Ack Receipt of Re Clarification of Actions Taken to Address Insp Requirements for Lake Screen House Inlet Bays,Svc Water Tunnel & CSCS Bypass Line Described in Insp Repts 50-373/99-11 & 50-374/96-11
ML20198P065
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/03/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Subalusky W
COMMONWEALTH EDISON CO.
References
50-373-96-11, 50-374-96-11, NUDOCS 9711060262
Download: ML20198P065 (2)


See also: IR 05000373/1999011

Text

- _ _ - _ _ _ _ _ - - - _ _

.

-

$

l

'

'

,

.

November 3, 1997

Mr. W T. Subalusky, Jr.

Site Vice President

LaSalle County Station

Commonwealth Edison Company

2601 North 21st Road

Marseilles,IL 61341

SUBJECT:

CLARIFICATION LETTER

Reference:

NRC Inspection Report 50-373/96011(DRS); 50-374/96011(DRS)

Dear Mr. Subatusky:

This will acknowledge receipt of your letter dated October 10,1997, regarding a

clarification of actions taken to address inspection requirements for the Lake Screen House

Inlet Bays, Service Water Tunnel, and CSCS Bypass Line as described in the referenced

report. We have reviewed these actions and have no further questions at this time.

Sincerely,

original signed by JM Jacobson/for

John A. Grobe, Director

Division of Reactor Safety

Docket No. 50-373

Docket No. 50-374

!

Enclosure:

W. T. Subalusky letter to NRC

dated October 10,1997

i

See Attached Distribution:

DOCUMENT NAME: G:DRS\\LAS96011.TY

To receive a cow of this document, Indicate in the box "C" = Copy w/o attach /end "E" = Cony wlattach/end *N" = No copy

OFFICE

Rill:DRS

\\ l t)

Rill:DRS

V Rlll:DRM

l

NAME

Duncan/lc (

LougheedW b Grobe N b

DATE

11/SI97

11/cy97

11/1/97 N

'

OFFICIAL RECORD COPY

9711'060262 971103

'

PDR

ADOCK 05000373

lllllllllj ll

G

PDR

ff -p I

1

--

.

.

.

_

.

.

E

W[ Subalusky .

2

November 3, 1997

cc w/o encli

R. J. Manning, Executive Vice President -

Gene *ation

M. Waliace, Senior Vice President,

Corrorate Services -

E. Kraft, Vice President, BWR Operations

Liaison Officer, NOC-BOD '

D. A. Sager, Vice President,

Generation Support

' D. Farrar. Nuclear Regulatory

Services Manager

1. Johnson, Licensing Operations Manager

Document Control Desk - Licensing

F. Dacimo, Plant General Manager

P, Bames, Regulatory Assurance Supervisor

cc w/ encl:

Richard Hubbard

- Nathan Schloss, Economist,

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

i

Distribution:

Docket File w/enct

SRI, LaSalle w/ enc!

R. A. Capra, NRR w/ encl

PUBLIC IE-01 w/enci

C. Pederson, Rlli w/enci

TSS w/enci

OCFO/LFARB w/enci

LPM, NRR w/ enc!

CAA1 w/ encl

DRP w/enci

A; B. Beach, Ritt w/enci

DOCDESK w/ enc!

DRS w/enct

J. L. Caldwell, Rlli w/enci

- Rlli PRR w/ encl

Rill Enf. Coordinator w/ encl

i

.l.

Lamrnianw cattli idm,n Gnupan)

s @

St%

1.a5Jile Generating Statkan

\\

2601 N'>rth list Road

N

,

.

Atarwillen IL 61.441 A)*5"

Tei m.45 .<, oi

I

l

October 10,1997

United States Nuclear Regulatory Commission

Attention: Document Control Desk

Washington, D.C. 20565

'

- Subject:

Clarification to System Operational Performance

Inspection (NRC Inspection Report

No. 50 373/96011(DRS); 50-374/96011(DRS))

LaSalle County Station, Units 1 and 2

Facility Operating License NPF-11 and NPF-18

NRC Docket Nos,50-373 and 50-374

Reference:

G. E. Grant letter to W. T. Subalusky, dated

November 15,1996, Transmitting NRC Inspection

Report 50-373/374-96011

The subject inspection Report, in Section M3.3.b. Observations and

Findinas, states that "The licensee ... clarified the procedure to specify a

~

maximum acceptable sedimentation height," and later, that "The licensee

combined surveillances LTS-600-19 and LTS-600-23 with LTS-1000-4, and

applied the surveillance requirement to the entire lake screen house, thereby

including de service water tunnel and resolving the issue."

During a review by Site Quality Verification, it was identified that the subject

,-

procedures were not changed. Due to the amount of time that has elapsed

since the Inspection, we were unable to determine the cause of the apparent

mis communication t'etween the inspector and our staff, however, the issue

. documented in the Inspection Roport will be resolved as indicated below:

A Technical Specification change has been submitted to revise

the inspection requirements for the Lake Screen House inlet

Bays, Service Water Tunnel and CSCS Bypass Line. The

procedures will be revised to implement the Technical

Specification change following approval, which is currently

.

anticipated in December 1997 (NTS# 373 200-96-00150.05A)

,

rI

\\ $ niOld) ( A SH)pJIM

l0l$ U

'

8-

_

_ __ _- _ _ _ ____ _

_ _ _ - -

h

't

y

. .-

.

LTS-600-19, LTS-600-23 and LTS 1000-4 will be combined

.

into a single survelilance procedure prior to Unit 1 restart

l

(NTS# 373-200-96-00150.05A)

If there are any questions or comments conceming this letter, please refer

them to Perry Bames, Regulatory Assurance Supervisor, at (815) 357-6761,

extension 2383.

Respectfully,

W. T. Subalusky

(

,

Site Vice President

LaSalle County Station

ec:

vA. B. Beach, NRC Region til Administrator

M. P. Huber, NRC Senior Resident inspector - LaSalle

D. M. Skay, Project Manager - NRR - LaSalle

.

6

. _ . - _ . - - . _ _ _ - - _ _ _ .

____-____.._._-___.___m_

_ _ - - _ _ - - _ - _ - -

_

_

__ ____

-

- - - _ _ _ _ _ _

_ _