MILLSTONE UNIT 3 INDEPENDENT CORRECTIVE-ACTION VERIFICATION PROGRAM STATUS REPORT JANUARY 23,1998 g
-}-.
Project Milestone Schedule
- -Tier 1_ System Review Complete RSS Medifications & SWP/MOV Calcs 1/30/98 Tier 1 Corrective Action Review Docs + 2 weeks Tier 1 O&M Review 1/30/98 Tier 2 Review Complete 3.
Tier 3 Review Complete Final Report issue DR Resol + 3 weeks dh
.....-..y.
Tier 1 - System Review Status l
SWP - Complete
- QSS/RSS - Complete HVX Complete DGX - Complete i
1 a
1 I
d$
M Tier 1 - RSS/SWP/MOV Neview Status item Total (NR)
Como.
Rem.
MOV Caks 13 13 0
SWP Calca 6
6 0
RSS Modifications
- Mod Screening 8
8 0
- Mod checidists 93 45 48
- Mech cales 31(2) 14 17
- lac calcr.
2 2
0
- Electrical cales 4
4 0
- Structuralcales 6
5 1
- Vent & Drain Stress cales 4
3 1
- Fluid transient cales 2
1 1
- Nozzle load evaluations 4
4 0
- Small bore stress cales 9(3) 6 3
- Large bore stress cales 6(3) 3 3
- Expansion joint evaluations 3(1) 2 1
- Containment penetration cales 2
0 2
- Pipe support cales 25 25 0
I ;, HVAC cales 1
1
,< 0 SQ Evaluations / Reports 10 3
"""'[ * *~
' Conduit Support Calcs 5(1) 4
'1 2
Tier 1 - Configuration Review Status SWP - Complete
- QSS/RSS - Complete DGX - Complete HVX - Complete 4Y
~~
Tier 1 - ORG Review Status SWP - Remaining items
- Complete 2 mod reviews OSS/RSS - Remaining items
- Complete 2 mod reviews HVX - Remaining items
- Disposition 1 sytitem requirement DGX - Remaining items
- Complete 1 mod review m
A ih Y
3
Tier 1 - Programmatic Review Status Corrective Action Review
- Of the 1534 CA documents 9 UIRs remain awaiting NU disposition documents:
12,1009,1952,318,1126,1335 - Closure packages completed; in the mail per NU 1014,976,991 - Completion scheduled prior to Mo6s 2; not expected to be submitted to s&L prior to March Recommend last three UlRs be included in NRC Corrective r
Action inspection m et A
jg m;- -
Tier 1 - Programmatic Review Status Corrective Action implementation Review
- 1534 CA documents were screened to determine which ones would be reviewed for implementation
- 250 were selected
- NU has provided 105 closure packages
- NU is identifying those packages not scheduled for closure until Mode 2
- S&L review is approximately 25% complete DDR review complete 4
W N N"'
4
Tier 2 - Accident Review Status
=
Tier 2 is complete.
=
l
=
0
)$
db Tier 3 - PRG Review Status Current change process - Complete Past Change reviews - Complete Current change implementation - Complete NRC Sample of CA Documents - Complete
- w/ the exception of OIR 101, for which NU needs to submit disposition documentation 4
q m,-.
w.
Discrepancy Report Summary 998 Preliminary DRs initiated
' 867 Valid Preliminary DRs issued to NRC/NU/NEAC
- 112 Preliminary DRs considered invalid 19 Preliminary DRs in process 231 NU Resolutions entered into database
- 153 NU Resolutions reviewed by S&L
- 122 Ac.cepted and Closed
- 29 Not accepted - Retumed w/ Comments 2 Pending review of implementation of NU corrective action n gt d
A11
~ + ~ '
Discrepancy Report Summary Of the 122 Acceptable and Closed resolutions
- 55 Confirmed Discrepancies
- 35 Previously Identified by NU
- 32 Non-discrepant conditions Of the 55 Confirmed Discrepancies 1 Level 3 54 Level 4 Of the 2 Pending Discrepancies 2 Level 3 c-d 6
t Discrepancy Report Summary NRC Significance Level for the 867 Issued Preliminary DRs 0
Level 1 1
Level 2
- 290 Level 3 58 Responses 576 Level 4 172 Responses ae
/
JEl 7
Discrepancy Report Summary Issued NU Reso.
Close_d Tier 1 726 157 75 Tier 2 48 37 26 Tier 3 93 36 21 b
O W"*
7 1
l DR Type & Level Summary (Confirmed DRs)
D!screpancy Type Levei3 Level 4 a
Calculatiens 2
14 Component Data 0
2 Corrective Actions 1
4 Design Change Process 0
0 Drawings 0
9 Installation implemenmtation.
0 12 Installation Peglarements 0
2 Licensing Documents 0
8 O&M and Testing implementation 0
0 O&M and Testing ProctiJures 0
2 Procedure implementetion 0
0 3
Testing implementation C
1 Tes 0
0g g{ing Requirements
_7_
8
ki l
l l
l1 jlt lJ llIllJ 2M
=
-7 s
2M n
=
0 o
mi tu al
=
o 3M r
1 s
ge oR 6M
=
rU P N l
3 d
t nf e
o
=
3h t
0 c
o i
e niw p
t Uaie x
E v
=
ac e a
' 3h s
2 R
i nf R D
i arL t e&
6h i
- VS 1
s l
d
/
l w
n n i
e Moa v
e i
R t s s cn L
2h eAio S
t g
it elu n
i d
i vo l
n 6NE i s f.
it t e 2
k s
UcR e
e e
s e
W n
t rU o
9N
- j p
rN 1
s a o, e
R eCe d
p U
2N h
N u
1 t t s
r n s
=
s ei 5N Nds d
R e
nD u
e s
s y
2h i
pr 8
s ea R
n di D
nm p
l 2h 1
=
i I
le r
P 4h 1
7h 3M 1
2N
-4 I
i.
o o
y n
a y
0 0
n 0
0 0
o n
o n
e s
2 3
!ltl'