ML20198A488
| ML20198A488 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 12/12/1985 |
| From: | Kirsch D, Kirsch Dd NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Tait T AFFILIATION NOT ASSIGNED |
| Shared Package | |
| ML20198A327 | List: |
| References | |
| FOIA-86-46 NUDOCS 8605210112 | |
| Download: ML20198A488 (1) | |
Text
,
,a uco
/
jo UNITED STATES y
g NUCLEAR REGULATORY COMMISSION j
REGION V
,f 1450 MARIA t.ANE. SUITE 210
- 'g ***.*g WALNUT CREEK CALIFORNIA 94596 December 12, 1985 Mr. Thomas Tait 6761 West Ocotillo Lane Peoria, Arizona 85343
Dear Mr. Tait:
Subj ect: Allegation RV-85-A-0065 This refers to your telephone call on September 10, 1985, in-which you expressed concerns related to Bechtel's electrical construction activities at Palo Verde Nuclear Generating Station.
We have attempted to look into your concerns; however, before we can proceed further, we need additional information from you.
Please provide us specific safety concerns of which you have first-hand knowledge, such as a particular system, or responsible individuals who failed to perform their safety or quality functions. Such information is necessary for us to conduct a meaningful investigation of your concerns. I would appreciate it if you
~
would provide this information to us, in writing, with as much detail as possible, or call me collect at (415) 943-3700 within 30 days after you receive this letter.
If we do not hear from you by then, it will be assumed that your concerns are resolved and this matter will be closed.
Your cooperation and assistance is appreciated.
Sincerely, D. F. K rsch, Deputy Director Division of Reactor Safety and Projects 8605210112 860321 PDR FOIA SCOTT 86-46 PDR
)
-=
-