Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000369/1985034 + (ML20198A440)
- ML20198A443 + (ML20198A443)
- ML20198A444 + (ML20198A444)
- ML20198A445 + (ML20198A445)
- ML20198A446 + (ML20198A446)
- 05000364/LER-1983-022, Forwards LERs 83-020/03L-0 & 83-022/03L-0.W/o LER 83-022/03L-0 + (ML20198A447)
- ML20198A448 + (ML20198A448)
- ML20198A452 + (ML20198A452)
- 05000364/LER-1983-020-03, /03L-0:on 830420,steam Generator Pressure Transmitter PT485 Instrumentation Loop Declared Inoperable. Caused by Setpoint Drift of Printed Circuit Card.Card Replaced & Instrument Loop Declared Operable + (ML20198A453)
- ML20198A454 + (ML20198A454)
- ML20198A458 + (ML20198A458)
- 05000458/LER-1985-009, :on 850926,reactor Water Cleanup Containment Isolation Initiated When Temp Reading Obtained from Leak Detection Differential Temp Switch.Caused by Flaw in Switch Design.Mfg Mod to Circuitry Recommended + (ML20198A459)
- 05000352/LER-1985-078, :on 850831,Tech Spec Surveillance Test for Control Rod Operability Not Performed.Caused by Personnel Error.Surveillance Test Performed on 851001.Test Now Listed on Weekly Schedule + (ML20198A461)
- ML20198A462 + (ML20198A462)
- ML20198A467 + (ML20198A467)
- ML20198A469 + (ML20198A469)
- ML20198A470 + (ML20198A470)
- ML20198A472 + (ML20198A472)
- ML20198A474 + (ML20198A474)
- PNO-III-98-058A, on 981214,update of Fire in Process Made. Insp Exit Meeting,Open to Public,Will Be Scheduled in Early Jan.Certificate Holder,Us Enrichment Corp,Continuing Its Investigation of Fire,Including Determination of Causes + (ML20198A475)
- ML20198A478 + (ML20198A478)
- ML20198A479 + (ML20198A479)
- B11796, Forwards Response to Generic Ltr 85-09 Requesting Proposed Tech Specs Needed to Meet Requirements of Generic Ltr 83-28, Item 4.3 Re Reactor Trip Sys Reliability.No Changes to Tech Specs Required + (ML20198A480)
- BVY-97-173, Fulfills Util Commitment in Response to Violations Noted in Insp Rept 50-271/97-201 + (ML20198A481)
- ML20198A487 + (ML20198A487)
- ML20198A488 + (ML20198A488)
- ML20198A489 + (ML20198A489)
- ML20198A492 + (ML20198A492)
- ML20198A493 + (ML20198A493)
- 05000483/LER-1997-010, :on 971118,inadequate Testing of Ssps Was Noted.Caused by Inadequate Vendor Testing Design/ Instructions of Subject Ssps Circuitry.Work Instructions Were Written to Test Affected Logic Circuits + (ML20198A494)
- ML20198A495 + (ML20198A495)
- ML20198A496 + (ML20198A496)
- ML20198A497 + (ML20198A497)
- ML20198A501 + (ML20198A501)
- ML20198A503 + (ML20198A503)
- ML20198A504 + (ML20198A504)
- ML20198A505 + (ML20198A505)
- ML20198A508 + (ML20198A508)
- AECM-85-0350, Discusses Util Commitments Resulting from Proposed Tech Spec Changes Re Acceptable High/Low Pressure Boundary Design for RHR Headspray Line.Handswitches Will Be Removed from Remote Shutdown Panel for Valves E12-F023 & E12-F394 + (ML20198A510)
- ML20198A511 + (ML20198A511)
- ML20198A512 + (ML20198A512)
- ML20198A513 + (ML20198A513)
- ML20198A514 + (ML20198A514)
- PNO-III-98-059, on 981214,Campbell-Pacific Portable Moisture Density Gauge Containing 10 Mci Cs-137 & 50 Mci Am-241 Sealed Sources Stolen from Licensee Locked Const Trailer. Licensee Notified Charleston Police Dept of Theft + (ML20198A515)
- ML20198A516 + (ML20198A516)
- ML20198A517 + (ML20198A517)
- ML20198A519 + (ML20198A519)
- ML20198A520 + (ML20198A520)
- ML20198A521 + (ML20198A521)
- ML20198A527 + (ML20198A527)
- ML20198A530 + (ML20198A530)