November 3, 1997
Mr. W T. Subalusky, Jr.
Site Vice President
LaSalle County Station
Commonwealth Edison Company
2601 North 21st Road
Marseilles,IL 61341
SUBJECT:
CLARIFICATION LETTER
Reference:
NRC Inspection Report 50-373/96011(DRS); 50-374/96011(DRS)
Dear Mr. Subatusky:
This will acknowledge receipt of your letter dated October 10,1997, regarding a
clarification of actions taken to address inspection requirements for the Lake Screen House
Inlet Bays, Service Water Tunnel, and CSCS Bypass Line as described in the referenced
report. We have reviewed these actions and have no further questions at this time.
Sincerely,
original signed by JM Jacobson/for
John A. Grobe, Director
Division of Reactor Safety
Docket No. 50-373
Docket No. 50-374
!
Enclosure:
W. T. Subalusky letter to NRC
dated October 10,1997
i
See Attached Distribution:
DOCUMENT NAME: G:DRS\\LAS96011.TY
To receive a cow of this document, Indicate in the box "C" = Copy w/o attach /end "E" = Cony wlattach/end *N" = No copy
OFFICE
Rill:DRS
\\ l t)
Rill:DRS
V Rlll:DRM
l
NAME
Duncan/lc (
LougheedW b Grobe N b
DATE
11/SI97
11/cy97
11/1/97 N
'
OFFICIAL RECORD COPY
9711'060262 971103
'
ADOCK 05000373
lllllllllj ll
G
ff -p I
1
--
.
.
.
_
.
.
E
W[ Subalusky .
2
November 3, 1997
cc w/o encli
R. J. Manning, Executive Vice President -
Gene *ation
M. Waliace, Senior Vice President,
Corrorate Services -
E. Kraft, Vice President, BWR Operations
Liaison Officer, NOC-BOD '
D. A. Sager, Vice President,
Generation Support
' D. Farrar. Nuclear Regulatory
Services Manager
1. Johnson, Licensing Operations Manager
Document Control Desk - Licensing
F. Dacimo, Plant General Manager
P, Bames, Regulatory Assurance Supervisor
cc w/ encl:
Richard Hubbard
- Nathan Schloss, Economist,
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
i
Distribution:
Docket File w/enct
SRI, LaSalle w/ enc!
R. A. Capra, NRR w/ encl
PUBLIC IE-01 w/enci
C. Pederson, Rlli w/enci
TSS w/enci
OCFO/LFARB w/enci
LPM, NRR w/ enc!
CAA1 w/ encl
DRP w/enci
A; B. Beach, Ritt w/enci
DOCDESK w/ enc!
DRS w/enct
J. L. Caldwell, Rlli w/enci
- Rlli PRR w/ encl
Rill Enf. Coordinator w/ encl
i
.l.
Lamrnianw cattli idm,n Gnupan)
s @
St%
1.a5Jile Generating Statkan
\\
2601 N'>rth list Road
N
,
.
Atarwillen IL 61.441 A)*5"
Tei m.45 .<, oi
I
l
October 10,1997
United States Nuclear Regulatory Commission
Attention: Document Control Desk
Washington, D.C. 20565
'
- Subject:
Clarification to System Operational Performance
Inspection (NRC Inspection Report
No. 50 373/96011(DRS); 50-374/96011(DRS))
LaSalle County Station, Units 1 and 2
Facility Operating License NPF-11 and NPF-18
NRC Docket Nos,50-373 and 50-374
Reference:
G. E. Grant letter to W. T. Subalusky, dated
November 15,1996, Transmitting NRC Inspection
Report 50-373/374-96011
The subject inspection Report, in Section M3.3.b. Observations and
Findinas, states that "The licensee ... clarified the procedure to specify a
~
maximum acceptable sedimentation height," and later, that "The licensee
combined surveillances LTS-600-19 and LTS-600-23 with LTS-1000-4, and
applied the surveillance requirement to the entire lake screen house, thereby
including de service water tunnel and resolving the issue."
During a review by Site Quality Verification, it was identified that the subject
,-
procedures were not changed. Due to the amount of time that has elapsed
since the Inspection, we were unable to determine the cause of the apparent
mis communication t'etween the inspector and our staff, however, the issue
. documented in the Inspection Roport will be resolved as indicated below:
A Technical Specification change has been submitted to revise
the inspection requirements for the Lake Screen House inlet
Bays, Service Water Tunnel and CSCS Bypass Line. The
procedures will be revised to implement the Technical
Specification change following approval, which is currently
.
anticipated in December 1997 (NTS# 373 200-96-00150.05A)
,
rI
\\ $ niOld) ( A SH)pJIM
l0l$ U
'
8-
_
_ __ _- _ _ _ ____ _
_ _ _ - -
h
't
y
. .-
.
LTS-600-19, LTS-600-23 and LTS 1000-4 will be combined
.
into a single survelilance procedure prior to Unit 1 restart
l
(NTS# 373-200-96-00150.05A)
If there are any questions or comments conceming this letter, please refer
them to Perry Bames, Regulatory Assurance Supervisor, at (815) 357-6761,
extension 2383.
Respectfully,
W. T. Subalusky
(
,
Site Vice President
LaSalle County Station
ec:
vA. B. Beach, NRC Region til Administrator
M. P. Huber, NRC Senior Resident inspector - LaSalle
D. M. Skay, Project Manager - NRR - LaSalle
.
6