Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198K862 + (ML20198K862)
- ML20198K863 + (ML20198K863)
- ML20198K864 + (ML20198K864)
- ML20198K865 + (ML20198K865)
- PNO-I-89-055, on 890707,EI Dupont Contracted NRC Region I to Rept That Approx 1,500 3 Inch X 2 Inch Lead Radiation Shields Stolen from Storage Room at Facility.Licensee Reviewed Records & Determined That No Hazard Exists + (ML20198K867)
- ML20198K868 + (ML20198K868)
- ML20198K869 + (ML20198K869)
- PNO-II-89-062, on 890831,Region II Notified by Licensee That Well Logging Tool Containing Two 250 Mci Am-241 Sources Stuck.Licensee & State of AL in Process of Planning How Best to Retrieve Sources + (ML20198K871)
- ML20198K872 + (ML20198K872)
- ML20198K876 + (ML20198K876)
- ML20198K878 + (ML20198K878)
- ML20198K879 + (ML20198K879)
- ML20198K880 + (ML20198K880)
- ML20198K881 + (ML20198K881)
- ML20198K883 + (ML20198K883)
- ML20198K886 + (ML20198K886)
- ML20198K888 + (ML20198K888)
- ML20198K889 + (ML20198K889)
- PNO-III-89-080, on 891122,female Patient Undergoing Brachytherapy Treatment for Cancer Received Radiation Dose 10.5% Larger than Planned.Nrc Medical Consultant Assigned to Case + (ML20198K890)
- ML20198K891 + (ML20198K891)
- ML20198K892 + (ML20198K892)
- PNO-II-89-047, on 890616,loss of Offsite Power W/Resulting Scram from 10% Power.Caused by Breaker 1691 Tripping Which Supplied Power from Unit 3 Startup Transformer to Vital Buses.Senior Resident Inspector Responded & Onsite + (ML20198K894)
- 05000409/LER-1986-017, :on 860512,during 18-month Fire Barrier Surveillance,Small Opening Found in Cable Tray Barrier Between Electrical Equipment Room & Turbine Bldg.Caused by Maint in Area + (ML20198K895)
- ML20198K896 + (ML20198K896)
- ML20198K897 + (ML20198K897)
- ML20198K898 + (ML20198K898)
- ML20198K899 + (ML20198K899)
- RBG-44347, Provides 90-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps + (ML20198K900)
- PNO-II-89-047A, on 890616,loss of Offsite Power W/Resulting Scram from 10% Power (Note Revised Time from Earlier Pn). Caused by Combination of Personnel Error & Equipment Failure. 1B RCP Started,Restablishing Forced Coolant Flow + (ML20198K903)
- ML20198K904 + (ML20198K904)
- ML20198K905 + (ML20198K905)
- ML20198K906 + (ML20198K906)
- ML20198K907 + (ML20198K907)
- ML20198K908 + (ML20198K908)
- ML20198K910 + (ML20198K910)
- ML20198K911 + (ML20198K911)
- ML20198K912 + (ML20198K912)
- ML20198K913 + (ML20198K913)
- ML20198K916 + (ML20198K916)
- ML20198K918 + (ML20198K918)
- ML20198K920 + (ML20198K920)
- ML20198K921 + (ML20198K921)
- ML20198K924 + (ML20198K924)
- ML20198K925 + (ML20198K925)
- ML20198K926 + (ML20198K926)
- ML20198K927 + (ML20198K927)
- ML20198K928 + (ML20198K928)
- ML20198K929 + (ML20198K929)
- ML20198K931 + (ML20198K931)
- ML20198K932 + (ML20198K932)
- IR 05000293/1986009 + (ML20198K933)