Comments on Augmented Investigation Team Draft Procedure for Response to Operational Events,Based on NRC Manual Chapter Re Incident Investigation Program
ML20199D855
Person / Time
Issue date: 03/18/1986
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20151L366 List:
References
NUDOCS 8603240389
Download: ML20199D855 (3)


Text

_ _ _ _ _ ,

I pocq h UNITED STATES

  • ((}

g \,"

3 (j

,',.E NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 e

g%, ;N'g# MAR 181986 MEMORANDUM FOR: James M. Taylor, Director Office of Inspection and Enforcement FROM: Harold R. Denton, Director Office of Nuclear Reactor Regulation

SUBJECT:

PROCEDURE FOR AUGMENTED IfGESTIGATION TEAM (AIT)

RESPONSE TO OPERATIONA' EVENTS In the latter part of December 1985 NRR provided corrents on the Program Plan for the development of the Incident Investigation Progran (a copy of which was sent to you). About the same time we received a copy of draf t procedures for the conduct of an AIT, which is a subset of the Incident Investigation Program (IIP).

Later, we became aware that an NRC Manual Chapter was being prepared to define more precisely the IIP. hcw that the draf t Manual Chapter is out for review, it appears that a significant revision of the AIT procedure nay be needed. NRR will provide additional Specific corrents en the AIT procedure when the next revision of the Draf t fianual Chapter is available.

We would like to offer the folicwing general corrents on the AIT procedure at this time.

1. We are concerned that the AIT-level of investigation r,ay be too formal and that it may even interfere with the course of the normal regulatory process. The formal AIT process should not inhibit the normal interactions between project nanagers or

, inspectors and licensees in following up on plant problems.

The process should recognize that informal contacts, including site visits, are encouraged for events below the AIT threshold.

2. Members of an AIT should be relieved of all other duties during the investigation so as to avoid either interference with the functioning of the AIT or an undue burden on the personnel involved, as was a concern during the AIT investigation of reactor trip breaker failures at the Cook plant.
3. Failed or malfunctioned equipment involved in the event should be preserved in an undisturbed state at least until it is determined that an IIT response is not necessary.

8603240389 860318

&oJ PDR ORG NRRC /},h

James M. Taylor 4 The AIT procedures should include adequate provisions for the possible upgrading of the effort to an IIT, as occurred at Rancho Seco.

5. We believe that a copy of the procedures for an AIT (while still under the control of IE) should be a part of the same document containing the procedures for an !!T. As a minimum, cross-references must be provided.

If you have any questions on our connents, the NRR technical contact for the IIP (including the AIT) is J. T. Beard (x24415).

/ w Harold R. Denton, Director Office of Nuclear Rcactor Regulation cc: J. Helteres H. Bailey W. Lanning

. 1 8 1996 James M. Taylor 4. The AIT procedures should include adequate provisions for the possible upgrading of the effort to an IIT, as occurred at Rancho Seco.

5. We believe that a copy of the procedures for an AIT (while still under the control of IE) should be a part of the same document containing the procedures for an IIT. ~As a minimum, cross-references must be provided.

If you have any questions on our coments, the NRR technical contact for the IIP (including the AIT) is J. T. Beard (x24415).

y;u utWM

{ p,R DenW Harold R. Denton, Director Office of Nuclear Reactor Regulation cc: J. Heltemes H. Bailey W. Lanning DISTRIBUTION YELLOW TICKET 859353

"' Central F11e pRw.,

NRC PDR wjw.

NSIC ORAS Rdg HDenton/DEisenhut TSpets FMiraglia WRussell HThompson RBernero EGreenman AChaffee PPAS DMossburg GHolahan RWessman JTBeard M ianaano ORPW  : D, Dh JTBeard:dm RWessman GHolahan DE ut HDe on 03//J/86 03/f3/86 03/g/86 03/ 86 03/f/86