ML20198A517
| ML20198A517 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/16/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20198A522 | List: |
| References | |
| NUDOCS 8511060044 | |
| Download: ML20198A517 (1) | |
See also: IR 05000321/1985028
Text
9
[et Oc
o
UNITED STATES
o
NUCLEAR REGULATORY COMMISSION
3
- i
REGION ll
- I
j ,
101 MARIETTA STREET. N.W.
' j
ATLANTA. GEORGI A 30323
- '
V
% *****
l 0
,,2 .' '.
,
,
, . . .
Georgia Power Company
ATTN:
Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
REPORT NOS. 50-321/85-28 AND 50-366/85-28
On September 23-27, 1985, NRC inspected activities authorized by NRC License
Nos. OPR-57 and NPF-5. for your Hatch facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examinad during the inspection are identified in the report. Within these
areas, the inspe-tion consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or devistions were identified.
Should you have any questions concerning this letter, please contact us.
S cerely,
M'
^
i
Bro le
1e
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Repc-t Nos. 50-321/85-28
and 50-366/85-28
cc w/ encl:
J. T. Beckham, Vice President and
General Manager-Nuclear Operation
H. C. Nix, Site General Manager
P. E. Fornel, Site QA Supervisor
L. Gucwa, Chief, Nuclear Engineer
)
8511060044 851016
{'u. -
ADOCK 05000321
" DESIGNA ' ORIGINAD.
G
artified By
b,
'
/ JEol
t(