for a given plant condition, all required ' surveillance
~
activities specified in the. log shall be performed even if the, surveilletnc*e activity is only required for a
^
special evolution within the plant condition.
4.
'LONG k'ERM CORRECTIVE. ACTIONSt e
p.
~
a)
On May 8, 1986, the Operat' ions Department s'urveillance log, OP-DL.ZZ'026(Q) was revised to reflecA.t,he
~
ihs'trdctions described in. item 3,' above.
b)
On Jyne 16, 1986, a copyrof this response and the applicable pag'es fr'om Inspection Report #.86-20 were
'put i,n the Hope Cr'eek ' Operations. Required Reading -
Book to be ' read by all 1,icensed opergtors.
5.
FULL COMPLIANCE WAS ACHIEVED ON JONE 16, 1986.