ML20198P750

From kanterella
Jump to navigation Jump to search
Notification of 980127 Meeting W/Util in Washington,Dc to Discuss GE TR on Design & Installation of ECCS Strainers in BWRs
ML20198P750
Person / Time
Issue date: 01/20/1998
From: Lynch M
NRC (Affiliation Not Assigned)
To: Capra R
NRC (Affiliation Not Assigned)
References
NUDOCS 9801220233
Download: ML20198P750 (3)


Text

l e

January 20, 1998 MEMORANDUM TO: Robert A. Capra, Director Project Directorate 1112 Division of Reactor Projects ill IV Office of Nuclear Reactor Regulation FROM:

M. David Lynch, Senior Project Manager Orig.

signed by Proj<ct Directorate 1112 Division of Reactor Projects ill IV Office of Nuclear Reactor Regulation SUt3 JECT:

FORTHCOMING MEETING WITH THE GENERAL ELECTRIC COMPANY (GE)

DATE & TIME:

Tuesciay, Jar vy 27,1998 9.00 a.m. to 5:00 p.m.

LOCATION:

General Electric Company Crotonville Room,11th floor 1299 Pennsylvania Avenue, NW Washington, DC 20004 PURPOSE:

To discuss GE's topical report on the design and installation of emergency core cooling syste.. JCCS) strainers in boiling water reactors.

PARTICIPANTS:*

URQ UTILITY C Berlinger, NRR J. Lynch J. dudrick, NRR J. Quirk et al A. L/Angelo, NRR R. Elliott, NRR D. Skay, NRR M. Marshall, RES A, Se:k'z, RES CONTACT: M. David Lynch, NRR (301) 415-3023

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to

Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94. However, this meeting and associated discussion relates to a process which is proprietary.

Therefore, certain portions of the meeting may not be open to the public. A non-proprietary summary of the meeting will be prepared and will be available upon request.

DOCilMENT NAME: G:\\CMNTSP\\ LYNCH \\0127MTG.NOT To RECENE A r&Y or THis DOCUMENT,IND6CATE IN THE box:"C"

  • COPY WITHouT ENCLOSURES *E" = COPY WITH I

ENCLOSURES %'

}((1 A

OFFICE JA)MS] % 3[

t D;PD32 8

,l NAME /bl[

bMbORb RCAPRA >

l' T DATE il 1(o /98 ilhO /98 1/ 2.0

/98 y

iJ # /O V"

p g y 3G b OFFICIAL RECORD COPY

,,_,j n h hhi D

98 a84 9

I y*

-t UNITE 3 STATES g

NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 3de86-4001 U,

S January 20, M*)8 MEMORANDUM TO: Robert A. Capra, Director Project Directorate 1112 Division of Roador Projects lil-IV Office of Nuclear Reactor Regulation FROM:

M. David Lynch, Senior Project Manag

  1. ^

Project Directorate ill 2 Division of Reactor Projects ill-IV Office of Nuclear React >r Regulation

SUBJECT:

FORTHCOMING MEETING WITH THE GENERAL ELECTRIC COMPANY (GE)

DATE & TIME:

Tuesday,i anuary 27,1998 9:00 a.m. to 5:00 p.m.

LOCATION:

General Electric Company Crotonville Room,11th floor 1299 Pennsylvania Avenue, NW Washington, DC 20004 PURPOSE:

To discuss GE's topical report on the design and installation of emergency core cooling system (ECCS) strainers in boiling water reactors.

PARTICIPANTS:*

11BQ UTILITY C. Berlinger, NRR J. Lynch J. Kudrick, NRR J. Quirk et al A. D'Angelo, NRR R. Elliott, NRR D. Skay, NRR M, Marshall, RES A. Serkiz, RES CONTACT:

M. David Lynch, NRR (301) 415 3023

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to Commission Policy Statement on Staff Meetings Open to the Public" 59 End. al Reaister v

48140,9/20/34. However, this meeting and associated discussion relates to a process which is proprietary. Therefore, certain portions of the meeting may not be open to the public. A non-proprietary summary of ths meeting will be prepared and will be available upon request.

b

.g I

Meetina Notice Tuesday, January 27,1998 -

E-Mail Hard Cooy S. Collins /F. Miraglia (SJC1/FJM)

'Osp6iWfBiEI

~

R. Zwnmerman (RPZ)

PUBLIC E. Adensam (EGA1)

PD# 3-2 r/f R. Capra (RAC1)

OGC,015818 G. Holahan (GMH)

ACRS, T2E26 M. D. Lynch (MDL)

C. Moore (ACM)

T. Martin (e mail to SLM3)

C. Berlinger (CHB) l J. Kudrick (JAK1)

A. D'Angelo (TXD)

R. Elliott (RBE)

D. Skay (DM86)

M. Marshall (MXM2)

A. Serkia (AWS)

OPA (e-mail to OPA)

C. Hohl (CWH)

J. Johnson (JRJ)

G. Grant (GEG)

T. Gwynn (TPG)

K. Perkins (KEP) l B. McCabe (BCM)

M. Tschiltz (MDT)

G. Tracy (GMT) i T. Hiltz (TGH)

D. Screnci (DPS)

K. ClaA (KMC2) l J, StrasmaiRJS2)

B. Henderson (BWH)

M. Hammond (MFH2) :

J PMNS (Meeting Announcement Coordinator) k 4

.)

.,. ~,

,,,. _.. _.,. -.. -. -.