Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199D838 + (ML20199D838)
- ML20199D841 + (ML20199D841)
- L-98-012, Informs That Reevaluation of Avlis Licensing Schedule Mentioned in ,Has Been Completed.Revised Schedule, Including pre-application Submittals Are Contained in Encl + (ML20199D842)
- ML20199D843 + (ML20199D843)
- ML20199D844 + (ML20199D844)
- 05000266/LER-1997-039, Forwards LER 97-039-00 Re RHR Loop Inoperable,Due to Inoperable CCW Pump.New Commitments within Rept Indicated in Italics + (ML20199D845)
- ML20199D846 + (ML20199D846)
- ML20199D847 + (ML20199D847)
- ML20199D848 + (ML20199D848)
- LIC-99-0002, Forwards Response to RAI Re GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps + (ML20199D850)
- ML20199D852 + (ML20199D852)
- ML20199D854 + (ML20199D854)
- ML20199D855 + (ML20199D855)
- 05000220/LER-1986-012, :on 860516,both Fire Pumps Taken Out of Svc to Allow Diver to Work in Station Svc Water Intake Tunnel. Telephone Notification to Region I Not Made Until 860517. Personnel Counseled + (ML20199D856)
- IR 05000275/1986011 + (ML20199D858)
- ML20199D860 + (ML20199D860)
- ML20199D861 + (ML20199D861)
- ML20199D862 + (ML20199D862)
- ML20199D863 + (ML20199D863)
- ML20199D865 + (ML20199D865)
- DCL-86-162, Responds to NRC Re Violations Noted in Insp Repts 50-275/86-11 & 50-323/86-12.Corrective Actions:Program for Calibr Methodology Re Use of Flow Rate Measuring Device as Monitor Will Be Completed by 860731 + (ML20199D866)
- ML20199D868 + (ML20199D868)
- 05000266/LER-1997-039-01, :on 970615,RHR Loop Inoperable.Caused by Removal of CCW Pump from Svc.Ccw Pump Restored + (ML20199D870)
- ML20199D871 + (ML20199D871)
- ML20199D872 + (ML20199D872)
- 05000298/LER-1997-019, :on 971222,incorrect Mind Set & Scheduling Process Resulted in TS Violation.Caused by Failure of Shift Supervisor Support.Problem Identification Rept Associated W/ Event Will Be Presented as First Case Study + (ML20199D875)
- ML20199D876 + (ML20199D876)
- ML20199D877 + (ML20199D877)
- ML20199D878 + (ML20199D878)
- ML20199D879 + (ML20199D879)
- ML20199D880 + (ML20199D880)
- ML20199D881 + (ML20199D881)
- 0CAN068605, Forwards Endorsements 20 & 66 to Nelia Policies NS-381 & NF-210,respectively & Endorsement 56 to Maelu Policy MF-74 + (ML20199D883)
- ML20199D884 + (ML20199D884)
- ML20199D887 + (ML20199D887)
- ML20199D888 + (ML20199D888)
- ML20199D892 + (ML20199D892)
- ML20199D895 + (ML20199D895)
- NOC-AE-000075, Forwards Change Q-034 to Operations QA Plan Provided to NRC on 970522,incorporating Organizational Items Resulting from Transition to STP Nuclear Operating Co.Final Complete Copy of QA Plan for Implementation of Graded QA Activities En + (ML20199D896)
- ST-HL-AE-1684, Forwards marked-up Changes to FSAR Section 3.5 & Responses to NRC Questions Re Results of Internal Missile Analysis/ Evaluations,Per SER (NUREG-0781) Open Item 2 + (ML20199D898)
- B16607, Notifies NRC Staff of Condition in Outer Annulus Region of Unit 3 Containment,Deviating from Technical Position (BTP) Cmeb 9.5-1 Section C.5.b & C.7a + (ML20199D899)
- ML20199D902 + (ML20199D902)
- TXX-4852, Forwards Description of 860601 Amend 59 to FSAR + (ML20199D903)
- ML20199D904 + (ML20199D904)
- ML20199D906 + (ML20199D906)
- ML20199D907 + (ML20199D907)
- ML20199D908 + (ML20199D908)
- ML20199D909 + (ML20199D909)
- ML20199D911 + (ML20199D911)
- ML20199D913 + (ML20199D913)
- ML20199D914 + (ML20199D914)