Forwards Safety Insp Rept 50-293/86-09 on 860428-0502.No Violations Noted.Little or No Improvement Noted Since Last Insp for Environ TLD Monitoring Program,Due to Lack of QC
ML20198K910
Person / Time
Site: Pilgrim
Issue date: 05/23/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20198K915 List:
References
NUDOCS 8606040161
Download: ML20198K910 (2)


See also: IR 05000293/1986009

Text

. _ - - - - . _ . . _ _ _ _ _ . - -. . . - _ .__ _ - . - - _ .

i .

i

.

I MAY 2 31986

!

!

!

t ,

.

Docket No. 50-293

,.

Boston Edison Company M/C Nuclear i

ATTN: Mr. William D. Harrington ,
Senior Vice President, Nuclear  ;

'

800 Boylston Street

j Baston, Massachusetts 02199

j ,

i Gentlemen:

}

j Subject: Inspection Report No. 50-293/86-09

1

1

A routine safety inspection was conducted by R. Struckmeyer of this office -

on April 28 - May 2, 1986, of activities related to the Environmental Radiation '

Monitoring Program at the Pilgrim Nuclear Power Station. Areas that were

reviewed included sample collection, control of laboratory activities, quality

control, meteorological monitoring, audits, and reports.

Particular emphasis was placed on the enviromental TLD monitoring program due  !

to concerns raised about this program in the last inspection of this area. -

The results of this inspection indicate that there has been little or no

improvement in the TLD program due to a lack of quality control. Most of the  !

improvements discussed in the previous inspection report (50-293/83-08) have l

not been implemented, t

i i

j Within the scope of this inspection, no violations were observed.  ;

! No reply to this letter is required. Your cooperation with us in this matter is  !

appreciated. [

j Sincerely, ,

i Orinical SiSU0d EY' h

l

k

Thomas T. Martin, Director

i

h D ffsion of Radiation Safety l

l and Safeguards  ;

i  !

Enclosure
NRC Region I Inspection Report Nuclear 50-293/86-09

l

?

i  :

i i

I

I

!

r

l

8606040161 860523

PDM

J

e ADOCK 05000293

pon i

, OFFICIAL RECORD COPY IR PILGRIM 86-09 - 0001.0.0 \.

05/20/86 .

I

i

! -

?

_ _-

.

. Boston Edison Company 2

M/C Nuclear

cc w/ encl:

L. Oxsen, Vice President, Nuclear Operations

C. J. Mathis, Station Manager

Joanne Shotwell, Assistant Attorney General

Paul Levy, Chairman, Department of Public Utilities

Chairman, Board of Selectmen

Plymouth Civil Defense Director

J. D. Keyes

Senator Edward P. Kirby

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bcc w/ encl: .

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

W. Raymond, SRI, Vermont Yankee

T. Shediosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

w') l

DRSS: rig $(8 DRSS:RL//2 DRSS:Rii (A[}I

DRSS: R

Struckmeyer/pjRabatin/t Pasciak Bellamy

5/2//86 5/,J/ /86 5/tt/86 5/t.4/86

0FFICIAL RECORD COPY IR PILGRIM 86-09 - 0002.0.0

05/20/86 i

l