Responds to Which Requested Listing of Issues on Millstone Unit 3 & Status of Seabrook Unit 1.NRC Staff Applying Guidelines of Mc 0350 to Restart Approvals of Millstone.Seabrook Shutdown on 971205 to Repair Piping Leak
ML20198K913
Person / Time
Site: Millstone, Seabrook  Dominion icon.png
Issue date: 01/12/1998
From: Travers W
NRC (Affiliation Not Assigned)
To: Davis E
AFFILIATION NOT ASSIGNED
Shared Package
ML20198K919 List:
References
NUDOCS 9801150128
Download: ML20198K913 (6)


Text

_ _ _ _ _ _ _ _ _ _

anuan R, M 8

  • Mr. Edward S. Davis l

Davis & Associates 36 Wamcke Roao Witton, CT 06897-2010

Dear Mr. Davis:

I am responding to your letter of December 14,1997, to the Chairman of the U.S. Nuclear Regulatory Commission (NRC), in which you requested a listing of issues on Millstone Unit 3, and the status of Seabrook, Unit 1.

NRC Inspection Manual Chapter (MC) 0350, " Staff Guidelines for 9estart Approval,"

establishes the guidelines for approving the restart of a nuclear power plant after a shutdown resulung from a significant event, complex hardware problem, or one for which serious management deficiencies have been identified. The NRC staff is applying the guidelines of MC 0350 to the restart approvals of Millstone Units 1,2, and 3 because of NRC concerns regarding the overall effectiveness of the licensee's management. MC 0350 states that the staff should develop a plant-spec.ific restart assessment plan for NRC oversight of each plant startup. The restart assessment plan is to include all expected NRC actions required to be taken before the NRC approvew a plant for restart.

The staff has developed a Restart Assessment Plan (RAP) for each of the Millstone units to incorporate the appropriate aspects of MC 0350 and to address site-specific and unit specific issues. The RAP consists of several major elements that require resolution before plant restart and are related to the root causes for the decline in licensee performance and must be completed prior to restart. A copy of the most recent RAP is enclosed.

With regard to Seabrook station, the plant has had good operational performance marked by 463 days of continuous operation prior to the most recent refueling outage, and more than 100 days of continuous operation following the outage. The plant was shut down on December 5, 1937, to repair a piping leak on the "B" train of the residual heat removal (RHR) system inside containment. Repairs to the RHR piping have been completed While shut down, the licensee has elected to undertake modifications to improve the reliability of the control room air conditioning system. The licensee cxpects to restart the facility in mid-January.

I trust that this information is responsive to your concerns Sincerely, Original Signeu Ly.

"q"~

William D. Travers, Director 1

9 Special Projects Office Office of Nuclear Reactor Regualtion

Enclosure:

Distribution: See next page h

/

Restart Assessment Plan DOCUMENT NAME:G:/ Perch \\ Davis-GT.LTR To receive a copy of this document. Indicate in the box "C" copy wfo attach /enci"E" cop [ wfattach/ encl"N" no copy D:SPD [

OFFICE TA:SPO PM-NRR NAME RPerch k CSmith WTrab DATE 1/ t2198 l'IRJ9kl

{l h OFFICIAL RECORD COPY w

I 9001150126 900112 tu m,i

.g g g6 DR ADOCK 0 25

to E.S.

& datodi l-Distribution:

Dochet Pile (50245, 50 336, 50 423 and 50-443 (w/ original incoming)

PUSUC (wnncoming)-

w/o enclosures

- NRR Mailroom (EDO G970895 w/ incoming)

EDO Control: G970895.

SECY: CRC-971212--

SPO R/F (w/ incoming) _

SCollins

,/

FMiraglia

= RZimmerman c BSheron JRoe

. JCallan, OEDO AThadani, OEDO

- HThompon,' OEDO PNorry, OEDO -

l JBlatw, OEDO

SBurns, OGC HMiller, Rl

)

L.

+

f' i

~.g N 'S EDO Principal Correspondence control FROM:-

DUE: 01/15/98 EDO CONTROL: G970895 DOC DT: 12/14/97 FINAL REPLY:

Edward S. Davis Dnvis & Associates

-TO:-

. Chairman Jackson FOR SIGNATURE OF :

    • GRN CRC NO: 97-1212 Collir.a,-NRR

-DESC:

ROUTING:

STATUS OF MILLSTONE AND SEABROOK PLANTS Callan Thadani Thompson Norry Blaha Burns

-DATE: 12/31/97 Miller, RI ASSIGNED TO:

CONTACT:

,NRR Collins SPECIAL INSTRUCTIONS OR.,EMARKS:

NRR RECEIVED:

JANUARY 2, 1998 NRR ACTION:

TRAVERS: SP0 NRR ROUTING:

COLLINS-.

ACTION MIRAGLIA 4

~~

ZIMMERMAN 4

SHERON

! DUE I G R D R E C T 0 ! 's 0 l: E; g-R0E NRR MAILROOM L.

Q{h--

-),

v

g

^

- 11g t

c

~..

e

~.

4

g .

e t-1 OFFICE.lOF THE SECRETARY'-

-.L
1. i.

