Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P056 + (ML20198P056)
- ML20198P057 + (ML20198P057)
- B11567, Forwards NPDES Monthly Discharge Monitoring Rept for Sept 1997.Addl Samples Taken at NPDES Locations & Analyzed W/ Approved Methods Included in Table 2 & 3 + (ML20198P058)
- ML20198P060 + (ML20198P060)
- ML20198P061 + (ML20198P061)
- ML20198P063 + (ML20198P063)
- ML20198P065 + (ML20198P065)
- ML20198P067 + (ML20198P067)
- ML20198P069 + (ML20198P069)
- ML20198P070 + (ML20198P070)
- ML20198P071 + (ML20198P071)
- L-98-224, Requests NRC Approval of Existing Wording QA Description Included in Bvps,Unit 2 Ufsar.Wording Would Allow for Review of Procurement Documents for Matl & Equipment by Personnel in Nuclear Procurement Dept.Revised UFSAR Page,Encl + (ML20198P073)
- ML20198P074 + (ML20198P074)
- ML20198P076 + (ML20198P076)
- ML20198P077 + (ML20198P077)
- ML20198P079 + (ML20198P079)
- ML20198P080 + (ML20198P080)
- ML20198P081 + (ML20198P081)
- ML20198P083 + (ML20198P083)
- ML20198P086 + (ML20198P086)
- PY-CEI-NRR-2248, Forwards Sixth ISI Summary for Pnpp,Documenting ISI Exam Activities Conducted from Return to Commercial Operation from Fifth Refueling Outage Until Completion of Sixth Refueling Outage + (ML20198P088)
- IR 05000324/1986014 + (ML20198P089)
- ML20198P092 + (ML20198P092)
- ML20198P094 + (ML20198P094)
- ML20198P095 + (ML20198P095)
- ML20198P098 + (ML20198P098)
- ML20198P099 + (ML20198P099)
- IR 05000346/1997011 + (ML20198P101)
- 05000277/LER-1998-008-01, :on 981130,circuit Breaker SU-25 Tripped.Caused by Less than Adequate Procedural Guidance.Operators Verified Sys Integrity & Successfully Returned Sys to Svc.With + (ML20198P103)
- ML20198P105 + (ML20198P105)
- ML20198P107 + (ML20198P107)
- B16583, Monthly Operating Rept for Dec 1997 for Mnps,Unit 3 + (ML20198P108)
- ML20198P112 + (ML20198P112)
- IR 05000443/1986021 + (ML20198P114)
- ML20198P116 + (ML20198P116)
- ML20198P118 + (ML20198P118)
- ML20198P121 + (ML20198P121)
- ML20198P123 + (ML20198P123)
- IR 05000245/1997207 + (ML20198P126)
- ML20198P128 + (ML20198P128)
- CY-97-116, Informs That Rev 37 to Haddam Neck Plant Emergency Plan Has Been Implemented.Primary Purpose of Rev 37 Is Listed + (ML20198P129)
- ML20198P130 + (ML20198P130)
- ML20198P131 + (ML20198P131)
- PNO-I-97-068, on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities + (ML20198P132)
- ML20198P135 + (ML20198P135)
- PNO-IV-97-065, on 971105,reported to Ofc of State Programs That SPEC Model 150 Radiographic Exposure Device Containing 102-Ci Ir-192 Sealed Source Fell from Back of Licensee Truck on State Highway Between Empire & Belle Chase,La + (ML20198P136)
- ML20198P137 + (ML20198P137)
- ML20198P139 + (ML20198P139)
- ML20198P141 + (ML20198P141)
- A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 + (ML20198P145)
- ML20198P147 + (ML20198P147)