Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P750 + (ML20198P750)
- ML20198P752 + (ML20198P752)
- ML20198P754 + (ML20198P754)
- ML20198P755 + (ML20198P755)
- ML20198P756 + (ML20198P756)
- ML20198P758 + (ML20198P758)
- ML20198P759 + (ML20198P759)
- 05000263/LER-1997-014, Forwards LER 97-014-00 Re Div II ADS Inhibit Switch Which Was Not Tested as Required by Ts.Commitment,Listed + (ML20198P760)
- ML20198P763 + (ML20198P763)
- 05000263/LER-1997-014-01, :on 971219,determined That Division II ADS Inhibit Switch Was Not Tested as Required by Ts.Caused by Cognitive Error by Revision Preparer & Reviewer of Surveillance Test.Temporary Change in Surveillance Test + (ML20198P764)
- ML20198P767 + (ML20198P767)
- ML20198P768 + (ML20198P768)
- ML20198P769 + (ML20198P769)
- ML20198P770 + (ML20198P770)
- ML20198P771 + (ML20198P771)
- ML20198P772 + (ML20198P772)
- ML20198P774 + (ML20198P774)
- ML20198P778 + (ML20198P778)
- ML20198P779 + (ML20198P779)
- L-97-056, Submits Special Rept Documenting Results of ISI of SG Tubes, Performed During Unit 1 Twelfth Refueling Outage on 971026. Number of Tubes Inspected & Breakdown of Tubes Removed from Svc for Each SG Documented in Table 1 + (ML20198P780)
- ML20198P781 + (ML20198P781)
- ML20198P782 + (ML20198P782)
- L-97-048, Confirms Completion of Requested Actions of GL 96-01. Actions Completed Prior to Completion of First Refueling Outage Following 970110 & Included Listed Instrumentation + (ML20198P783)
- L-97-051, Submits Special Rept Required to Document,Prior to Resumption of Plant Operation,Results of SG Tube Insps Which Fall Into TS Category C-3.RC-E-1B SG Was pre-designated as Generator Required to Be Sampled During 971017 Insp + (ML20198P785)
- ML20198P786 + (ML20198P786)
- ML20198P787 + (ML20198P787)
- ML20198P790 + (ML20198P790)
- ML20198P793 + (ML20198P793)
- ML20198P794 + (ML20198P794)
- ML20198P796 + (ML20198P796)
- 05000370/LER-1997-002-01, Forwards LER 97-002-01 Re Reactor Trip Which Occurred Due to RCP Motor Failure.Rev Submitted to Reflect Changes to Commitment W/Regard to Replacement of Unit 2B RCP Motor + (ML20198P797)
- ML20198P799 + (ML20198P799)
- ML20198P803 + (ML20198P803)
- ML20198P806 + (ML20198P806)
- ML20198P807 + (ML20198P807)
- ML20198P808 + (ML20198P808)
- ML20198P809 + (ML20198P809)
- ML20198P812 + (ML20198P812)
- ML20198P816 + (ML20198P816)
- ML20198P818 + (ML20198P818)
- ML20198P820 + (ML20198P820)
- ML20198P821 + (ML20198P821)
- RBG-44218, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/97-13 on 970720-0830.Corrective Actions:Control Panel Lineup Immediately Performed for Division 1 Dg,Shift Briefing Form Generated & Individuals Involved Counseled + (ML20198P822)
- PY-CEI-NRR-2253, Submits Supplemental Response to NOV EA-96-253.Util Accepts DOL Administrative Review Board Ruling as Further Clarification on Issue of What Does & Does Not Constitute Protected Activity Under Section 211 of ERA + (ML20198P823)
- ML20198P824 + (ML20198P824)
- ML20198P826 + (ML20198P826)
- ML20198P827 + (ML20198P827)
- ML20198P829 + (ML20198P829)
- ML20198P830 + (ML20198P830)
- NSD-NRC-97-5414, Forwards Responses to RAIs Re Comments on AP600 Normal Rhrs from Reactor Sys Branch on Rev 3 of AP600 Certified Design Matl,Including ITAAC as Requested in + (ML20198P833)
- ML20198P835 + (ML20198P835)