~

(

r.-

,r

/CORRESPONDENCEiCONTROL TICKET:

^

s,

.1 '

{

PAPER NUMBER 4

--CRC-97f1212-LOGGING:DATE:cDec 30 97-.

! ACTION. OFFICE:J

.-EDO:..

I

AUTHOR'f.

. EDWARD DAVISi s

!AFFILIATIONM

' CONNECTICUT.

4

' ADDRESSEE.

CHAIRMANsJACKSON:

Dec114197:

FILE CODE: 2: IDR15--MILLSTONE.

iLETTER-DATE:s

-~

t

SUBJECT:

~'

l STATUS OF MILLSTONE-AND:SEABROOK PLANTS.-

l ACTION:1 Direct:: Reply; DISTRIBUTION:

CHAIRMAN SPECIAL.HANDLINGi SECY TO'ACK

-CONSTITUENT:

a

NOTESt.
i DATEl DUE : --

Jan 15_98-DATE SIGNED:

SIGNATURE:

AFFILIATION:

_ f.)

'f r

L s

h.

9

\\

-?,

M EDO

- G970895

~

' ' ~ ~

b-

~

t o

Edward S. Davis, P.E.

36 Warncke Road

,7 Wilton, CT 06897 (203) 762-3839 OBJECTIVE To obtain a part-time position at a college or-university utilizing extensive experience counseling, advising and retraining people of diverse cultural, ethnic and educational backgrounds in the United States, Canada and Venezuela.

SUMMARY

OF Over forty years experience leading, evaluating, QUALIFICATIONS supGrvising, training, teaching, eutraining and placing candidatec in better and more fulfilling positions.

Extensive expertence as a project manage-ment and control consultant for clients in design, construction, engineering banking, f i na n5[1a l,

' Eh atma c eu t i c a l7uTITi t yi,maRu f a c t u r i nfa~n'd ruisn p-1.t

~lga ni z a { Tons.

Curr5if1y warliiWW1Th Miitua1 Hol-5 ng o

~

Association of Southwestern Connecticut as a part-time volunteer to assist with the design and building of 50-;60 units of affordable housing in Wilton.

Possess a yhighly developed "can do" ability to assess the existing situation and human resources available and develop a viable, cost effective and efficient plan of action.

RETRAINING Developed numerous action plans and assisted in their implementation when companies reorganized, entered new types of business activities or shut down older facilities.

In some of these situations worked with local, state or federal employment and education agencies to ease the r(training and outplacement problems of dislocated workers.

Also, retrained existing employees for more demanding assign:ents, when required.

ADMINISTRATION Acted as Director, Planning and Control for Hycro-Quebec, Montreal, Canada for two years developing _and_

implementing a $4.4 billion _ program to design and build

.a Canadian type heavy water nuclear reactor, a ' h~yiiro ~~

electric dam, more thin 5000 miles of high voltage electric transmission lines and a computer controlled demand system for electric distribution throughout the entire province of Quebec from the northern United States border to Hudson Bay.

Started with four other consultants, selected 40 people from within Hydro-Quebec or other Canadian companies and trained them to necessary positions in engineering, scheduling, cost control and administration.

1

L

'..> ?

. 3 y j TEACHING:

Developed-and taught,,more than sixty times, a three.

- day-seminar and workshop on administration and control '

of-.any -type - of = project or _ program = to achieve schedule,.

cost and quality objectives.-

In Venezuela,jthis=was-the-initial' phase of two assignments (taught inLSpanis and--English simultaneous 1yl-forsthe government-ownedf steel:and petro-chemical corporations, S IDOR ;andi 1VP.-

Worked with other-American and European; consultants to-select-and : retain local-employees to-fill-the newly.

created jobs at every level of the organization.

Possess the ability to motivate personnel: to challenge themselves and succeed under any circumstances.

-MILITARY SERVICE

- Active-duty 1955-1957 Resident Officer-in-Charge of Construction. U. S.-Naval Air Test 1

Center, Patuxent River, Maryland, l

- Reserve duty, 1957-1963, Training Officer, Construction Battalion #42, New Rochelle, New lork.

EDUCATION

- Completed all. course work for Masters in Business Administration. Graduate School of Businens Administration, New York University, 1962.

- Bachelor of Civil Engineering, Rensselaer Polytechnic Institute, Troy, New York, 1950 (attended on full tuition scholarship.)

RELATED

-- President, Davis & Associates, project-EXPERIENCE management and control consultants, 1970-199phP '

- Senior Associate. Booz. Allen and Hamilton, Inc., New York.-New York, Project Management and Control Division, 1965-1970.

- Project Manager, Olin Corporation. Chlorine-Caustic Soda Project, Augusta, Georgia, 1963-1964.

- Supervisor, Program Administration. AMF Government Products Group. Stanford, Connecticut,- 1961-1962.

- Manager of Project Control and other field positions. Foster Wheeler Corporation, Now York, New York and Arco, Idaho, 1950-1961.

- _ _ _ - _ _ - _ _ _ _ _ - - _ _ _ _ _ _ - _ _ _