Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196J076 + (ML20196J076)
- ML20196J077 + (ML20196J077)
- ML20196J078 + (ML20196J078)
- PNO-III-88-058, on 880623,reactor Scrammed from 84% Power Due to Turbine Trip.Caused by Damaged Latching Mechanism in Turbine Control Sys.Latching Mechanism Repaired + (ML20196J079)
- ML20196J080 + (ML20196J080)
- IR 05000285/1998008 + (ML20196J081)
- ML20196J082 + (ML20196J082)
- ML20196J083 + (ML20196J083)
- ML20196J084 + (ML20196J084)
- ML20196J085 + (ML20196J085)
- 05000382/LER-1998-019-01, Forwards LER 98-019-01,IAW 10CFR50.73(a)(2)(ii). LER 98-019-00,discussed.Refs to Feedwater Valves Have Been Deleted in Revised LER + (ML20196J086)
- ML20196J088 + (ML20196J088)
- ML20196J090 + (ML20196J090)
- ML20196J093 + (ML20196J093)
- ML20196J095 + (ML20196J095)
- ML20196J098 + (ML20196J098)
- ML20196J100 + (ML20196J100)
- 05000382/LER-1998-019, :on 980920,failure of Containment Isolation Valves to Close During Testing Was Noted.Caused by Solenoid Failures.Solenoids Were Replaced & Valves Were Retested Successfully + (ML20196J101)
- ML20196J103 + (ML20196J103)
- ML20196J104 + (ML20196J104)
- ML20196J105 + (ML20196J105)
- ML20196J106 + (ML20196J106)
- ML20196J107 + (ML20196J107)
- ML20196J108 + (ML20196J108)
- IR 05000456/1988018 + (ML20196J110)
- ML20196J111 + (ML20196J111)
- TXX-8828, Final Deficiency Rept CP-87-40 Re Electrical Isolation Between Class 1E and non-Class 1E Equipment.Initially Reported on 870715.Isolation Devices Will Be Installed by 880808 for Unit 1 & by Fuel Date for Unit 2 + (ML20196J112)
- ML20196J113 + (ML20196J113)
- ML20196J115 + (ML20196J115)
- ML20196J116 + (ML20196J116)
- ML20196J118 + (ML20196J118)
- ML20196J119 + (ML20196J119)
- IR 05000293/1997002 + (ML20196J120)
- ML20196J120 + (ML20196J120)
- ML20196J123 + (ML20196J123)
- ML20196J126 + (ML20196J126)
- ML20196J127 + (ML20196J127)
- ML20196J128 + (ML20196J128)
- ML20196J131 + (ML20196J131)
- ML20196J134 + (ML20196J134)
- 3F0797-21, TS Change Request 209,Rev 1 for License DPR-72,adding EDG Kilowatt Indication to post-accident Monitoring Instrumentation to Support CR-3 Restart Issue of EDG Load Mgt + (ML20196J135)
- ML20196J136 + (ML20196J136)
- ML20196J138 + (ML20196J138)
- ML20196J139 + (ML20196J139)
- ML20196J143 + (ML20196J143)
- ML20196J144 + (ML20196J144)
- ML20196J145 + (ML20196J145)
- IR 05000295/1988012 + (ML20196J149)
- ML20196J150 + (ML20196J150)
- IR 05000289/1998007 + (ML20196J151)
- ML20196J152 + (ML20196J152)