OPERATING DATA REPORT Dock;t No.:
50-309 DOto:
02/tter /CJ Completed By:
D.A. divard Telephone:
207-882-6321
- 1. Unit Name.......................................
Maine Yankee
- 2. Reporting Pericd................................
February 1988
- 3. Licensed Thermal Power (MWt)....................
2630 4
Nameplate Rating (Gross MWe)...................,
864
- 5. Design Electrical Ra';ing (Net MWe)............
825
- 6. Maximum Dependable Capacity (Gross MWe).........
850
- 7. Maximum Dependable Capacity (Net MWe)...........
810 C.
If Changes in Capacity Ratings (Items Number 3-7)
Since Last Report, Give Reasons:
NO CHAMC55
~.
9., Power Lowwl to Which Restricted, if Any (Net MWe)
- 10. Reasons for Restrictions, if Any:
THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. Hourn In Reporting Period 696.00 1.440.00
- 12. Number of Hours Reactor Was Critical...........
696.00 1.423.92 107.277.24
- 13. Reactor Reserve Shutdown Hours..................
0.00 0.00 0.00
- 14. Hours Generator On-line..
696.00 1.410.78 104.165.86
- 15. Unit Reserve Shutdown Hours..................
0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH)........
1.801.731.00 3.672.882.00 230.033.213.00
- 17. Gross Electrical Energy Generated (MWH)........
564.700.00 1.155.620.00 70.044.350.00
- 18. Net Electrical Energy Generated (MWH)........
545.939.00 1.117.480.00 74.588.452.00
- 19. Unit Service Factor......
100.00 97.97 77.67
- 20. Unit Availabilty Factor..
100.00 97.97 77.67
- 21. Unit Capacity Factor (Using MDC Net)........
96.84 95.81 70.22
- 22. Unit Capacity Factur (Using DER Net)........
95.08 94.06 68.43
- 23. Unit Forced Outage Rate..
0.00 2.03 7 2H_
- 24. Shutdowns Scheduled Over Next 6 Months:
NONE-
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
N/A t
.e f,[' b'
^
8803140156 880229 i
PDR ADOCK 05000309
\\
R DCD i
Docket No:
50-309 Unit Name:
Maine Yankee Date:
01/ MAR /88 Completed By:
D.A.
Rivard Telephone:
207-882-6321 4
Report Month: February, 1988 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES At the beginning of the month, the unit was operating at 100% power.
On 3 February, power was reduced to 75% tu perform turbine valve and excess flow check valve testing, and maintenance on "B" travelling water screen.
On 4 February, power was retur.ud to 100%.
Later on 4 February, power was reduced to 49% in order to isolate a leak in the main turbine control oil system.
Repairs to the turbine control cil system were complete and power was returned to 100% on 5 February.
On 29 February, power was reduced to 91% during the recovery of a dropped CEA and then returned to 100%
At the end of the month, the unit was operating at 100% power.
1
~
AVE. RAGE' DAILY UNIT POWER LEVEL FOR FEBRUARY 1988 Docket No.:
50-309 Unit:
Maine Yankee Date:
02/ Mar /88 Completed By:
D.A.
Rivard Telephone:
207-882-6321 o
Day Avg. Daily Power Level Day Avg. Daily Power Leve:
(MWe-Net)
(MWe-Net) 1 799 16 797 2
798 17 797 3
645 18 801 4
727 19 801~
5 651 20 793 6
796 21 798 7
796 22 796 8
799 23 798 9
799 24 796 10 794 25 797 11 799 26 800 12 798 27 795 13 800 28 797 14 790 29 793 15 798 1
1
' NIT' SHUTDOWNS AND POWER REDUCTIONS Docket No.:
50-309 p
FOR FEBRUARY 1988 Unit:
Maine Yankee Date:
02/ Mar /88 Completed By:
D.A.
Rivard Telephone:
207-882-6321 Page:
1 of 1 Number L.
R.
to 75%
L.
R.
TO 49%
Dnte 880203 880204 Type (1)
S F
Duration (llours)
O O
Raason (2)
B A
Msthod (3) 4 4
LER #
N/A N/s System Code (4)
HA HA Component Code (5)_.
VALVEX-C VALVOP-C Reduced power for Power was reduced turbine valve and to isolate a leak excess flow check in the turbine valve testing, and control oil Cause and "B" travelling system.
The weld-Corrective water screen joint was repaired Action maintenance.
and the unit returned to 100%
power.
l 1.
TYPE:
2.
REASON: (cont) 4.
SYSTEM CODE:
(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data l
H-Other (Explain)
Entry Sheets for 2.
REASON Licensee Event Report A-Equipment Failure 3.
METHOD:
(LER) File (NUREG.0161) l-C-Refueling 2-Manual Scram 5.
COMPONENT CODE:
B-Maintenance or Test 1-Manual D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &
4-Other (Explain) as above.
l License Examination
4 MaineYankee REttABLE ELECTAICITY FOR MAINF SINCE 1972 EDISON DRIVE. AUGUSTA, AINE 04330.(207) 623-3521 March 8, 1988 HN-88-25 GDH-88-54 United States Nuclear Regulatory Commission Attention: Document Control Desk Hashington, D. C.
20555
References:
(a) License No. DPR-36 (Docket No. 50-309)
(b) NUREG-0020, Licensed Operating Reactors Status Summary Report
Subject:
Maine Yankee Monthly Statistical Report Gentlemen:
Enclosed you will find _the Monthly Statistical Report for the Haine Yankee Atomic Power Station for February, 1988.
Very truly yours, HAINE YANKEE 0)/$ AV G. D. Whittier, Manager Nuclear Engineering and Licensing GDH/pib Enclosure cc: Mr. Richard H. Hessman Mr. Hilliam T. Russell Mr. Pat Sears Mr. Cornelius F. Holden 9599L-LHO
--